Coach house laneway home before and after in Ottawa by Dream Touch Renovations
Ottawa Coach Homes · ADUs · Bill 23 Compliant · Turnkey Design + Build

Ottawa coach house builder.
A second home, on your property.

Turnkey coach homes in Ottawa: one team handles design, permits and construction. Each unit is built to code for Ottawa's climate and ready to rent. Free feasibility review in 48 hours.

Call 613-862-4555
48hrs
Feasibility turnaround
20+ yrs
Ottawa experience
1 team
Design · permit · build
Bill 23
Ottawa compliant
Free design consult
No deposit required.
Permits + drawings
Engineering coordinated with P.Eng partner firms at zero markup.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.

Who builds coach houses in Ottawa?

Dream Touch Renovations builds coach houses in Ottawa. We are a BCIN-certified renovation and design company founded in 2004, serving Ottawa, Nepean, Kanata, Barrhaven, Orleans, Stittsville, Manotick, and Westboro. Every coach house project is backed by liability insurance and a 1-year workmanship warranty. Call (613) 862-4555, Monday–Friday 8–5 or Saturday 9–3.

Why Ottawa is Building Coach Homes

More home without
the move. More income
without the compromise.

A coach home (also called a laneway house, garden suite or accessory dwelling unit) is a self-contained second residence on your existing Ottawa property. You can rent it out, house family in it or work from it. Built right, it pays for itself.

Who builds coach houses in Ottawa? Dream Touch Renovations does. We design, permit and build backyard coach houses across Ottawa under one fixed-price contract. From 2023 to 2025 we built eight of them, from 450 to 750 sq ft, in Manotick, the Glebe, Kanata, Dunrobin, Riverside, Orléans and Kars.

Each one starts with a free written feasibility report on your lot within 48 hours. Our permit drawings are BCIN-certified, every build carries a 1-year workmanship warranty, and we have renovated Ottawa homes since 2004. Call 613-862-4555 to start with your address.

Rental Income from Day One

A coach home earns monthly rent you can put toward your mortgage or your retirement. Long-term tenant demand in Barrhaven, Kanata, Orleans, and Nepean is strong, and your feasibility report includes a neighbourhood rental comparison.

Family Living, Reimagined

A Dream Touch coach home gives aging parents or adult children their own private space, or gives you a separate home office. Your family gets more room without listing your home or leaving the neighbourhood.

8–15% Property Value Lift

Ottawa appraisers now assess coach homes as income-generating assets, so a well-built unit can raise your property's appraised value on top of the rent it earns. How much depends on your lot, build quality, and local market.

What's Included

One team. One contract.
From sketch to keys.

01 · DESIGN

Architectural & Interior Design

In-house architects and designers plan a coach home that makes the most of your lot and matches your main home, with rental and resale in mind.

  • Feasibility & site study
  • 2D floorplans & 3D renderings
  • Interior specification
  • Material & finish selection
  • Structural design
02 · PERMITS

Approvals, Permits & Compliance

We handle every submission: zoning, building, electrical, plumbing and HVAC. We manage Bill 23 compliance and Ottawa By-Law 2008-250 from start to finish, so your build is legal and insurable.

  • Zoning verification
  • Minor variance (if required)
  • Building permit
  • Trade permits (ESA, plumbing, HVAC)
  • Final occupancy certificate
03 · BUILD

Construction & Finishing

Our own crews and long-term trade partners build your coach home to spec. The fixed price, timeline and warranty are in writing before demolition starts.

  • Foundation & framing
  • Insulation, drywall, flooring
  • Kitchen, bath, electrical, plumbing
  • HVAC, exterior cladding, roofing
  • Landscaping & walkway
Recent Coach Homes

Ottawa builds,
designed by us.

