The Glebe semi I worked on last fall was 1,180 square feet on three floors. The owners had two kids, a home office, a dog, and a record collection. They thought they needed an addition. They didn't. They needed someone to find the 90 square feet of usable floor space their existing house was wasting.
Ottawa is full of these homes: 1.5-storey wartime bungalows in Westboro, 1920s rowhouses in Hintonburg, 1960s split-levels in Alta Vista, 1,400-square-foot freehold townhomes in Barrhaven and Stittsville. They were not designed for the way we live now. But almost every one of them has reclaimable space hiding in plain sight.
Here is how my team finds it.
Stop Thinking in Floor Plans, Start Thinking in Cubic Feet
Most homeowners look at a small room and ask "where can I put more stuff on the floor?" Wrong question. Look up. Most rooms have 8 to 9 feet of ceiling and use the bottom 6 feet. Above that is wasted air.
What you can do with the top 2-3 feet:
- Cabinets to the ceiling. Standard kitchen uppers stop at 84-90 inches and leave a dust-collecting soffit above. Take them to 96 inches (or up to a bulkhead) and you gain 30% more cabinet volume in the same footprint.
- Built-in shelving over doors. A 12-inch deep shelf above every interior door on a hallway adds 8-12 cubic feet of book or decor storage no one was using.
- Wall-hung cabinetry in bathrooms. Floating vanities free up the floor visually (looks bigger) and make cleaning under them realistic.
- Loft beds in kid bedrooms. A built-in bunk with a desk underneath in a 9x10 bedroom turns a tight room into a desk + bed + storage zone.
Reclaimed Dead Space (Where the 90 Square Feet Hide)
Every Ottawa home has them. Walk through and you will see at least three. Most homeowners do not, because the dead space looks like part of the house.
Under the stairs
The classic. In a typical 1.5-storey or 2-storey, the volume under the stairs is 25-50 cubic feet of cabinet space, more than half a typical hallway closet. Options that actually work in Ottawa homes:
- Pull-out drawers from the side (best for shoes, bags, boots, sports gear).
- A built-in dog crate (Westboro semi we did last year, custom oak slatted door, dog has the best room in the house).
- A powder room (only if you have plumbing within 8 feet, otherwise it gets expensive).
- A wine cellar with a cooling unit if you have the budget for it (a custom retrofit, priced by size, insulation, and the cooling unit you choose).
- A reading nook with a bench, drawer storage under the seat, and a sconce.
Soffits and bulkheads
The boxed-in space above kitchen cabinets, between rooms, or at the corner of a basement is usually empty. Sometimes it is housing a duct or a beam, sometimes it is just lazy framing from 1972. Have your contractor open one and find out. Half the time it is reclaimable for cabinets, recessed niches, or a flush-mount LED.
Kneewalls in 1.5-storey homes
The 1.5-storey is one of Ottawa's most common formats: bungalows in Westboro, Manor Park, and Britannia where the upper floor has a sloped ceiling and short walls (the kneewalls) at the perimeter. Behind those kneewalls is 18-36 inches of unfinished space running the full length of the wall. That is 60-120 cubic feet per side, two sides per room, lost.
What we put in there:
- Pull-out drawer banks on full-extension rails (off-season clothes, linens, kid art).
- Built-in dressers (saves the floor space a freestanding dresser would take).
- Hidden study nooks for the home office that has no other room (a Hintonburg 1.5-storey we did has a 30-inch deep hidden desk behind a hinged kneewall panel).
- HVAC chases for retrofit ductwork on second-floor renos (avoids losing closet depth).
Stair landings and corners
The half-landing on a typical Ottawa split-level is usually 3x4 feet of dead floor with a window above. Add a 14-inch deep built-in bench with drawer storage and a coat hook bar, you have a mudroom that did not exist before.
Pro tip
Walk your house with a tape measure and a notebook. Every closet, every soffit, every dead corner. Note the dimensions and the function. You will find 40-80 cubic feet of unused volume in any Ottawa home built before 2000. That is enough storage to delay a basement reno by five years.
Dual-Purpose Rooms (the Honest Version)
Pinterest is full of dual-purpose rooms that do not actually work. Here is what does, and what does not, in real Ottawa homes:
Works:
- Guest room + home office (Murphy bed against one wall, desk against the opposite, 24 hours of conversion).
- Dining room + library (full-height built-in bookcases on two walls, table at the centre).
- Mudroom + laundry + dog wash (combined utility room with stacked washer/dryer freeing floor for a dog station).
- Basement rec room + gym (gym mats roll up, equipment lives in a closet, room becomes a movie room in 8 minutes).
Does not work:
- Office + kid playroom. The office becomes the playroom and you never work there again.
- Dining room + craft room. Pick one. Crafts on the dinner table is fine for two weeks, after that the dinner table is closed for business.
- Bedroom + gym in the same room. The bed becomes a clothes rack, the treadmill becomes a coat rack.
The dual-purpose rooms that actually work share a quality: the two functions never need to happen at the same time. The ones that fail try to fit both functions into the same Tuesday evening.
Light and Colour (Free Square Footage)
You cannot make a 9x11 kitchen physically bigger without moving a wall, but you can make it feel 30% bigger with light and colour. Three rules I follow on small Ottawa kitchens and bathrooms:
- One light source per 25 square feet of floor. A 9x11 kitchen needs at least four points of light, not one ceiling fixture.
