Bathroom renovation before and after in Ottawa by Dream Touch Renovations
Ottawa Bathroom Renovation · Ensuite · Primary · Powder Room · Accessible

Bathroom renovation in Ottawa.

Built to last decades, not trends.

One Ottawa team designs, waterproofs and installs ensuite and primary bathroom renovations, small bathroom makeovers, powder rooms and fully accessible builds. You get free in-home design, a fixed-price contract and a 1-year workmanship warranty.

Call 613-862-4555

★ 4.7 from 42 Google reviews

500+
Ottawa bathrooms delivered
Free
In-home design consultation
5+25 yrs
Workmanship + manufacturer warranty
98%
On-time completion rate
Free in-home design
No deposit required.
15% off all tile
Kohler/TOTO/Grohe partners.
1-year DTR warranty
Plus up to 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.

Bathroom renovations in Ottawa

Dream Touch renovates ensuites, main bathrooms, powder rooms, and accessible bathrooms across Ottawa. Every project starts with a free in-home design visit and an itemized, fixed-price written quote.

Ottawa's bathroom renovation specialists since 2004

Why Ottawa homeowners choose Dream Touch for bathroom renovations

Who does bathroom renovations in Ottawa? Dream Touch Renovations does. We are an Ottawa design-build company, in business since 2004, and one team designs, waterproofs and installs ensuites, main bathrooms, powder rooms and accessible bathrooms, with a Schluter-Kerdi membrane under the tile of every shower.

“The crew was pleasant, polite, helpful, patient with our changing ideas, and clean.” Saralyn Hodgkin, Google review, 2018 (master bathroom). We are BCIN-certified, so when plumbing or walls move we draw the permit drawings ourselves. Call 613-862-4555 to book a design visit.

To spot a bathroom renovation company that won’t cut corners, ask to see their BCIN certification, liability insurance certificate, and written warranty terms. A company that can’t produce all three isn’t built to protect your home.

A bathroom is often the first room of a bigger home renovation in Ottawa, and when the plan grows to the kitchen, the basement or an addition, the same design-build team carries it on.

Since 2004, Ottawa families have trusted Dream Touch Renovations with their bathrooms, and we have completed more than 500 bathroom projects across Barrhaven, Kanata, Orleans, Westboro, Nepean, Manotick, the Glebe, Hintonburg, and every neighbourhood in between.

As a Licensed Ontario General Contractor, fully insured, we are the bathroom renovation company homeowners choose when they want the build done once, properly, with written fixed-price contracts and a 1-year workmanship warranty. Our in-house team of plumbers, electricians, tile specialists, and cabinet makers completes every bathroom renovation under one roof, with no subcontractor chains and no finger-pointing.

Before and after

From dated bathroom to finished ensuite.

Drag the handle to compare before and after on this Ottawa bathroom renovation.

Ottawa bathroom renovation after, completed ensuite by Dream Touch Renovations Before After
Five bathrooms. Five searchers. One Ottawa team.

What kind of bathroom are you renovating?

Every bathroom renovation belongs to one of five project types. Each has different scope, budget, timeline, and design priorities.

Ensuite Renovation Ottawa

Luxurious primary bathroom connected to the main bedroom. Walk-in showers, freestanding tubs, double vanities, heated floors, spa lighting. The highest-ROI bathroom investment in Ottawa.

Full custom scope Timeline: 4–6 wks Built for: Primary bedroom suites, long-term stays

Main Bathroom Renovation Ottawa

The shared family bathroom, typically 40–70 sq ft in Ottawa suburban homes. Tub/shower combination, single vanity, practical storage, durable finishes for daily multi-user traffic.

Mid-range scope Timeline: 2–4 wks Built for: Shared family use, young families, rentals

Powder Room Ottawa

Main-floor half-bath with toilet and vanity. It has the highest visual impact per square foot in your home, because it's the room guests use.

