Deck railing is a code-required safety feature on any deck more than 24 inches above grade in Ontario. The railing must withstand 200 lbs of horizontal force at any point — engineered specifications that aren't optional. The install includes posts attached securely to the deck structure, top and bottom rails between posts, and balusters spaced no more than 4 inches apart.
This guide covers wood railing installation. Composite, aluminum, and glass railings have similar structural requirements with different installation hardware.
- Skill level
- Advanced
- Time
- 1–2 days
- Steps
- 8
- Tools
- 7, listed below
- Materials
- 6, listed below
Before you start
Three things to settle:
1. Code requirements. Ontario Building Code: railing required at any deck over 24 inches above grade. Minimum height 36 inches (1070mm) for guards above 1.8m grade, 42 inches (1070mm) for guards above 1.8m. Baluster spacing: maximum 4 inches (100mm) between balusters. These are minimums — your home insurance and resale demand compliance.
2. Post anchoring is critical. Posts must be anchored to deck framing (joists or rim board), not just to deck boards. Use through-bolts (carriage bolts) through the rim/joist with washers and nuts. Lag screws into the side of a joist are insufficient for code load.
3. Permit may be required. Adding new deck railings (especially as part of larger deck construction) requires building permit in Ottawa. Replacing existing for like-for-like: usually no permit. Confirm before starting major work.
What you'll need
Tools
- Cordless drill with bits
- Drill bits and pilot bits
- Mitre saw or circular saw
- Tape measure and level
- Speed square
- Wrench (for through-bolts)
- Pencil
Materials
- Pressure-treated 4×4 posts (or 6×6 for larger spans)
- Pressure-treated 2×4 top and bottom rails
- Pressure-treated 2×2 balusters (or commercial baluster sets)
- 5/8 inch through-bolts (carriage bolts) with washers and nuts
- 3-inch deck screws (galvanized or stainless)
- Construction adhesive (PL Premium)
Through-bolt the posts
Lag screws into deck joists from the side fail under code loading. Posts must be through-bolted: 5/8 inch carriage bolt drilled completely through the rim joist, with a washer and nut on the inside.
This is the only mounting method that meets the 200-lb horizontal load requirement. Skipping through-bolts is a code violation and dangerous.
Step-by-step instructions
Plan post locations
Posts at every corner and 6 feet on centre maximum along straight runs.
Plan post locations relative to deck framing — posts must align with rim joists or solid blocking.
Install posts at corners
Position post at the corner, with bottom even with the underside of deck framing.
Drill two through-holes (5/8 inch) horizontally through the post AND the rim joist behind. Holes should be staggered (not on same vertical line).
Drive carriage bolts through the post and joist. Tighten with washer and nut on the inside.
Install intermediate posts
Same process for posts along straight runs — through-bolt into the rim joist or solid blocking.
Maximum 6 feet between posts.
Install top rail
Cut top rail (2×4 or commercial top rail) to fit between posts.
Position with top edge at desired height (36 inches for standard residential deck).
Drive 3-inch deck screws from the inside of the post into the rail end. 2-3 screws per joint.
Install bottom rail
Bottom rail typically 4-6 inches above deck surface. Allows water drainage; cleanable.
Same installation: cut to length, screw through post into rail end.
Install balusters
Cut balusters to length (top rail to bottom rail).
Space 4 inches maximum between balusters (code requirement). Use a 4-inch spacer block to ensure consistent spacing.
Drive screws through top and bottom rails into baluster ends.
Verify code compliance
Test at multiple points: push horizontally with 200 lbs of force (your full body weight if you weigh 200 lbs).
Railing should not flex visibly or move at any point. Posts should not pivot.
If anything moves, add additional through-bolts or blocking.
Apply finish
Pressure-treated wood: clean and let weather a few months before applying stain or sealer.
Apply deck stain or sealer to protect from weather. Re-apply every 2-3 years for outdoor longevity.
Common mistakes that cost you
- Lag screws instead of through-bolts. Code violation. Always through-bolt posts.
- Baluster spacing over 4 inches. Children can fit through. Code violation; safety hazard. Maximum 4 inches.
- Posts too far apart. Maximum 6 feet between posts. Wider spans flex under load.
- Skipping the permit. Major railing work requires permit in Ottawa. Working without voids insurance.
- Using regular nails or screws into pressure-treated wood. Corrodes the fasteners. Use galvanized or stainless steel only.
Frequently asked questions
What's the minimum railing height?
Ontario Building Code: 36 inches (914mm) for residential decks under 1.8m above grade. Higher decks require 42 inches.
Many homeowners go 42 inches across the board for consistency and safety.
Why are through-bolts required?
Through-bolts pass completely through the post and rim joist, with a washer and nut on the inside. Distributes load across both pieces.
Lag screws pull out under sustained horizontal force; through-bolts can't pull free without breaking the wood.
Can I use composite or aluminum railings?
Yes — composite (Trex, TimberTech) and aluminum railings install with kit-provided hardware. The structural requirements are the same as wood.
Modular kits often pre-engineered to meet code. Verify Ontario code compliance before purchase.
How far apart can deck railing balusters be spaced?
Deck railing balusters can be no more than 4 inches (100mm) apart under the Ontario Building Code. Wider gaps let children fit through and are a code violation. Cut the balusters to length between the top and bottom rail and set each one with a 4-inch spacer block to keep the spacing consistent, then drive screws through the top and bottom rails into the baluster ends.
The bottom rail typically sits 4 to 6 inches above the deck surface for drainage and cleaning.
How far apart should deck railing posts be?
Deck railing posts go at every corner and no more than 6 feet on centre along straight runs, since wider spans flex under load. Each post has to line up with a rim joist or solid blocking, because posts are through-bolted with two staggered 5/8 inch carriage bolts, washers and nuts.
After installation, push horizontally at several points. The railing should not flex visibly and the posts should not pivot. If anything moves, add through-bolts or blocking.
When to call us instead
Deck railings are safety-critical. Failed railings cause serious injuries. Professional installation ensures code compliance and structural integrity. We do deck work as part of exterior renovations.
Book a free 60-minute site visit →Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555
Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.
Related Ottawa services
If you're updating decks or exterior structures, our renovation team coordinates carpenters and engineers as part of fixed-price work. Book a free 60-minute consultation.