← All How-To articles
← All How-To articles
Advanced DIY · Kitchens · Plumbing Swap

How to Install a Garbage Disposal

Plumbing swaps go wrong when people rush the shut-off and torque step. Take an extra two minutes shutting things down properly and you eliminate 80% of the failures we get called to fix.

Advanced 1–3 hr

A garbage disposal mounts under the kitchen sink, intercepting food waste before it enters the drain plumbing. The install combines plumbing (drain modifications) and electrical (120V dedicated circuit, sometimes hardwired, sometimes plugged in). The job is a Advanced DIY because of the simultaneous trades, but standard for confident installers.

This guide covers a like-for-like replacement (existing disposal swapped) and adding a disposal to a sink that doesn't have one (more involved). Note: in some Ontario jurisdictions, garbage disposals are restricted or require permits — verify with local plumbing inspector.

Before you start

Three things to settle:

1. Check local code. Some Ontario municipalities restrict garbage disposals due to water treatment plant capacity. Verify whether disposals are allowed in your area. Where allowed, they typically require permitting if newly installed.

2. Disposal type and HP rating. 1/3 HP: light-duty, suitable for one-person households. 1/2 HP: standard residential. 3/4-1 HP: heavy-duty, larger families and frequent use. Higher HP means smoother grinding and less chance of jams. Lifespan: typical disposal is 8-15 years.

3. Plumbing changes. Adding a disposal: requires modifying the existing sink drain plumbing (T-fitting and tail piece replacement). Replacing existing: connections may not match exactly between brands; expect to swap drain components.

What you'll need

Tools

  • Slip-joint pliers
  • Adjustable wrench
  • Phillips screwdriver
  • Drill (for installing electrical box if needed)
  • Voltage tester
  • Bucket and old towels
  • Hammer (for snapping out the disposal's dishwasher inlet plug, if applicable)
  • Plumber's putty
  • 77ae">Plumber's putty

Materials

  • Garbage disposal (matching HP rating to needs)
  • Mounting kit (typically included)
  • P-trap and slip-joint connectors (for drain modifications)
  • Dishwasher discharge tube (if disposal connects to dishwasher drain)
  • Plumber's putty
  • Wire nuts (for electrical connections)
  • Plumber's tape

Don't put bones, fibrous vegetables, or grease down a disposal

Garbage disposals are designed for soft food waste — fruit and vegetable scraps, eggshells, small bone pieces.

Avoid: large bones, celery and corn husks (fibres tangle), grease (clogs drains downstream), pasta and rice (expand and clog), coffee grounds in large quantities, eggshells in large quantities.

Following these rules extends disposal life from 5 to 15 years and prevents drain clogs.

Step-by-step instructions

Turn off power and water

Switch off the breaker for the disposal (or unplug if cord-connected).

Verify with voltage tester at the existing disposal's connection.

Place towels under the sink — the existing disposal will have residual water.

Disconnect existing disposal (if replacing)

Disconnect the dishwasher discharge tube and the main drain hose.

Disconnect electrical wires (junction box on the disposal's underside).

Use the disposal's mount lock — most have a metal locking ring that twists to release the unit from the sink-mount flange. Twist counterclockwise; the disposal drops free.

Remove old sink-mount flange (if needed)

If the new disposal uses a different mounting system, remove the existing sink-mount flange. The flange is held by a nut underneath the sink.

Loosen the nut, drop the flange. Clean the sink's drain opening of any old plumber's putty.

Install new sink-mount flange

Apply a rope of plumber's putty (1/4 inch diameter) under the new sink-mount flange.

Drop the flange into the sink's drain opening. From below, install the supporting hardware (gasket, mounting ring, snap ring) per the disposal's instructions.

Tighten the mount until the flange seats firmly against the sink.

Wire the new disposal

Open the disposal's electrical compartment (usually a small plate on the underside). Connect the cable's wires to the disposal's wires:

Black to black (hot), white to white (neutral), green or bare to ground.

Use wire nuts. Pull-test connections.

Hang the disposal on the mounting ring

Lift the disposal up to the sink. Align with the mounting ring on the bottom of the sink-mount flange.

Twist the disposal's locking collar clockwise until it engages and locks. The disposal hangs from this connection.

Connect the dishwasher discharge tube (if applicable)

If a dishwasher discharges into the disposal, knock out the dishwasher inlet plug on the disposal (per instructions — usually a hammer + screwdriver to punch out the plastic plug).

Attach the dishwasher discharge tube to this inlet with a hose clamp.

Modify drain plumbing

The disposal has a drain outlet on its side. Connect this to the sink drain plumbing using a T-fitting and slip-joint connectors.

If you have a double-bowl sink, the disposal connects to one bowl's drain; the other bowl drains into the same T-fitting at a different angle.

Reconnect the P-trap to the new T-fitting.

Restore water and power, test

Turn on the breaker. Run the disposal — should spin freely with no grinding noise.

Run water and operate the disposal for 30 seconds. Check all connections for leaks.

Drop a small amount of food (peel from a vegetable) into the disposal to verify grinding action.

Common mistakes that cost you

Frequently asked questions

Are garbage disposals allowed in Ottawa?

Generally yes, but specific bylaws vary. Verify with City of Ottawa or your local plumbing inspector before installing.

Some condo buildings restrict or prohibit disposals. Check building rules if applicable.

What can't I put down a disposal?

Avoid: bones (especially large/cooked), fibrous vegetables (celery, corn husks), grease, pasta and rice (expand and clog), coffee grounds in large quantities.

Disposals are designed for soft food scraps. Following these rules extends life significantly.

What HP rating do I need?

1/2 HP for typical 2-3 person household. 3/4-1 HP for families of 4+ or frequent cooking households.

Higher HP is quieter (less torque required to grind), grinds faster, and jams less frequently.

When to call us instead

If you're adding a disposal where one didn't previously exist, the plumbing modifications and electrical work may require permits. We do this as part of kitchen renovations.

Book a free 60-minute site visit →

Related Ottawa services

If you're updating kitchen plumbing and appliances, our kitchen renovation team handles appliance installation as part of fixed-price scopes. Book a free 60-minute consultation.