Compact scope Timeline: 2 wks Built for: Main-floor guests, quick wins

Small Bathroom Renovation Ottawa

Complete gut and rebuild of a tight 40–55 sq ft bathroom. Careful layout planning, space-saving fixtures, light-reflecting materials. This is Ottawa's most common bathroom renovation, and the one where good design matters most.

Full gut scope Timeline: 2–3 wks Built for: 1950s–1990s homes, condos, rentals

Accessible Bathroom Ottawa

Barrier-free bathrooms for aging-in-place or mobility needs. Zero-threshold walk-in showers, grab bars, curbless transitions, roll-under vanities, slip-resistant flooring. Designed to look like the rest of the house.

Barrier-free scope Timeline: 3–5 wks Built for: Aging-in-place, mobility, forward planning
Recent Ottawa bathrooms

Real Ottawa homes. Real bathroom renovations.

View Full Portfolio →
Bathroom renovations Ottawa: Modern ensuite bathroom Ottawa Hillcrest walk-in shower
Hillcrest · Ottawa · 2024
Hillcrest · Ottawa · 2024

Spa-Inspired Ensuite

  • Black-framed grid shower glass
  • Espresso shaker vanity
  • White quartz-look countertop
Contemporary family bathroom Ottawa Albion
Albion · Ottawa · 2024
Albion · Ottawa · 2024

Modern Family Bathroom

  • Walk-in glass shower
  • Wood-look tile shower wall
  • Sliding glass shower door
Custom walk-in shower Ottawa Dunrobin glass enclosure
Dunrobin · Ottawa · 2023
Dunrobin · Ottawa · 2023

Custom Walk-In Shower

  • Curbless frameless-glass walk-in shower
  • Floor-to-ceiling large-format stone-look tile
  • Floating double vanity, taupe shaker
Primary ensuite bathroom Ottawa Barrhaven — freestanding tub and glass walk-in shower
Barrhaven · Ottawa · 2024
Barrhaven · Ottawa · 2024

Mohamad's Ensuite

  • Freestanding soaker tub
  • Frameless glass walk-in shower
  • Floating wood double vanity
Secondary bathroom Ottawa Carlsbad
Carlsbad Springs · 2024
Carlsbad Springs · 2024

Carlsbad Secondary Bathroom

  • Frameless glass walk-in shower
  • Floor-to-ceiling marble wall tile
  • Grey shaker double vanity
Accessible walk-in shower Ottawa Orleans barrier-free
Orleans · Ottawa · 2024
Orleans · Ottawa · 2024

Accessible Walk-In Shower

  • Barrier-free curbless entry + grab bars
  • Frameless glass walk-in shower
  • Fold-down bench + roll-under vanity
Boutique powder room Ottawa Manotick custom vanity
Manotick · Ottawa · 2023
Manotick · Ottawa · 2023

Boutique Powder Room

  • Dual rain-head walk-in shower
  • Freestanding oval soaker tub
  • Floor-to-ceiling marble-look tile
Walk-in shower renovation Ottawa Orleans family
Orleans · Ottawa · 2024
Orleans · Ottawa · 2024

Orleans Family Shower

  • Frameless glass walk-in shower
  • Floor-to-ceiling marble-look tile
  • Curbless zero-threshold entry
Custom home sauna Ottawa spa retreat
Ottawa · 2023
Ottawa · 2023

Home Sauna Build

  • Indoor infrared sauna cabin
  • Carbon infrared heater panels
  • Frameless tinted glass door

Project story: an accessible primary bathroom in Orléans, rebuilt in 2024 so a man home after a stroke could bathe on his own again: the brief, every feature, the permits and the timeline.

The thing most Ottawa bathroom contractors don't tell you

Your bathroom will fail in 3–5 years if waterproofing is done wrong.

The single biggest reason Ottawa homeowners call us to redo a bathroom renovation is that the original contractor skipped proper waterproofing. Proper waterproofing costs slightly more upfront and saves thousands long-term; this section shows what it involves.