Manotick coach home, 750 sq ft secondary suite by Dream Touch Renovations
Manotick · 2025
750 Sq Ft Coach Home
Glebe coach home, 650 sq ft secondary suite by Dream Touch Renovations
Glebe · 2025
650 Sq Ft Coach Home
Kanata coach home, 550 sq ft secondary suite by Dream Touch Renovations
Kanata · 2024
550 Sq Ft Coach Home
Dunrobin coach home, 550 sq ft secondary suite by Dream Touch Renovations
Dunrobin · 2024
550 Sq Ft Coach Home
Riverside Ottawa coach home, 530 sq ft secondary suite by Dream Touch Renovations
Glebe · 2023
530 Sq Ft Coach Home
Riverside coach home, 530 sq ft secondary suite by Dream Touch Renovations
Riverside · 2025
530 Sq Ft Coach Home
Orleans coach home loft interior, garage + loft live-work conversion by Dream Touch Renovations
Orleans · 2025
500 Sq Ft Coach Home
Kars coach home, 450 sq ft secondary suite by Dream Touch Renovations
Kars · 2025
450 Sq Ft Coach Home
Ottawa Zoning & Bill 23

Is your lot
eligible?

Bill 23 (More Homes Built Faster Act) now permits up to three residential units on most Ottawa lots, including a coach home or garden suite. Eligibility depends on lot dimensions, setbacks, and servicing, and Dream Touch checks each of these before you sign.

  • Lot at least 270 m² (≈2,900 sq ft), most Ottawa suburban lots qualify
  • Minimum 1.2 m setback from rear and side property lines
  • Access to municipal water and sanitary sewer
  • Maximum 40% rear yard coverage (coach home + existing structures)
  • Separate entrance and servicing from main home

If you're not sure your property qualifies, we pull your zoning, check servicing and send a free written feasibility report within 48 hours, before you commit to anything.

Read our Bill 23 guide
Sample Site Plan · Barrhaven Lot 40 × 100 ft
OTTAWA STREET Main Home 2-STOREY · 2,100 SQ FT Coach Home 720 SQ FT · 1-BR 6m 1.2m 1.5m rear N 0 3m 6m
Build Tiers

Transparent pricing.
Zero surprises.

Every coach home is quoted as a fixed-price contract signed before demolition. The tiers below show what each scope includes. Your written proposal is priced on your finishes, lot conditions, and the full design-permit-build scope.

Basic one-storey coach home elevation, Standard tier, Ottawa
Standard
1-bedroom coach home, 550–700 sq ft, with builder-grade finishes.
Builder-grade scope
Design · Permits · Build · Keys
  • 1 bedroom + 1 full bathroom
  • Open concept kitchen & living
  • Quartz counters, luxury vinyl flooring
  • Energy-efficient HVAC & appliances
  • Full permit package included
  • 1-year workmanship warranty
Two-storey coach home elevation, Custom tier, Ottawa
Custom
Fully custom design: two-storey, over 900 sq ft, with luxury finishes.
Quoted
Fully custom scope
  • Two-storey or oversized footprint
  • Custom architectural package
  • Luxury appliance & finish specs
  • Heated floors, skylights, cathedral ceilings
  • Solar-ready, net-zero options
  • Full landscape architecture
  • 10-year structural warranty
What Moves Your Quote

What actually drives
your price.

A few things move a coach-home quote up or down, and your written proposal spells out each one.

Your lot & servicing

How far water, sewer, and hydro have to run to the rear yard, whether the lot is corner or interior, and how much access there is for equipment. Long service runs and tight access add labour; a short, open run keeps costs down.

Size, storeys & foundation

A compact one-bedroom on a slab is the leanest build. More square footage, a second storey, or a full frost-wall foundation on difficult soil adds structural and framing work.

Finish level & site work

The biggest cost you control is builder-grade versus premium cabinetry, tile, and flooring. Landscaping, a finished walkway, tree protection, and grading are itemised, so you decide what stays.

The Process

From idea to keys.
Five steps, one team.

Step 01
Feasibility
48 hours
Step 02
Design
4–6 weeks
Step 03
Permits
8–14 weeks
Step 04
Construction
16–24 weeks
Step 05
Handover
Day of keys
Sample Floorplan · 720 sq ft 1 BR · 1 BA
Coach home floor plan — 720 sq ft first floor with 620 sq ft ground-floor garage, Ottawa
Designed for Real Living

Smart layouts
that feel bigger.

Our in-house architects design every Dream Touch coach home to get the most light and usable space from a small footprint, with open-concept living, a proper kitchen work triangle, and bedrooms set apart from the living area.

  • Open living, dining, and kitchen, feels twice its size
  • Full-size appliances and pantry storage
  • Bedroom with proper closet and privacy wall
  • Full bathroom with tub/shower combination
  • 9' ceilings as standard, so the unit never feels cramped
  • Windows on three sides for natural light
See Our 3D Renderings →
Ottawa Clients

Built on trust.
Rented by month two.

