← All articles
How-To Guide

How to Maximize Small Spaces
in a Renovation

Sep 28, 2025 · 7 min read · By Dream Touch Renovations Ottawa

How to Maximize Small Spaces in a Renovation (Ottawa Tactics)
← All articles

The Glebe semi I worked on last fall was 1,180 square feet on three floors. The owners had two kids, a home office, a dog, and a record collection. They thought they needed an addition. They didn't. They needed someone to find the 90 square feet of usable floor space their existing house was wasting.

Ottawa is full of these homes: 1.5-storey wartime bungalows in Westboro, 1920s rowhouses in Hintonburg, 1960s split-levels in Alta Vista, 1,400-square-foot freehold townhomes in Barrhaven and Stittsville. They were not designed for the way we live now. But almost every one of them has reclaimable space hiding in plain sight.

Here is how my team finds it.

Stop Thinking in Floor Plans, Start Thinking in Cubic Feet

Most homeowners look at a small room and ask "where can I put more stuff on the floor?" Wrong question. Look up. Most rooms have 8 to 9 feet of ceiling and use the bottom 6 feet. Above that is wasted air.

What you can do with the top 2-3 feet:

Reclaimed Dead Space (Where the 90 Square Feet Hide)

Every Ottawa home has them. Walk through and you will see at least three. Most homeowners do not, because the dead space looks like part of the house.

Under the stairs

The classic. In a typical 1.5-storey or 2-storey, the volume under the stairs is 25-50 cubic feet of cabinet space, more than half a typical hallway closet. Options that actually work in Ottawa homes:

Soffits and bulkheads

The boxed-in space above kitchen cabinets, between rooms, or at the corner of a basement is usually empty. Sometimes it is housing a duct or a beam, sometimes it is just lazy framing from 1972. Have your contractor open one and find out. Half the time it is reclaimable for cabinets, recessed niches, or a flush-mount LED.

Kneewalls in 1.5-storey homes

The 1.5-storey is one of Ottawa's most common formats: bungalows in Westboro, Manor Park, and Britannia where the upper floor has a sloped ceiling and short walls (the kneewalls) at the perimeter. Behind those kneewalls is 18-36 inches of unfinished space running the full length of the wall. That is 60-120 cubic feet per side, two sides per room, lost.

What we put in there:

Stair landings and corners

The half-landing on a typical Ottawa split-level is usually 3x4 feet of dead floor with a window above. Add a 14-inch deep built-in bench with drawer storage and a coat hook bar, you have a mudroom that did not exist before.

Pro tip

uto.fb7a52e3">Pro tip

Walk your house with a tape measure and a notebook. Every closet, every soffit, every dead corner. Note the dimensions and the function. You will find 40-80 cubic feet of unused volume in any Ottawa home built before 2000. That is enough storage to delay a basement reno by five years.

Dual-Purpose Rooms (the Honest Version)

Pinterest is full of dual-purpose rooms that do not actually work. Here is what does, and what does not, in real Ottawa homes:

Works:

Does not work:

The dual-purpose rooms that actually work share a quality: the two functions never need to happen at the same time. The ones that fail try to fit both functions into the same Tuesday evening.

Light and Colour (Free Square Footage)

You cannot make a 9x11 kitchen physically bigger without moving a wall, but you can make it feel 30% bigger with light and colour. Three rules I follow on small Ottawa kitchens and bathrooms:

  1. One light source per 25 square feet of floor. A 9x11 kitchen needs at least four points of light, not one ceiling fixture.
  2. Light walls, slightly lighter ceiling, slightly darker floor. The ceiling becomes the lid of the room. Painting it the same colour as the wall (in eggshell, not flat) erases the corner and the room reads taller.
  3. Glass on at least one cabinet bank. All-solid uppers in a small kitchen feel like a wall. One run of glass-fronted cabinets at the end gives the eye a place to rest and the wall feels lighter.

On colour, neutral does not mean boring. Warm whites with grey undertones (not yellow undertones) read clean in Ottawa's flat winter light. Save the saturated colour for accents (one wall, one cabinet, one tile run) so the eye has somewhere bold to land but the room itself stays open.

Fold-Down and Extending Furniture

Small-space living is a furniture problem as much as a renovation problem. The renovation creates the space; the furniture decides whether you actually use it.

Niche-Style Recesses (Where Walls Become Storage)

Inside every interior wall is 3.5 inches of stud-bay depth. A 14.5-inch wide bay between studs is enough for a recessed niche, a medicine-cabinet-style storage panel, or a built-in spice rack.

Real applications I have built in Ottawa homes:

Pro tip

Niches are free real estate, but only if the wall is non-load-bearing and the bay is empty. Have your contractor scope out the wall with a stud-finder and an inspection camera before you commit. Hitting a duct, a pipe, or a structural element on day-of-tile turns a simple niche into a costly rerouting problem.

The Short Version

Small Ottawa homes are not a problem. They are a design challenge that rewards specific tactics: think in cubic feet, hunt the dead space, pick dual-purpose rooms that work, use light and colour to fake square footage, choose furniture that earns its footprint, recess where the wall is empty.

If you want a contractor's eye on your space (the spots in your house that are quietly wasting 60+ cubic feet), our free 48-hour feasibility review is the easiest way to start. Call 613-862-4555 or book through our contact page, and bring a tape measure to the walkthrough. We will find space you did not know you owned.

Ready to find the hidden space in your home?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →
Free Quote →