Without proper waterproofing, water passes through grout (which is porous by nature), saturates the cementitious backer board, rots the subfloor below, and breeds mould inside the wall cavity. Homeowners see cracked grout at year 2, soft flooring at year 3, and discover black mould behind the tile at year 5 when they pull the wall.

Under Dream Touch's waterproofing specification, every wet wall and shower receives Schluter-Kerdi sheet membrane (or equivalent bonded waterproofing) installed directly under the tile. Corners and seams are sealed with Schluter-Kerdi-Band. Every drain is Schluter-Kerdi-Drain compatible with integrated waterproof flashing.

If a bathroom renovation quote is much cheaper than ours, ask what waterproofing system they're using. If they say "just green board" or "we use a waterproof paint", walk away.

What's included in a Dream Touch Ottawa bathroom

A bathroom renovation's eight trades, in order.

A bathroom renovation is eight trades working in sequence. Skip one and you get problems that won't show up for years. A complete Dream Touch Ottawa bathroom renovation includes all of them.

Demolition & Protection

Full demolition down to studs and subfloor. We protect floors, doorways, and HVAC with dust barriers. Debris hauled same-day.

Plumbing Rough-In

Licensed plumber relocates supply, drains, and venting as needed. Pressure-tested before any walls go back up. All work permitted.

Electrical Upgrades

Vanity outlets to modern GFCI code, bathroom-rated pot lights, integrated fan+light combos, heated floor wiring. ESA permitted and inspected.

Waterproofing System

Schluter-Kerdi membrane on every wet wall, waterproofed drain flashing, tested before tile. The layer most Ottawa contractors skip.

Tile Installation

Large-format porcelain or natural stone, laser-levelled, proper thinset, consistent grout lines. Premium installation by in-house tile specialists.

Vanity, Counter & Fixtures

Custom or premium stock cabinetry, quartz or natural stone counters, undermount sinks, soft-close drawers. From Kohler, Grohe, Delta, TOTO.

Ventilation & HVAC

Ottawa code now requires proper exhaust ventilation, so we install continuous-duty fans sized to your cubic footage to keep moisture out of the wall cavity.

Finishing & Punch List

Paint, trim, accessories, mirrors, door hardware. Final walkthrough, all fixtures tested, your warranty documents delivered.

How to choose a bathroom renovation company in Ottawa

The Government of Ontario advises getting written estimates from at least 3 contractors, and never accepting one over the phone or without a visit to the room. Then compare them on five things you can check in writing.

  • A written contract. Ontario requires any home renovation contract worth more than $50 to be in writing. When the written estimate is part of the contract, the final price cannot be more than 10% over it unless you agree to new work or a new price.
  • The waterproofing, by name. Ask which membrane goes behind the tile, how the seams and corners are sealed and which drain is used. Tile on water-resistant board meets the Ontario Building Code minimum, and grout is porous.
  • Who handles the permit. Moving a fixture or a wall needs a City of Ottawa building permit. Ask who files it and who books the inspections.
  • Who does the electrical. The Electrical Safety Authority says only a Licensed Electrical Contractor, or a homeowner doing their own work, may do electrical work in a home. Ask for the licence number on the estimate.
  • The workmanship warranty. Get it in the contract, separate from the fixture makers' own terms. Ours is 1 year.

Source: Government of Ontario, Your rights when starting home renovations or repairs.

The Dream Touch bathroom process

From free design consultation to first hot shower.

Every Dream Touch bathroom follows the same seven-phase process, refined across 20 Years of Ottawa Projects, with clear timing at every stage.

Step 1
Free In-Home Design
60 min · Free
We visit, measure, discuss priorities, and sketch layout options. No deposit.
Step 2
3D Renderings
1 wk
Detailed design package with fixture spec, tile selection, lighting plan.
Step 3
Fixed-Price Contract
3–5 days
Line-item quote with zero hidden allowances. You approve, we order.
Step 4
Material Ordering
3–6 wks
All tile, fixtures, vanity, hardware delivered to our warehouse first.
Step 5
Demo + Rough-In
3–5 days
Full gut to studs, plumbing and electrical rough-in, subfloor check.
Step 6
Waterproof + Tile
5–10 days
Schluter membrane, pressure-tested, tile installed and grouted.
Step 7
Finish & Handover
3–5 days
Vanity, fixtures, lighting, paint, trim. Walkthrough + warranty.
Trusted Partners

Built with brands we stand behind.

Kohler, Ottawa bathroom fixtures partner
Grohe, Ottawa bathroom fixtures partner
Delta, Ottawa bathroom fixtures partner
American Standard, Ottawa bathroom fixtures partner
TOTO, Ottawa bathroom fixtures partner
Blanco, Ottawa bathroom sinks partner
Moen, Ottawa bathroom fixtures partner
Pfister, Ottawa bathroom fixtures partner
Fleurco, Ottawa bathroom glass partner
Every Ottawa neighbourhood

Bathroom renovation contractor serving Ottawa and the National Capital Region.

Dream Touch has renovated bathrooms across every Ottawa neighbourhood. Older Hintonburg and Glebe homes have different plumbing and ceiling-height challenges than new Kanata and Barrhaven builds, and our team handles both.

A bathroom renovation in Nepean often means new drains in a mid-century house, while a bathroom renovation in Barrhaven is often a new bath in a builder basement. A bathroom renovation in Stittsville starts with whether the house is on municipal sewer or a private septic system. A bathroom renovation in Kanata is more often a new bathroom in a tall basement in Kanata Lakes, Bridlewood or Morgan’s Grove.

Albion Alta Vista Barrhaven Bells Corners Carlsbad Springs Carp Centretown Dunrobin Findlay Creek The Glebe Gloucester Greely Hillcrest Hintonburg Kanata Manor Park Manotick Nepean New Edinburgh Orleans Overbrook Riverside South Rockcliffe Sandy Hill Stittsville Vanier Westboro

Don't see your neighbourhood? We renovate bathrooms across the National Capital Region, including Carleton Place and Embrun. Call 613-862-4555.

Ottawa clients

What our bathroom clients say.

"

Dream Touch Renovations transformed my house into a dream home. From design to execution, they exceeded my expectations. The team's dedication and attention to detail was #1. Highly recommend.

Samantha ThompsonOttawa homeowner · Bathroom + whole-home renovation
"

Moe and the team renovated our master bathroom along with whole-home work. The craftsmanship in the custom cabinetry, tile, and finishes is excellent. The painting is precise with clean lines. I would hire Dream Touch Renovations again.

Saralyn HodgkinWestboro homeowner · Primary ensuite renovation
"

Moe went out of his way to make sure everything was right. He upgraded our sink at no cost to our budget, sent his electrician to move lighting, and did a follow-up to make sure we were completely content with the finished product.

Joan ArseneauOttawa homeowner · Main bathroom renovation
Common questions

Ottawa bathroom renovation questions, answered.

The questions we answer most often during Ottawa bathroom consultations. If yours isn't here, call us.

Talk to a bathroom specialist

Free 15-minute call. No obligation.

Call 613-862-4555

Ottawa bathroom renovation pricing is driven by room size, fixture and finish selection, tile choice, cabinetry, plumbing or electrical relocations, waterproofing, and permits. A powder room costs far less than a full custom primary ensuite. Every Dream Touch bathroom renovation is a written, fixed-price contract with a clear itemized breakdown, full waterproofing, and permits included, so you understand exactly what you're paying for before work begins.

Active construction runs 3–8 weeks depending on scope. Total project timeline from first consultation to handover is typically 10–20 weeks, including material lead times (4–12 weeks for tile and fixtures). Dream Touch doesn't start demolition until every material is delivered, which avoids mid-project delays.

Yes, for most scopes. Plumbing relocations, electrical upgrades, and ventilation changes all require permits. Cosmetic-only renovations (vanity swap, paint, fixture replacement) may not. Dream Touch handles every permit required and flags the minority of projects that don't need one.

