The morning demo starts on a kitchen in Hintonburg, my crew shows up at 7:30. The homeowner is still in pyjamas, the dog is barking behind a baby gate, the cookbooks are still on top of the cabinets, and the kids are upstairs trying to get ready for school. Two hours later we are working on a stress problem instead of a kitchen problem.
The week before demo is the most underrated week of any renovation. Done right, it makes the next eight weeks bearable. Done wrong, it sets a tone the project never recovers from. Here is the prep list I send every Ottawa client at the contract signing, in the order it gets done.
1. Dust Containment Plan (Two Weeks Out)
Renovation dust is not regular dust. It is fine drywall powder, sanding residue, plaster particles, and on older Ottawa homes (anything pre-1980) sometimes vermiculite or lead paint debris. It travels through HVAC returns, crawls under door sweeps, and settles on every horizontal surface in your house if you let it.
What good containment looks like:
- 6-mil poly walls from floor to ceiling sealing the work zone, taped to the floor with low-tack tape so it does not lift the finish.
- ZipWall poles across openings without a door, so plastic stays tight as people pass through.
- Negative air machine with a HEPA filter venting out a window, pulling dust away from the rest of the house.
- Tacky mats at every threshold so boots leaving the work zone drop the worst of it.
- HVAC return covers in the work zone (more on that below).
If your contractor's "containment plan" is a bedsheet duct-taped to a doorframe, find a different contractor. Real containment takes proper materials and an hour of setup. It is not optional.
2. Route Protection (One Week Out)
Map the path your crew will walk every day from the front door to the work zone. That route is going to take 60-80 trips a day for two months. Every one of those trips is a chance to scuff your hardwood, ding your baseboard, or scratch the stair stringer.
What gets protected:
- Hardwood and engineered floors: Ram Board taped at seams, not breathable plastic. Plastic traps moisture and can mark hardwood in a week.
- Tile and porcelain floors: Masonite or 1/8-inch ply, because Ram Board alone shows wheel marks from a tool cart.
- Stairs: carpeted runners or Ram Board with anti-slip tape, plus newel-post wraps with cardboard and stretch wrap.
- Baseboards on the route: cardboard wrap, especially at corners.
- Door casings: foam corner protectors, sold in packs of 50 at any drywall supply.
The crews that protect well are the crews that take pride in the finish. Watch how they prep on day one and you will know what your trim work is going to look like in week ten.
3. Utilities Mapping (One Week Out)
Walk your home with the contractor and confirm everyone knows where the following live:
- Main water shutoff. Usually beside the meter in the basement. Test it. On older Ottawa homes the valve can seize and you find out at the worst possible moment.
- Individual fixture shutoffs. Under every sink, behind every toilet. Test those too.
- Main electrical panel. Label every breaker before demo. The crew should not be guessing which one kills the kitchen.
- Gas shutoff. At the meter outside, plus the appliance shutoff at the range and water heater.
- HVAC zone valves. If you have a forced-air system with multiple zones.
If something is buried, mislabeled, or seized, fix it before demo. You do not want a plumber chasing a leak through a finished basement at 4 PM on a Friday.
4. HVAC Return Shutoff (Day-Before)
Single most overlooked prep step: turn off the HVAC return in the work zone and tape the cold-air return grille closed. Cover the supply too if it is going to stay open during demo.
If the furnace runs during demo with an open return in the work zone, the system pulls dust through every duct in the house and deposits it in every other room. Two days of that and you are paying for a full duct cleaning before the project is even framed.
Replace the furnace filter before the project starts and again the week after substantial completion. A MERV 11 minimum is fine. Do not run a HEPA filter in a forced-air system unless it was sized for one, you can starve the blower.
Pro tip
uto.fb7a52e3">Pro tipBuy two extra furnace filters before the project starts. One for mid-project (if you live with the system running on a partial reno), one for the day after final cleanup. They are a few dollars each at any Home Hardware. Cheaper than a duct cleaning.
5. The Pet and Kid Plan (Three Days Out)
Dogs do not understand contractors. The crew arrives, the dog loses its mind for a week, and then it is exhausted and depressed for the rest of the project. Same on a smaller scale with cats and kids under five.
Real options for an Ottawa renovation:
- Dogs: dog daycare 2-3 days a week (Findlay Creek, Barrhaven, and Westboro all have full-time daycares). Crate-and-rotate the rest of the week with the crew briefed on entry routes.
- Cats: seal one bedroom on the opposite side of the house with food, water, litter, and a Feliway diffuser. Door stays closed unless you are checking on them.
- Kids under 5: daycare or grandparents 2-3 days during demo and again during anything loud (tile cutting, hardwood sanding). Bring them home for the quiet drywall and paint phases.
- Older kids: set work-zone rules they understand. The plastic curtain is not a fort. Boots come off when the crew leaves. They tell you, not the contractor, if something feels unsafe.
6. Alternate Cooking and Laundry Plan (One Week Out)
If your kitchen is the project, you need a plan for breakfast, lunch, and dinner for 6-9 weeks. If your laundry is in the project zone, you need a plan for clothes too.
What works for Ottawa families:
- Temp kitchen: dining room or basement rec-room corner with a folding table, microwave, kettle, toaster oven, mini-fridge, and a single induction burner. Most of these you can borrow or already own.
- Dishes: a 12-can plastic tote with the bare minimum (4 plates, 4 bowls, 4 glasses, 4 sets of cutlery, 2 pots, 1 pan).
- Dishwashing: the bathtub if you must, but plan a kettle of hot water and a dish drainer over a tote.
- Laundry: if your washer/dryer is in the work zone, expect a 4-6 week gap. Use a friend, parent, or laundromat. Stittsville and Kanata both have decent options on the major arteries.
- Takeout budget: set aside a realistic weekly amount per person for takeout fatigue insurance. Do not pretend you will cook a roast on a hot plate.
7. Valuables and Sentimental Items (Three Days Out)
Anything irreplaceable comes off the work-zone walls and out of cabinets in the work zone, and goes into a sealed bin in a room you can lock or close. Not because crews steal (mine do not, and yours should not), but because dust, vibration, and the occasional bumped ladder do not care about value.
Specifically:
- Art on shared walls (the wall behind the kitchen, even if the art is in the dining room) comes down. Vibration travels.
- China cabinet contents into bins, even if the cabinet itself stays. A sledgehammer on the other side of the wall will rattle stemware off the shelf.
- Important documents, jewellery, passports, hard drives into a locked closet on the opposite side of the house.
- Wine in a wine fridge: leave it. Wine in a kitchen cabinet next to the demo zone: relocate.
One more thing: photograph every wall, ceiling, and finish in the rooms next to the work zone before demo starts. If something cracks, scuffs, or chips during the project, the photo settles the conversation in 30 seconds.
Pro tip
Walk your house with the lead carpenter the day before demo. Open every cabinet. Point at every framed photo. Identify the one or two things that must not get touched under any circumstance. A 15-minute walk-through saves a 15-minute argument later.
The Short Version
Two weeks of prep saves eight weeks of pain. Containment, route protection, utilities mapping, HVAC shutoff, pet plan, kid plan, kitchen and laundry plan, valuables relocated, photos taken. Nine items. None of them cost much. All of them pay back ten times over.
The Ottawa homeowners who get this right are the ones who treat the prep week like part of the project, not a chore before it. They show up to demo day calm. The ones who skip it spend the first month of the renovation in panic mode.
Our crews walk every client through this list at contract signing, and we do a final prep walkthrough the day before demo starts. If you want to see how a real Ottawa home renovation kicks off the right way, that is part of how we work.