← All How-To articles
← All How-To articles
Advanced DIY · Exterior

How to Install Composite Decking

Exterior work fails in Ottawa winters when water gets behind something it shouldn't. The detail that matters is flashing: where every horizontal meets every vertical, water has to be…

Advanced 1–3 days for typical deck

Composite decking (Trex, TimberTech, AZEK) is the modern alternative to wood decking — won't rot, won't splinter, doesn't need staining. Lasts 25-30 years vs wood's 10-15. Install is similar to wood decking with one critical addition: hidden fastening systems that allow expansion/contraction with temperature changes. This guide covers a typical composite deck install over an existing structural framing.

For new deck construction (framing, joists, ledger), see related deck-construction guides.

Before you start

Three things to settle:

1. Hidden fasteners or face screws. Composite decking installs with hidden fastener systems (clips between boards) for clean appearance with no visible screws. Or face screws (visible) for cheaper, faster install. Hidden fasteners cost more but look better.

2. Joist spacing. Standard composite decking requires joists 16 inches on centre. Some lighter composites or longer spans require 12 inches on centre. Verify your specific decking's spec — wrong joist spacing causes sag and warranty void.

3. Expansion gaps. Composite expands and contracts with temperature. End-to-end gaps: 1/8 to 1/4 inch between boards depending on temperature at install. Side-to-side: typically 1/4 inch between boards. Without gaps, boards buckle in summer or develop visible gaps in winter.

What you'll need

Tools

  • Cordless drill with bits
  • Mitre saw or circular saw
  • Hidden fastener kit (proprietary to brand)
  • Tape measure and pencil
  • Speed square
  • Spacers (1/4 inch, included in some kits)
  • Knee pads

Materials

  • Composite decking boards
  • Hidden fastener clips (matching brand)
  • Stainless steel deck screws (for face screwing if applicable)
  • Joist tape (protects framing from water)

Composite isn't infinitely durable

Composite decking won't rot or splinter, but it does scratch (heavy furniture, dropped tools). It also gets very hot in direct sun — surface temperatures over 60°C in mid-summer can burn bare feet.

Match composite type to your deck's exposure. Capped composites (with polymer top layer) are more scratch-resistant than uncapped.

Step-by-step instructions

Inspect framing

Verify joists are 16 inches on centre (or 12 inches if specified by composite brand for span/load).

Check joists for damage, level, plumb. Repair before decking install.

Apply joist tape (self-adhesive moisture barrier) over joist tops. Protects framing from water seeping through deck board gaps.

Plan layout

Decide direction of deck boards — typically perpendicular to longest dimension.

Plan starter board location — typically away from house wall, with 1/4 inch gap from wall for ventilation.

Install starter board

First board is face-screwed (visible screws) or installed with the kit's starter clips.

Position 1/4 inch from house or rim joist.

Drive stainless steel deck screws every 12-16 inches into joists below.

Install hidden fasteners

Hidden fastener kits use clips that screw into joists between boards. Each clip secures the previous board's edge and creates the spacing for the next board.

Place a clip at each joist position, alternating with each board.

Drive included screws to anchor clips.

Install subsequent boards

Slide each new board's edge into the previous board's clips. The clip's spacing arm sets the gap automatically.

Add new clips at each joist position to secure this board's far edge.

Continue across the deck.

Cut boards to length and at obstacles

Cut to length with mitre saw. Composite cuts cleanly with carbide blades.

End-to-end butt joints between boards: 1/8 inch gap to allow expansion. Use spacers.

Stagger end joints

End joints in adjacent rows should be at least 12 inches apart. Stagger as deck boards continue across joists.

Plan piece lengths for staggering — sometimes requires sacrificing 6-12 inches of cut-off.

Install picture-frame border (optional)

Some installations finish with a 'picture frame' — boards run perpendicular to main deck around the perimeter.

Adds visual finish; covers cut ends of main deck boards.

Mitre corners at 45 degrees.

Install fascia and skirting

Fascia: vertical composite board covering the rim joist's outer face. Hides framing for clean look.

Skirting: optional vertical boards below the deck around perimeter, hiding the underside.

Use composite fascia matching deck colour.

Common mistakes that cost you

Frequently asked questions

How long does composite decking last?

25-30 years typical, with 25-year warranties common. Better than wood's 10-15 years.

Surface scratches accumulate over time. Capped composite resists scratching better than uncapped.

Composite or pressure-treated wood?

Composite: longer life, no maintenance, higher upfront material cost.

Pressure-treated: lower upfront material cost, needs annual maintenance, splinters with age, replace every 10-15 years.

Most modern deck builds choose composite for the lower lifecycle cost.

When to call us instead

Deck building is a multi-trade renovation involving framing, decking, railing, and exterior finish. We do decks as fixed-price scopes with permits, materials, and finish.

Book a free 60-minute site visit →

Related Ottawa services

If you're building or replacing a deck, our renovation team handles framing, decking, and railing as fixed-price work. Book a free 60-minute consultation.