← All articles
Renovation Mistakes

5 Trendy Finishes That
Already Look Dated

Dec 9, 2025 · 6 min read · By Dream Touch Renovations Ottawa

5 Trendy Finishes That Already Look Dated
← All articles

I have built kitchens and baths in Ottawa for 20 years. Trends come every five. The 1990s gave us oak everywhere. The 2000s gave us granite. The 2010s gave us subway tile. The early 2020s gave us all of the things below.

If you finish your project in 2026 with finishes that peaked in 2019, the kitchen will look two cycles old by the time the warranty runs out. Here are five we are pulling out of houses right now, and what we put in instead.

1. White subway tile with grey grout

It was the safe pick from 2014 to 2021. Every kitchen back-splash got it. Every shower wall got it. The grey grout was supposed to read clean and modern.

What it actually reads as in 2026 is a flip-house aesthetic. The contrast between the bright white tile and the dark grout creates a grid pattern that the eye locks onto. In a small kitchen it looks busy. In a shower it looks like a public locker room.

The grey grout has also taught us something we did not know in 2015: it stains in odd ways. Hard water leaves white residue. Soap film leaves yellow residue. Two years in, the grout looks blotchy.

What works long term: a slightly off-white or warm white tile in a 4 by 12 or 4 by 16 plank, set in a quiet horizontal stack with grout matched to the tile colour. Or a hand-made zellige with the imperfections that make it read as a real material instead of a flat factory product. Both age into the room. Neither shouts a year on the calendar.

2. All-white kitchens with cold-temperature LED lighting

The all-white kitchen made sense in a smaller home where you wanted the room to read bigger. The mistake was the lighting that almost always came with it. 5000K daylight LEDs above 4000K under-cabinet strips made the whole room read like a hospital pharmacy.

The white kitchens we built six years ago are now the ones we are repainting. The owners do not hate white. They hate cold white in cold light. The fix is not to gut the cabinets. The fix is two things: paint the perimeter or the island a warmer mid-tone, and swap every bulb in the room to 2700K.

The cheapest kitchen refresh

Re-lamping a 12-can kitchen with 2700K bulbs is inexpensive. Repainting the island a Benjamin Moore Kingsport Grey or Newburyport Blue adds a little more. For a modest budget you can take an all-white kitchen from 2019 to 2026 without touching cabinets, counter, or floor. Both are line items we are happy to quote on their own.

3. Mass-produced shaker doors

Shaker is not the problem. Shaker has been around since the 1820s. The problem is what mass production did to shaker between 2015 and 2024.

The thin MDF rails. The 2-inch frame width that looks the same on a 12-inch door and a 36-inch door, so the proportions read off. The painted finish that chips on every edge by year three. The 32 millimetre system gaps that show daylight at every corner.

We pull these doors off cabinets every month and replace them with something that looks like a piece of cabinetry, not a flat-pack approximation of one.

What works long term: a shaker with frame widths scaled to the door size. Wider frames on big doors. A 5-piece door instead of a flat-panel insert glued to a router-cut frame. Real wood paint grade or stained white oak with a quarter-sawn grain. The door costs 30 to 50 percent more. It also lasts 30 years instead of 8.

4. Brass everywhere

Brass came back hard in 2018. Faucets, cabinet pulls, light fixtures, towel bars, mirror frames, shower trim. Designers put brass on every metal surface in the room. By 2022 the rooms read as costume jewellery.

The honest move with any warm metal is to use it as an accent, not as a uniform. Pick one or two surfaces in a room to carry the warm metal. Faucet and cabinet pulls. Or pendant lights and switch plates.

Let everything else be a quieter finish: soft black, brushed nickel, or a satin chrome. The brass reads as intentional. The room does not look like it is wearing too much jewellery.

Also worth knowing: there are at least eight different brass tones being sold right now as "brass." Polished, brushed, satin, antique, aged, living, unlacquered, champagne. They do not match each other. If you buy three brass items from three different brands, you have three different metals in the same room. We spec one finish family per room and source from one brand to avoid the casino-lobby look.

The first sign of a dated reno is when every metal surface in the room is the same colour as every other metal surface. Real rooms have hierarchy.