★★★★★

Dream Touch handled our Barrhaven coach home from the zoning check through the day we got keys. The permit phase was the part I was dreading. They took it off my plate entirely. Tenant moved in six weeks after completion.

M
Marc D.
Barrhaven · 720 sq ft Coach Home
★★★★★

We built a coach home for my mother-in-law so she could stay close but independent. Every decision was explained, every change signed off in writing. On time, on budget, and she loves it.

P
Priya & Sam R.
Kanata · 860 sq ft Coach Home
Coach Home · Laneway House · Garden Suite

Same idea,
many names.

Search "laneway house Ottawa," "garden suite," or "ADU" and you land on the same building we design: a self-contained second home on your existing lot. The name changes with the city and the by-law. Here is how the terms line up in Ottawa.

Coach house / coach home

The term the City of Ottawa and By-Law 2008-250 use most often for a detached second dwelling in the rear yard. It is the name that ends up on your permit and zoning file.

Garden suite

Ontario's Bill 23 wording for the same detached backyard unit. You will see "garden suite" in provincial policy and in newer Ottawa zoning references, and it means the same building as a coach home.

Laneway house, ADU, granny flat

"Laneway house" is the Toronto and Vancouver name; "accessory dwelling unit" is the planning term; "granny flat" and "in-law suite" are the everyday ones. All describe an independent home with its own kitchen, bath, and entrance.

What is a secondary dwelling unit in Ontario?

A secondary dwelling unit is a second self-contained home on a property that already has a house, with its own kitchen, bathroom and sleeping space. Ontario's Planning Act calls them additional residential units.

Since Bill 23 (2022), no official plan may prohibit up to three units in a house on urban residential land, or two in the house plus one in a separate building such as a coach house (s. 16(3)). Ottawa's zoning calls them additional dwelling units and coach houses.

Can you have two houses on one property in Ontario?

Yes, as a main house plus one secondary home. On urban residential land, Ontario's Planning Act (s. 16(3)(c)) protects one unit in a building beside a detached house, semi or rowhouse, as long as the house holds no more than two units.

In Ottawa, Zoning By-law 2008-250 (s. 133) allows one coach house per lot, caps the lot at three units and keeps the coach house on the same lot as the house it serves. Applications complete since 2026-03-11 must also meet the new By-law 2026-50, and the stricter rule applies.

Does a coach house have a garage?

It can, but it does not need one. In Ottawa, an accessory building that already stood on the lot on 2015-09-14, such as a detached garage, may be altered to contain a coach house (Zoning By-law 2008-250, s. 133(15) and (16)).

In rural and village zones, a building that holds a coach house and a garage parking space may be up to 6.1 m tall, where the limit is otherwise 4.5 m. Where the coach house has a parking space, it goes in the main house's driveway and may be in tandem.

Where Coach Homes Fit Best

The best Ottawa lots
for a coach home.

Almost any lot over about 270 m² can qualify, but a coach home is easier to build in some neighbourhoods than others. Here is how Ottawa's areas tend to sort out; your feasibility report confirms where your address lands.

Deep suburban lots

Barrhaven, Kanata, Orleans, Stittsville, and Riverside South. Long rear yards, full municipal water and sewer, and strong tenant demand make these the most straightforward coach-home builds in the city.

Mature infill

Nepean, Alta Vista, Bells Corners, and Manotick. Wide, established lots with room to build. We check mature-tree protection, grading, and how far existing services sit from the rear yard.

Central & heritage

The Glebe, Westboro, and Old Ottawa South. Demand is highest here, but lots are tighter and some sit inside a heritage district, so a feasibility check and a careful site plan matter most in these pockets.

Coach House · Home Addition

Coach house or
home addition?

Both add living space to an Ottawa lot, and Dream Touch designs, permits and builds both. The deciding question is whether the new space will be its own home or part of yours.

When a coach house is the right build

Choose a coach house when the space is for someone who needs their own door, kitchen and bathroom: a tenant, a parent, an adult child. It is a secondary dwelling unit in its own building, so it needs a building permit and, in the urban area, must run off your house's water and sewer connection.

