← All articles
How-To Guide

How to Actually Finance
a Renovation in Canada

Mar 6, 2025 · 8 min read · By Dream Touch Renovations Ottawa

How to Actually Finance a Renovation in Canada
← All articles

Most Ottawa homeowners I sit down with have already saved some cash for the renovation, but not all of it. The gap between what they have and what the project costs is the financing question. And the answer isn't always the obvious one.

Banks push HELOCs because they're profitable for the bank. Mortgage brokers push refinances because they earn on the new mortgage. Your father-in-law tells you to never borrow against the house. None of those people are looking at your specific situation.

Here's what each option actually costs, when each one makes sense, and the order I walk Ottawa clients through when we map out how to pay for a project, whatever its scope. Financing rates and lender figures below reflect early 2026.

Option 1: Cash (Yes, Really, Sometimes)

If you have the cash, the math for using it is simple: you save the interest. On a large balance carried at a 6.5% HELOC rate over 5 years, the interest adds up fast. Cash skips that.

The argument against cash is opportunity cost. If your investments are returning 7-9% and you can borrow at 6%, the spread (1-3%) is the cost of using cash. For most homeowners that spread isn't large enough to justify the risk and complexity of borrowing. Cash is the right answer more often than financial advisors admit.

The exception: if using cash empties your emergency fund. Don't go below 3 months of expenses in liquid savings to fund a renovation. A water heater failing in February is not the time to be cash-poor.

Option 2: HELOC (Home Equity Line of Credit)

A HELOC is a revolving credit line secured against your home equity, capped at 65% of appraised value (combined with mortgage, max 80% loan-to-value).

2026 rates: Prime + 0.5% to Prime + 1.5% at major banks. With Prime at 4.95%, that's roughly 5.45% to 6.45%. Variable rate, moves with Bank of Canada decisions.

Setup costs: Expect an appraisal fee plus legal fees if a new charge against title is required. Some banks waive these on a HELOC switch.

When it makes sense:

When it doesn't:

Pro tip

Apply for the HELOC limit before you need it. Banks evaluate your income, credit, and equity at application. If you wait until your renovation is in progress and your spouse just changed jobs, you may not qualify for what you would have got six months earlier.

Option 3: Mortgage Refinance

You break or extend your existing mortgage and roll the renovation cost into a new, larger mortgage. You can borrow up to 80% of your home's appraised value.

2026 rates: 4.49% to 5.39% on a 5-year fixed at most lenders, occasionally lower through brokers. Significantly cheaper than a HELOC.

Setup costs: A mortgage break penalty (often the greater of 3 months interest or the interest rate differential, which climbs steeply if you have a low fixed rate locked in), plus appraisal, legal fees, and title insurance.

When it makes sense:

When it doesn't:

Option 4: CMHC Improvement Mortgage Insurance Program

If you're buying a home and renovating it, or you bought recently and are renovating, CMHC insures a mortgage up to 95% of the post-renovation appraised value, including the renovation cost. The mortgage insurance premium applies to the full amount.

2026 rates: Same as a regular insured mortgage, currently 4.39% to 5.19% on 5-year fixed.

Setup costs: CMHC premium of 2.8% to 4.0% of the loan amount, added to the mortgage. Plus standard appraisal and legal fees. Two appraisals are typically required (current value and post-renovation value).

When it makes sense:

When it doesn't:

Option 5: RRSP Home Buyers' Plan (Limited Use Case)

Worth mentioning because people ask. The Home Buyers' Plan lets you withdraw a capped amount from your RRSP tax-free for buying a first home, with a 15-year repayment schedule. It is not a renovation financing tool.

The related program that does apply: the RRSP Home Buyers' Plan can be used for renovations only if you're a person with a disability (or related to one) buying or renovating a home to be more accessible. Otherwise, the RRSP withdrawal for a renovation is a taxable event and a bad idea.

The better RRSP-adjacent move: if you've taken a tax-deductible loan to invest, you may be able to restructure debts so the renovation is funded by the lowest-cost source while preserving the deductible character of investment loans. Talk to an accountant before making this move.

Option 6: Personal Loan or Renovation Loan

Unsecured personal loans run 8-13% in 2026 at major banks, lower (6-9%) at credit unions like Alterna or Your Neighbourhood. Renovation-specific loans from credit unions sometimes get to 6.5-8%.