5. Light pink quartz

This one had a short cycle. Light pink and salmon-toned quartz peaked between 2020 and 2022. It was sold as a warmer alternative to the cold white quartz dominating the market. It was supposed to read soft, timeless, almost stone-like.

It does not. Pink quartz reads pink. Three years in, the homeowner looks at the counter and sees pink. Then they look at the floor, which is a cool grey because that was the trend two years before, and they realize the kitchen has no temperature plan. Pink counter, grey floor, white cabinets, brass faucet. Four temperatures in one room.

What works long term in 2026 and probably 2030: honed quartz in a soft warm white with a subtle vein, or a real natural stone like soapstone or quartzite that has actual depth. The veining comes from the rock itself, not from a printed pattern that repeats every 10 feet. The colour is muted enough to read as a background surface, which is what a counter is supposed to do.

What ages well in 2026

The finishes that age well in any decade share one thing: they are quiet. Kitchens and baths are rooms you live in, not rooms you take photos of. The finish should support the cooking, the kids, the morning routine. It should not be the loudest thing in the room.

Here is the short list we recommend on most projects this year:

None of these are revolutionary. They are also none of the trends listed above. That is the point. A kitchen built on quiet finishes in 2018 still looks good today. A kitchen built on the trend of 2018 looks dated.

The five-year test

Before you sign off on any finish, run it through the five-year test. Pick a finish trend from 2020. Picture it in your kitchen today. Does it still look right, or does it look like 2020? Now pick a finish from 1995 that has held up. White oak floors, soapstone counter, painted wood cabinets in a soft colour. Did the 1995 example date? It did not.

The finishes that hold up are the ones that were not chasing a moment. They were chasing the room.

If you want help picking finishes that will not date by the time the warranty runs out, our in-house design team works through every finish on every project. Call 613-862-4555, or visit our Ottawa kitchen renovation page to see how the design phase fits into a fixed-price quote.

Trends are fun to look at on Instagram. They are expensive to live with.

Frequently asked questions

Why does white subway tile with grey grout look dated now?

White subway tile with grey grout reads as a flip-house finish in 2026. The contrast between bright tile and dark grout makes a grid the eye locks onto, so small kitchens look busy and showers look like a locker room.

Grey grout also stains unevenly: hard water leaves white residue and soap film leaves yellow. A warm white 4 by 12 or 4 by 16 plank with colour-matched grout, or handmade zellige, ages far better.

How can I update an all-white kitchen without replacing the cabinets?

An all-white kitchen can be brought up to date with two changes and no new cabinets, counters or floors. Swap every bulb in the room to 2700K, and paint the perimeter or the island a warmer mid-tone, such as Benjamin Moore Kingsport Grey or Newburyport Blue.

The real problem in most 2019 white kitchens is cold 5000K ceiling light over 4000K under-cabinet strips, which makes the room feel like a hospital pharmacy.

What makes a shaker cabinet door last instead of looking cheap?

A long-lasting shaker door has frame widths scaled to the door size, with wider frames on big doors, and is built as a true 5-piece door rather than a flat panel glued into a router-cut frame.

Real paint-grade wood or stained quarter-sawn white oak holds up. Mass-produced versions with thin MDF rails and a fixed 2-inch frame chip at the edges by year three and last about 8 years, against roughly 30.

How much brass should I use in a kitchen or bathroom?

Brass works best as an accent on one or two surfaces per room, such as the faucet and cabinet pulls, or pendant lights and switch plates. Everything else can take a quieter finish like soft black, brushed nickel or satin chrome.

Brands sell at least eight different tones as brass, from polished to champagne, and they do not match each other, so pick one finish family per room and buy from one brand.

Which kitchen finishes age well instead of dating quickly?

Quiet finishes age well: wide-plank white oak or maple floors in a hardwax oil, cabinets painted on real wood in soft warm whites, quiet greens or muted blues, honed counters with low pattern repetition, one plumbing finish family per room, larger-format tile, and 2700K lighting on dimmers with separate task and ambient circuits.

A useful check is the five-year test: picture a 2020 trend in the kitchen today and see whether it has dated.

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →