← All How-To articles
← All How-To articles
Advanced DIY · Carpentry · Built-Ins

How to Build a Mudroom Bench

Cabinets seem like the hardest job in a kitchen. They're not. The hardest job is what comes before: getting the room level, plumb, and properly marked.

Advanced 1-2 days

A mudroom bench is the central piece of an entryway storage system: a seating bench at typical bench height (16-18 inches), often with cubbies underneath for shoes and storage compartments above for hats and bags. Done well, it organizes the chaos of family entry/exit. Done poorly, it's just a board on legs.

This guide covers a typical built-in mudroom bench: 14-16 inches deep, 16-18 inches tall, sized to fit a typical mudroom alcove or wall. Add cubbies, hooks, and storage above for the full system.

Before you start

Three things to settle:

1. Plan storage zones. Bench top: seating + storage compartments below. Wall above bench: coat hooks at typical 60-66 inch height. Above that: shelves or upper cabinets for hats/seasonal items. Each zone has a specific function.

2. Bench seat opens or fixed?. Hinged seat top: storage inside bench (deep storage for boots, sports gear). Fixed top: cubbies underneath at floor level. Choose based on use; hinged seat needs gas-strut supports to hold open.

3. Match style to home. Mudroom bench is a focal piece of entryway. Match style: shaker rails for traditional, slab front for modern, beadboard back for cottage. Use existing trim profiles.

What you'll need

Tools

  • Mitre saw or table saw
  • Drill with bits
  • Pocket-hole jig
  • Brad nailer
  • Tape measure
  • Level
  • Stud finder
  • Sander

Materials

  • 3/4 inch plywood (for bench box)
  • 1×4 hardwood (for face frame and trim)
  • Hardwood for bench top (or thicker plywood with edge banding)
  • Hooks (cast iron or modern style)
  • Hinges (if hinged seat) — heavy-duty
  • Gas struts (if hinged seat)
  • Pocket-hole screws and brad nails
  • Wood glue, finish nails
  • Stain or paint + finish

Bench top: solid wood or laminated plywood

Bench seat takes weight and wear. Solid wood (oak, maple): durable, beautiful. Laminated plywood: cheaper, edge-band the visible plywood edges.

1.5 inch thick top: rigid, supports adult weight.

Step-by-step instructions

Plan dimensions and layout

Measure mudroom space.

Bench: 16-18 inches tall, 14-16 inches deep, length to fit space.

Plan cubbies underneath (3-4 cubbies typical for family of 4).

Plan hook height (60-66 inches) and shelving above.

Build bench frame

3/4 inch plywood: bench bottom, sides, back.

Face frame: 1×4 hardwood across front.

Pocket-hole joinery internal; hidden screws.

Box square; verify with diagonals.

Add cubby dividers

Vertical 3/4 inch plywood pieces inside bench, dividing space into cubbies.

Pocket-screw to bench bottom and back.

Cubby width: 12-15 inches typical.

Anchor bench to wall

Lift bench into position.

Level on floor (shims under back if floor is uneven).

Drive screws through bench back into wall studs.

Solid anchor; bench should not shift.

Install bench top

Cut bench top to dimensions.

If hinged: install with heavy hinges and gas struts (allow open position to stay).

If fixed: brad nail and glue to bench frame.

Edge-band plywood front edge or use solid wood.

Install hooks at correct height

Hooks at 60-66 inches above floor.

Locate studs; mount hooks into studs (hooks bear coat weight and pulling load).

Pre-drill if hardwood backboard.

Space hooks 6-8 inches apart.

Add backboard or beadboard wainscoting

Backboard between bench top and hooks: 1/4 inch beadboard plywood or shiplap planks.

Adds character and protects wall.

Brad nail to wall studs.

Install upper shelves or cabinets (optional)

Above hooks: open shelves or closed cabinets for upper storage.

Sized to fit space.

Match style to bench.

Trim and finish

Crown moulding at top, baseboard at bottom — matching room.

Caulk seams.

Fill nail holes, sand smooth.

Prime, paint OR stain and clear coat.

Add cushions and decor

Bench cushion (optional): adds comfort.

Storage baskets in cubbies.

Coordinated decor for finished look.

Common mistakes that cost you

Frequently asked questions

How wide should each cubby be?

12-15 inches: comfortable for shoes, baskets.

Smaller (9-10 inches): only for narrow items.

Larger (16-18 inches): if storing boots in winter.

What about kids' coats?

Lower hooks (40-48 inches) accessible to kids.

Or: separate kid section with lower hooks.

As kids grow, raise hooks.

Can a mudroom bench fit in a small space?

Compact bench: 30-36 inches wide × 14 inches deep × 16 inches tall.

Single cubby for shoes; two hooks above.

Even tight spaces benefit from organization.

When to call us instead

Mudroom benches and entryway built-ins are signature features. Our team designs and builds custom mudroom systems.

Book a free 60-minute site visit →

Related Ottawa services

If your renovation includes a mudroom upgrade, our team handles custom built-ins. Book a free 60-minute consultation.