When it makes sense:

When it doesn't:

The cheapest financing is the one that matches the renovation timeline. Variable rates for projects you'll pay off in 2-4 years, fixed rates for projects you'll carry for 8-15 years, cash for projects you can absorb without breaking your liquid reserves.

Bank vs. Mortgage Broker (The Question Everyone Has)

Going directly to your bank gets you one rate, from one lender, with one underwriter. Going through a mortgage broker gets you 30+ lender options shopped on your behalf, often including B-lenders the big banks won't tell you about.

For renovation financing specifically, a broker is usually the better call because:

The exception: if you have a strong existing relationship with a private banker at one of the big 5, they sometimes have discretion on rates and fees that a broker can't access.

Federal and Ontario Programs Worth Knowing

Two programs that occasionally apply to Ottawa renovations in 2026:

Both programs have application rules and approval steps. Apply before the work starts, not after. Receipts dated before the application date don't qualify.

The Order I Recommend Walking Through

For most Ottawa homeowners with a typical renovation, here's the decision tree:

  1. Use cash to the point you keep 3 months of liquid emergency reserves.
  2. For the gap, if your renovation is modest and you'll pay it off in 3 years, use a HELOC.
  3. If your renovation is mid-sized and your existing mortgage isn't a low-rate prison, refinance and roll it in.
  4. If your renovation is large (addition, coach house, full house gut), refinance into a longer amortization, or use a HELOC for staged draws and refinance at next renewal.
  5. If you don't qualify for a HELOC or refinance, look at a credit union renovation loan before a bank personal loan.
  6. Leave the Greener Homes Loan out of the plan: it is closed to new applications.

And: get the renovation quote before you finalize the financing. Not a guess. A real, fixed-price quote with line items so you know exactly what you're borrowing for. We work with several Ottawa-based mortgage brokers we trust, and we walk every financing conversation through with our clients before construction starts. The right financing structure is part of a good renovation.

Frequently asked questions

Should I use cash or borrow to pay for a renovation?

Cash is the right answer for a renovation more often than financial advisors admit, because paying cash saves all the interest a loan would carry. The case against cash is opportunity cost: if investments return 7 to 9 percent and borrowing costs 6 percent, the spread of 1 to 3 percent is the cost of paying cash.

The firm exception is draining the emergency fund. Keep at least 3 months of expenses in liquid savings before putting cash into a renovation.

When does a HELOC make sense for renovation financing?

A HELOC fits a renovation that is staged or phased, because funds are drawn as the work progresses and no interest is paid on money not yet spent. A HELOC works best when the balance can be paid off in 3 to 7 years and the line will not be used for other spending.

In early 2026, HELOC rates ran from Prime plus 0.5 to Prime plus 1.5 percent at major banks, a variable rate. With less than 25 percent equity, a HELOC is a poor fit.

Is refinancing my mortgage better than a HELOC for a big renovation?

A mortgage refinance often suits a large renovation such as a full gut, addition or coach house, because 5-year fixed rates in early 2026 ran 4.49 to 5.39 percent, well under HELOC rates. A refinance allows borrowing up to 80 percent of appraised value over a long amortization.

The catch is the break penalty. A sub-2 percent mortgage from 2021 can carry a penalty that kills the math, while a mortgage up for renewal within 6 to 12 months carries none.

How does the CMHC Improvement Mortgage Insurance program work?

The CMHC Improvement program insures a mortgage up to 95 percent of the home's post-renovation appraised value, including the renovation cost, for people buying a fixer-upper or renovating a recent purchase. The CMHC premium runs 2.8 to 4.0 percent of the loan and is added to the mortgage.

Two appraisals are typically required, one for current value and one for post-renovation value. The program makes sense without 20 percent equity, and not once equity tops 25 percent.

Should I use a bank or a mortgage broker for renovation financing?

A mortgage broker is usually the better call for renovation financing. HELOC rates vary by 0.5 to 1.0 percent across lenders, and a broker shops more than 30 lenders, including B-lenders the big banks do not mention. Brokers also know which lenders accept self-employed, contract or rental income.

The broker's commission is paid by the lender, so the service is free to the borrower. The exception is a strong relationship with a private banker at a big bank, who may have discretion on rates.

Official references

Need a real quote to finalize your financing?

Free in-home consultation. Fixed-price quote with line items. Broker referrals if you want them.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →