Sunroom addition before and after in Ottawa by Dream Touch Renovations
Ottawa Sunrooms · Three-Season · Four-Season · Screened Porches · Solariums

Ottawa sunroom builder.
Three seasons. Four seasons. Every season.

Dream Touch Renovations designs and builds custom three-season rooms, four-season sunrooms, screened porches, and solariums for homeowners in Kanata, Nepean, Orleans, and across Ottawa. Every project comes with a fixed-price contract, full insurance, a 1-year workmanship warranty, and a free 48-hour site assessment.

Call 613-862-4555
4 types
Three-season to four-season
3–8 wks
Typical build timeline
4 seasons
Ottawa-rated construction
48hrs
Free site assessment
Free site assessment
48-hour turnaround.
Heated to −25°C
Four-season ready.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.
Ottawa's sunroom specialists since 2004

Why Ottawa homeowners choose Dream Touch for custom sunroom builds

Who builds sunrooms in Ottawa? Dream Touch Renovations does. We design, permit and build three-season and four-season sunrooms, screened porches and solariums across Ottawa, on a fixed written proposal after a free 48-hour site assessment.

We are BCIN-certified for permit design, and every sunroom we build carries a 1-year workmanship warranty. Call 613-862-4555 to start with your yard.

Sunrooms are one part of what we build as an Ottawa renovation contractor. If the new room also needs a wider opening or work in the kitchen beside it, that goes into the same plan.

Since 2004, Ottawa families have relied on Dream Touch Renovations to build their sunrooms, with over 500 residential projects completed across Barrhaven, Kanata, Orleans, Westboro, Nepean, Manotick, and every neighbourhood in between. As a Licensed Ontario General Contractor, fully insured, we work exclusively on fixed-price contracts signed before permits are pulled: no change-order surprises, no hidden charges.

If you want a sunroom contractor that does everything in-house, you have one company to hold to the price.

Four kinds of sunroom we build in Ottawa

We build four core categories of Ottawa sunroom. The three-season sunroom uses single- or double-pane glass, minimal insulation, usable roughly May through October. The four-season sunroom uses triple-pane low-E glass, R-24+ walls, integrated heating, permitted as Ontario Building Code-compliant living space and usable year-round, including −25°C January mornings. The screened porch uses no glass, metal or fibreglass mesh, roofed and framed for four-month summer use. The custom solarium or conservatory includes full glass sunrooms with glass roofs, specialty engineering, and heritage-matched detailing for older Ottawa homes.

The most important decision

Three-season or four-season sunroom: which is right for your Ottawa home?

Choosing between a three-season and a four-season sunroom sets most of your quote: glass specification, wall and ceiling insulation, heating, foundation type and long-term value. A three-season sunroom suits summer use; a four-season sunroom is usable all year.

Three-Season Sunroom
Most budget-friendly
Usable May – October · 5–6 months
Construction
  • Single-pane or double-pane glass
  • Uninsulated or minimally-insulated walls
  • No heating/cooling system
  • Deck pier or slab foundation
  • Screened windows often available
Best for
  • Morning coffee in summer
  • Protected outdoor dining
  • Screened-in summer relaxation
  • Budget-conscious build
Limitations
  • Unusable November through April
  • Cannot be insured as year-round space
  • Does not count toward home square footage
Screened Porch
Lightest scope
Usable June – September · 4 months
Construction
  • No glass, fibreglass or metal mesh screens only
  • Post-and-beam frame, optional partial walls
  • Roofed, usually with ceiling fan
  • Deck or slab foundation
Best for
  • Evening gatherings free of mosquitoes
  • Covered outdoor dining
  • Very budget-friendly alternative
Limitations
  • Zero climate control
  • Unusable outside summer
Every Ottawa sunroom style

Six styles of Ottawa sunrooms we build.

Style decides the look, the scope and how the room joins your house. Dream Touch builds all six common Ottawa sunroom styles, including glass solariums, custom cathedral designs, screened summer porches, and traditional conservatories for heritage properties.

Gable Sunroom Ottawa

A peaked-roof sunroom that matches the rooflines of Ottawa's suburban homes. The pitched roof sheds Ottawa's heavy winter snow and allows for vaulted interior ceilings with clerestory windows.

Mid-range scope Best for: Suburban homes in Barrhaven, Kanata, Orleans

Studio Sunroom Ottawa

A single-slope shed-roof sunroom, typically used on modern homes or as a rear addition to mid-century bungalows. It attaches neatly under existing roof lines.

Streamlined scope Best for: Modern and mid-century Ottawa homes

Cathedral Sunroom Ottawa

A high-ceiling sunroom with exposed beams, often with transom windows at the peak. It gets the most light on south-facing Ottawa backyards.

Elevated scope Best for: Homes with backyard views, tree canopy

Solarium Ottawa

Full glass roof and walls. It needs specialty structural engineering, laminated safety glass and careful snow-load calculation, and it lets in more light than any other Ottawa sunroom option.

Premium scope Best for: Gardening enthusiasts, high-end builds

Conservatory Ottawa

A formal, traditional glass-house style, often with decorative ridge cresting and finials. It suits older Ottawa homes in the Glebe, Rockcliffe, and Centretown.

Premium scope Best for: Heritage Ottawa homes, traditional aesthetic

Screened Porch Ottawa

A covered, screened-in porch with no glass and no climate control that keeps the bugs out. It is the most affordable sunroom-adjacent option and one of Ottawa's most popular summer upgrades.

Lightest scope Best for: Summer-use outdoor dining, budget builds
Built for Ottawa's climate

What makes a Dream Touch sunroom different in Ottawa.

Sunroom kit manufacturers and out-of-province builders routinely miss the engineering Ottawa's climate needs. We build for the coldest January mornings and the most humid July afternoons.

Dream Touch's heated sunroom specification is our four-season build standard.

Every heated sunroom we build uses triple-pane low-E glass with argon fill (U-value ≤ 1.3), R-24 wall insulation minimum with continuous exterior rigid foam to eliminate thermal bridging, R-40 ceiling insulation, properly detailed air and vapour barriers to prevent winter condensation inside the wall assembly, and either an integrated HRV or HVAC tie-in to manage humidity year-round.

All four-season sunrooms are engineered, stamped, and permitted as Ontario Building Code-compliant living space, not as "accessory structures."

Every Dream Touch sunroom is backed by a 1-year workmanship warranty and up to 25-year manufacturer warranties on glass and mechanicals. For projects that qualify as new living space additions, Tarion-equivalent structural coverage applies.

Sunroom design concepts

Concepts for Ottawa neighbourhoods.

Illustrative concepts based on typical Ottawa sunroom projects, each drawn for the kind of lot and light it would sit on. These are architectural illustrations, not photographs of specific builds.

View Full Portfolio →
Gable four-season sunroom Ottawa Barrhaven winter evening
Barrhaven

Gable Four-Season Sunroom

  • Full four-season insulation
  • Triple-pane low-E glass
  • Radiant in-floor heating
  • Adds 220 sq ft to home value
Studio three-season sunroom Ottawa Kanata summer golden hour
Kanata

Studio Three-Season Sunroom

  • Three-season budget-friendly
  • Oversized sliding doors
  • Cedar tongue-and-groove ceiling
  • Maintenance-free aluminum frame
Cathedral solarium sunroom Ottawa Glebe dusk heritage
The Glebe

Cathedral Solarium

  • Cathedral ceiling with clerestory glass
  • South-facing light optimization
  • Heritage-matched exterior siding
  • Integrated ceiling fan & ambient lighting
Permits · Zoning · Lot Coverage · Ottawa

Do you need a permit for a sunroom in Ottawa?

Yes. Every sunroom in Ottawa requires a building permit, and its structural, electrical and insulation details fall under the Ontario Building Code. Dream Touch handles every permit, so you never file paperwork.

Check our Ottawa building permit guide for sunroom addition rules and timelines.

Also see our basement renovations in Barrhaven, built with the same design-build care.

Every sunroom project, from a simple screened porch to a full four-season build, requires a City of Ottawa building permit. If the sunroom includes any electrical work (lighting, outlets, electric heating, fans), a separate Electrical Safety Authority (ESA) inspection is mandatory. Integrated heating or cooling systems (mini-split, baseboard, radiant in-floor, HRV) trigger HVAC permits. Dream Touch files the permits, schedules the inspections and manages the sign-offs.

Ottawa zoning considerations for sunrooms start with lot coverage. Sunrooms count toward your total built lot coverage, so your existing percentage (versus your zone's maximum, typically 35%) must allow for the addition. Setback requirements apply: typically 1.2 m from the side lot line, 7.5 m from the rear, and 6 m from the front, though every Ottawa zone is different.

For some lots, particularly in central areas like the Glebe, Westboro, and Hintonburg, a minor variance from the Committee of Adjustment may be required. Dream Touch checks all of this during the free 48-hour sunroom addition site assessment. For a standalone sunroom or one combined with a larger rear addition, we confirm what your lot allows before you spend a dollar on design.

If you are combining a sunroom with a larger build, we have deep experience integrating sunrooms with home additions, Bill 23 secondary suites, and basement conversions. Explore our Financing page for renovation loan options from our three trusted Ottawa mortgage broker partners.