No. If the toilet, sink and tub stay where they are, the plumbing is straightforward, and each fixture you move adds scope: moving a toilet means opening the ceiling below. Our plumber meets you at the design stage to confirm what can and can't move before the contract is signed. In a Glebe ensuite we kept the plumbing stack where it was, because moving it meant opening the kitchen ceiling below, and designed the room around it.

Yes. In a Glebe heritage ensuite we took the 60-inch tub out entirely and built a walk-in shower along the full long wall, 36 inches deep, with a linear drain at the threshold. A conversion like that moves the drain and needs a sloped subfloor, and the City of Ottawa treats a plumbing alteration as permit work. Every shower we build gets a Schluter-Kerdi membrane under the tile, curbless ones included.

Yes. Our small bathroom scope is built for condos as well as 1950s to 1990s houses and rentals: a complete gut and rebuild of a tight bathroom, with careful layout planning and space-saving fixtures. Condo or HOA approval may still be needed separately from any City of Ottawa permit, so check your building's rules before a start date is set.

For most homeowners, yes, especially if it's not your only bathroom. We set up dust barriers and schedule noisy work during business hours. If it's your only bathroom, the "rough" phase (3–5 days without fixtures) means staying with a friend or in short-term accommodation. We coordinate this timing with you.

Yes. Dream Touch specializes in barrier-free and universal design bathrooms, including zero-threshold walk-in showers, grab bars, roll-under vanities, slip-resistant flooring, all finished in a residential style. Many of our accessible bathrooms are also designed for forward-planning families who want the renovation to still work in 20 years.

Yes. It is one of the most efficient ways to add bathroom count and property value. See our Basement Renovations page for full basement + bathroom combination projects.

Most Ottawa homeowners finance bathrooms through HELOC (Home Equity Line of Credit), home improvement loan, or refinance. For larger primary ensuite renovations, construction financing is also available. See our Financing page for our three trusted Ottawa mortgage partners.

Yes. Every Dream Touch bathroom carries a 1-year workmanship warranty in your contract, starting at completion: if tile comes loose or a plumbing connection leaks because of how we installed it, we fix it at no charge. Faucets, fixtures and other products carry their own manufacturer warranties, and we hand you every warranty document at the final walkthrough. The workmanship warranty transfers to a new owner for the rest of the year if you sell.

Ask what goes under the tile: the Ontario Building Code accepts waterproof tile as the finish, but grout is porous, which is why every Dream Touch shower gets a Schluter-Kerdi membrane. Size the exhaust fan above the 50 cfm code minimum, because an Ottawa bathroom has to clear shower steam through winter. Moving plumbing or walls needs a City of Ottawa building permit, and electrical work needs an ESA notification. In an older house, ask what may be behind the wall before demolition starts: knob-and-tube wiring, old supply lines or a lead water service.

In the bathrooms we build, large-format porcelain or natural stone tile, heated in our mid-range and premium bathrooms. Accessible bathrooms get slip-resistant flooring. Pick the stone finish with care: polished stone scratches and honed marble absorbs soap, so we run a tile consultation with an onsite lighting test. We also check the subfloor with a moisture meter at the design stage.

In our Premium scope, a high-end bathroom is a primary ensuite of 90 to 150 sq ft with a custom walk-in shower behind frameless glass, a double vanity with custom storage, and natural stone or premium porcelain throughout. It adds heated floors, a towel warmer, layered dimmable lighting, a rainshower, handheld and body jets, and custom tile niches and benches. It carries a 10-year extended warranty.
Your Ottawa bathroom starts here

Free in-home design consultation.
No deposit.
Zero obligation.

Tell us about your bathroom and what you're hoping to achieve. We visit, measure, discuss fixture spec and finish options, and deliver a written quote with 3D renderings, before you commit to anything, with no sales pressure.

100s
Bathrooms
4.7★
Google
Est. 2004
20+ Years
A+
BBB
✓
Licensed & Insured