- Light walls, slightly lighter ceiling, slightly darker floor. The ceiling becomes the lid of the room. Painting it the same colour as the wall (in eggshell, not flat) erases the corner and the room reads taller.
- Glass on at least one cabinet bank. All-solid uppers in a small kitchen feel like a wall. One run of glass-fronted cabinets at the end gives the eye a place to rest and the wall feels lighter.
On colour, neutral does not mean boring. Warm whites with grey undertones (not yellow undertones) read clean in Ottawa's flat winter light. Save the saturated colour for accents (one wall, one cabinet, one tile run) so the eye has somewhere bold to land but the room itself stays open.
Fold-Down and Extending Furniture
Small-space living is a furniture problem as much as a renovation problem. The renovation creates the space; the furniture decides whether you actually use it.
- Murphy beds. A modern Murphy with integrated shelving turns a 12x10 room into a true office that hides a queen bed in 30 seconds. Price tracks the cabinetry, the bed mechanism, and how much custom millwork wraps around it.
- Drop-leaf tables. A 36-inch wide drop-leaf along a wall extends to 60-inch dining for six. The rest of the time it is a console.
- Banquette dining. A built-in bench around a corner gains you 20-30% more seating per square foot than chairs and adds drawer storage under the seat.
- Pocket doors. Every swinging interior door takes up 9-12 square feet of arc. Pocket doors in a small bathroom, a small office, or a pantry give you that floor space back. A retrofit means opening the wall and setting a pocket frame, so cost depends mainly on whether the wall is load-bearing and what runs inside it.
- Sliding barn-style hardware. Same logic as pocket doors but cheaper to retrofit on existing rough openings.
Niche-Style Recesses (Where Walls Become Storage)
Inside every interior wall is 3.5 inches of stud-bay depth. A 14.5-inch wide bay between studs is enough for a recessed niche, a medicine-cabinet-style storage panel, or a built-in spice rack.
Real applications I have built in Ottawa homes:
- Recessed shower niches (24 inches wide, two stud bays merged with proper waterproofing) instead of corner caddies that always look temporary.
- Recessed knife and cookbook niche on the wall behind a kitchen prep zone.
- Wall-recessed iron board (the kind that flips down from a 4-inch deep cabinet) in a laundry closet.
- Recessed pet feeding station at toe-kick height (carved into the kitchen toe kick, water and food dishes never get kicked).
Pro tip
Niches are free real estate, but only if the wall is non-load-bearing and the bay is empty. Have your contractor scope out the wall with a stud-finder and an inspection camera before you commit. Hitting a duct, a pipe, or a structural element on day-of-tile turns a simple niche into a costly rerouting problem.
The Short Version
Small Ottawa homes are not a problem. They are a design challenge that rewards specific tactics: think in cubic feet, hunt the dead space, pick dual-purpose rooms that work, use light and colour to fake square footage, choose furniture that earns its footprint, recess where the wall is empty.
If you want a contractor's eye on your space (the spots in your house that are quietly wasting 60+ cubic feet), our free 48-hour feasibility review is the easiest way to start. Call 613-862-4555 or book through our contact page, and bring a tape measure to the walkthrough. We will find space you did not know you owned.
Frequently asked questions
Where is the hidden storage space in a 1.5-storey Ottawa home?
The biggest hidden storage in a 1.5-storey Ottawa home sits behind the kneewalls, the short walls under the sloped upper ceiling. Behind them is 18 to 36 inches of unfinished space running the full length of the wall, or 60 to 120 cubic feet per side.
That space can take pull-out drawer banks on full-extension rails, built-in dressers, a hidden desk behind a hinged panel, or HVAC chases for retrofit ductwork on second-floor renovations.
What can I build in the space under the stairs?
The space under the stairs in a typical 1.5-storey or 2-storey home holds 25 to 50 cubic feet, more than half a typical hallway closet. Options that work include side pull-out drawers for shoes, bags and boots, a built-in dog crate, a reading nook with a bench and drawer storage, or a wine cellar with a cooling unit.
A powder room under the stairs only makes sense with plumbing within 8 feet; otherwise it gets expensive.
Which dual-purpose rooms actually work in a small house?
Dual-purpose rooms work when the two functions never need to happen at the same time. Good pairings are a guest room with a home office using a Murphy bed, a dining room with a library of full-height built-in bookcases, a mudroom with laundry and a dog wash, and a basement rec room with a gym.
Pairings that fail include an office with a kids' playroom, a dining room with a craft room, and a bedroom with a gym.
How can lighting and paint make a small room feel bigger?
Light and colour can make a small room feel about 30 percent bigger without moving a wall. Plan one light source per 25 square feet of floor, so a 9x11 kitchen needs at least four points of light. Keep walls light, the ceiling slightly lighter and the floor slightly darker, or paint the ceiling the wall colour in eggshell so the room reads taller.
In a small kitchen, one bank of glass-fronted cabinets stops the uppers reading as a solid wall.
Can I add a recessed niche to any interior wall?
A recessed niche only works in a wall that is non-load-bearing with an empty stud bay. An interior wall has 3.5 inches of stud-bay depth, and a 14.5-inch bay between studs fits a niche, a recessed storage panel or a spice rack.
Before committing, have the wall checked with a stud finder and an inspection camera. Hitting a duct, a pipe or a structural element on tile day turns a simple niche into a costly rerouting problem.
Official references
- Keeping the Heat In, Natural Resources Canada