The Dream Touch sunroom process

From free site assessment to first morning coffee.

Every Dream Touch sunroom project follows the same eight steps, refined over 20 years of Ottawa residential construction, with a fixed price signed before work begins.

  1. 1
    60 minutes · Free

    Free Site Assessment

    Walk your yard, assess orientation (south-facing beats north-facing for solar gain), check servicing, confirm setbacks. No deposit, no obligation.

  2. 2
    48 hours · Free

    Feasibility & Zoning Review

    Pull your lot zoning, verify setbacks and lot coverage, confirm permit path. Identify any minor variance needs early.

  3. 3
    1–3 weeks

    Design Consultation

    Discuss three-season vs. four-season, style (gable, studio, cathedral, solarium, conservatory), glass specification, heating approach, and interior finish. 3D renderings provided.

  4. 4
    1 week

    Fixed-Price Contract

    Itemized, line-by-line scope. You approve the written fixed-price contract before any permits are applied for.

  5. 5
    3–8 weeks

    Permits & Engineering

    Building permit, ESA for electrical, HVAC permits if applicable. Structural engineering stamps for roof snow-load and footings.

  6. 6
    1–2 weeks

    Foundation & Framing

    Frost-depth concrete footings, framed structure with proper air and vapour barrier detailing for Ottawa winter performance.

  7. 7
    2–3 weeks

    Glass, Roofing, Interior Finish

    Triple-pane glass installation (four-season), roofing to match existing home, interior finishing (drywall, trim, flooring, electrical, heating).

  8. 8
    1 week

    Final Inspections & Handover

    ESA inspection, municipal building inspection, HVAC commissioning, final walkthrough, warranty documents delivered.

Before you hire

How to choose a sunroom builder in Ottawa.

Ask every builder, kit sellers included, for these Ottawa figures in writing before you sign. A builder who designs for this climate will have each one ready.

Five questions for any sunroom builder

  • What snow load is the roof designed for? SB-1 sets Ottawa's ground snow load at 2.4 kPa, 2.5 in Kanata, and a sunroom under the eaves also takes the snow that slides off the house.
  • How deep do the footings go? On clay, Table 9.12.2.2 puts them at least 1.2 m below finished grade, and never shallower than the frost reaches.
  • For a four-season room, what U-value is the glass? SB-12 holds a one-storey sunroom addition's walls, windows and doors to U-1.4, or U-1.2 in a house with electric heat.
  • Who applies for the building permit? The City of Ottawa treats a sunroom as an addition, and the drawings go in with the application.
  • What workmanship warranty is in the contract, and for how long? Get it in writing, apart from the manufacturer's terms on the glass.

Are prefab sunroom kits worth it in Ottawa?

A kit can work here if it is rated for Ottawa. Before you buy, ask the seller for the roof's design snow load against the 2.4 kPa figure, the glass U-value if you plan to heat the room, and the footing detail the kit assumes.

A kit room over 10 m² needs the same City permit and inspections as a custom one. If you might heat the room later, compare the kit with a four-season design or a full home addition in Ottawa before you order, because a heated room has to meet SB-12.

The Dream Touch difference

Why Ottawa homeowners hire a local sunroom contractor, not a shipped-in kit.

Custom, not kit

Every Dream Touch sunroom is designed for your specific home and lot. We don't use pre-fabricated panels or "one-size-fits-all" aluminum boxes, and the sunroom is built to match your existing house.

Fixed-price contracts

Every sunroom is priced as a written, fixed-price contract before permits are pulled. We don't use change orders as a profit centre, and there are no surprise charges during the build.

One team, one contract

Design, permits, foundation, structural, glass, electrical, HVAC, and interior finish under one Dream Touch roof, so there is no finger-pointing between subcontractors.

Ottawa clients

Real Ottawa homeowners, in their own words.

"

We had an excellent experience with Dream Touch Renovations building our 4-season sunroom! The quality of the workmanship was outstanding, and we couldn’t be happier with how everything turned out.

MalekGoogle review · 2026-10-26 · 4-season sunroom
"

Dream Touch Renovations transformed our house into a dream home. From design to execution, they exceeded our expectations. The team's dedication and attention to detail was top-tier. Highly recommend.

Samantha ThompsonOttawa homeowner · Whole-home renovation client
"

Dream Touch Renovations is truly exceptional. The team's creativity and commitment to quality made our project a success. The house was always clean and the process was stress-free.

Emma DavisOrleans homeowner · Addition & renovation client
Every corner of Ottawa

Sunroom builder serving Ottawa and the National Capital Region.