The City also notes that rent from a coach house counts as income under the Income Tax Act, that your property assessment may change, and that your insurer should hear about the plan early (City of Ottawa, Adding a coach house).

When a home addition is the right build

Choose an addition when the new room is for the people already in the house: a second floor of bedrooms, a bigger kitchen at the back, a bump-out for a bathroom. An addition is part of your house, not a second unit, so it does not count against the units your lot allows.

Our home additions in Ottawa page covers second floor, rear, side and bump-out builds. Many lots take both: an addition for the family and a coach house for rent, where setbacks and lot coverage leave room.

Why are coach houses cheaper than a second property?

The land is already yours, and in Ottawa's urban area a coach house shares your house's water and sewer connection instead of needing its own from the street. What it takes on your lot turns mostly on how far those services must run to the rear yard, which our feasibility report checks first.

On a lot with a septic system or a well, the City allows one additional dwelling or one coach house, not both. The Ottawa Septic System Office confirms whether the system can take the extra load.

Common Questions

Coach homes,
explained.

The questions we answer most often during Ottawa feasibility reviews. If yours isn't here, call us and we'll talk through your property.

Call 613-862-4555

Most residential lots in Ottawa over 270 m² (2,900 sq ft) qualify under Bill 23 and Ottawa By-Law 2008-250. Key factors are lot size, rear yard depth, servicing access, and setbacks. We confirm eligibility in a free 48-hour feasibility report before you commit to design.

Rental income depends on unit size, layout, finish level, and neighbourhood demand. We provide a neighbourhood-specific rental comparison in your feasibility report, drawn from current Kijiji, Zumper, and local property management data, so your projection reflects your local market instead of a generic estimate.

Expect 10–14 months end-to-end: 4–6 weeks for design, 8–14 weeks for permits (Ottawa's current processing times), and 16–24 weeks for construction. Our 98% on-time rate is backed by a written delivery date in your contract.

Not always. Most Ottawa coach homes share servicing with the main home via a sub-metered connection. Separate water and sewer laterals are typically only required for triplex conversions. Our permit team handles the engineering review and City Works approvals.

Yes. Most Ottawa homeowners finance coach homes via HELOC, refinance, or construction-to-permanent loans. We partner with three Ottawa mortgage brokers who specialize in ARU financing. See our financing page for full details.

1-year DTR workmanship warranty across all tiers. 10-year structural warranty on Custom-tier builds. Every build is covered by Tarion new-home warranty where applicable. Full warranty details are included in every signed contract.

Corner lots often make excellent coach-home sites. Because they front two streets, the coach home can usually get its own entrance, and sometimes its own address, off the side street. The trade-off is two front-yard setbacks instead of one, so we map the exact corner-lot setbacks on your site plan before design begins.

In most of Ottawa's urban and suburban zones, no additional on-site parking is required for a coach home or garden suite under the current by-law. Some outer zones still ask for one space. We confirm the exact parking rule for your property in your feasibility report so the design accounts for it from day one.

A home inside a Heritage Conservation District, or with its own heritage designation, can still add a coach home. The design goes through an added heritage review, and the exterior materials and massing have to respect the district's guidelines. Our permit team handles the heritage approval alongside the building permit so it does not stall your build.

Yes. Foundation work is scheduled around frost, and once the shell is framed, closed in, and temporarily heated we finish the interior right through winter with no loss of quality. Starting design in the fall often means breaking ground the following spring with permits already approved and in hand.

On rural and estate lots served by a private well and septic, a garden suite is still possible, but the septic system has to be sized, and sometimes upgraded, for the extra bedrooms, and a qualified designer files the septic approval. We assess your existing well and septic capacity as part of the feasibility review before design.

A recent coach house build in Ottawa

A Kanata coach house, written up in full: the layout, the servicing and what drives a coach house budget.

Your Coach Home Starts Here

Free feasibility.
48-hour turnaround.
Zero obligation.

Tell us your address. We pull your zoning, check servicing and setbacks, and email back a written feasibility report with estimated ranges, in under two business days.

100s
Ottawa Projects
4.7★
Google Rating
20 yrs
Est. 2004
A+
BBB Rated

Request My Free Feasibility Report

We use your information only to prepare your feasibility report, and we never share it.

By submitting, you agree to receive one feasibility report and optional follow-up, with no sales pressure.