Dream Touch has built sunrooms across every Ottawa neighbourhood and surrounding community. We know the zoning, lot patterns and house styles of each area: tight urban lots in the Glebe, large suburban properties in Manotick and Greely, and the Ottawa Valley.

Alta Vista Barrhaven Bells Corners Carp Centretown Dunrobin Findlay Creek The Glebe Gloucester Greely Hintonburg Kanata Manor Park Manotick Nepean New Edinburgh Orleans Ottawa Valley Richmond Riverside South Rockcliffe Stittsville Vanier Westboro

Don't see your neighbourhood? We build across the National Capital Region. Call 613-862-4555.

Common questions

Ottawa sunroom questions, answered.

The questions we hear most often in Ottawa sunroom consultations. If yours isn't here, call us and we'll talk through your property.

Talk to a sunroom specialist

Free 15-minute call. No obligation.

Call 613-862-4555

Sunroom budgets in Ottawa are driven by type and specification: screened porches are the lightest scope, three-season sunrooms add glass and partial insulation, four-season sunrooms (Ottawa's most popular) add triple-pane low-E glass, full insulation, frost-depth footings, and integrated heating, and custom solariums add glass roofs and specialty engineering. Size, foundation, heating approach, and finish level all move the number. Every Dream Touch sunroom is a written, fixed-price contract signed before permits are pulled.

A three-season sunroom uses single or double-pane glass and has minimal insulation, so it's usable in Ottawa roughly from May through October. A four-season sunroom uses triple-pane low-E glass, R-24+ wall insulation, R-40 ceiling insulation, integrated heating, and is built to Ontario Building Code standards. It's usable year-round, including −25°C Ottawa winters, and counts as permanent living space.

Only if it's a four-season sunroom. A properly built four-season sunroom with triple-pane glass, R-24+ walls, integrated heating, and HRV ventilation is comfortably usable in Ottawa at −30°C. Three-season sunrooms and screened porches become unusable from November through April because of the cold and condensation.

Not with a heater alone. A room that is heated and used through the winter falls under the Ontario Building Code's energy standard, Supplementary Standard SB-12, which holds a sunroom addition's walls, windows and doors to a U-value of 1.4 (1.2 in a house with electric space heating) and its roof and skylights to 2.6. Converting means checking the glass, the insulation and the foundation against the Code, and the glass is the part most often replaced. If you expect to use the room in winter, design it as four-season from the start.

Yes, every sunroom in Ottawa requires a building permit. Electrical work requires ESA inspection, and integrated heating or cooling systems require HVAC permits. Sunrooms also count as part of lot coverage, so zoning compliance is verified. Dream Touch manages every permit end-to-end.

Active construction runs 3–8 weeks depending on type. Total project timeline from first consultation to handover is typically 10–18 weeks, including 3–8 weeks for permits. Dream Touch holds a 98% on-time rate with written delivery dates in every contract.

Four-season sunrooms add appraised home value because they qualify as permanent living space, often recovering most of their build cost at resale. Three-season sunrooms and screened porches add less appraised value because they don't count as year-round living area. You build one mainly for how you will use it.

Sometimes. For a three-season sunroom, an existing deck may work as the foundation if engineering confirms it can support the additional load (roof snow, wall weight, furnishings). For a four-season sunroom, a new frost-depth concrete footing is almost always required. Decks cannot support year-round insulated construction. Dream Touch assesses this during the site assessment.

A solarium has a glass roof as well as glass walls, so it lets in more light than any other sunroom option. The other styles we build have a roof like the house: a peaked gable roof, a single-slope studio roof, or a high cathedral ceiling with exposed beams. A glass roof needs specialty structural engineering, laminated safety glass and careful snow-load calculation for Ottawa winters. A conservatory is the formal, traditional glass-house version, often with decorative ridge cresting and finials.

Yes. Our portfolio lists a four-season sunroom addition in Stittsville, 2024, with integrated heating and panoramic views. The concept drawings on this page are illustrations, not photographs of finished jobs. Malek's Google review of the 4-season sunroom we built is quoted above, and more are on our reviews page.

Most Ottawa homeowners finance sunrooms through HELOC (Home Equity Line of Credit), home improvement loan, or refinance. Dream Touch partners with three trusted Ottawa mortgage brokers who specialize in renovation financing. See our Financing page for details.
Your Ottawa sunroom starts here

Free sunroom site assessment.
48-hour turnaround.
Zero obligation.

Tell us your address and what you're picturing. We walk your yard, measure the space, check orientation and setbacks, and email a written feasibility report with a scope breakdown within two business days. No deposit, no obligation.

100s
Projects
4.7★
Google
Est. 2004
20+ Years
A+
BBB
✓
Licensed & Insured