Kitchen renovation before and after in Ottawa by Dream Touch Renovations
Kitchen Renovation · Design · Cabinetry · Ottawa

Ottawa kitchen renovations.
Designed free. Built to last.

Complete kitchen renovations in Ottawa, including custom cabinetry, layout design, permits, and installation by one team. Free design consultation. Fixed-price contract. 1-year workmanship warranty.

Call 613-862-4555
Free
Kitchen design consultation
5+25 yrs
Workmanship + manufacturer warranty
0%
Off countertops, year-round
0+
Ottawa kitchens delivered
Free kitchen design
No deposit required.
15% off countertops
Every order, year-round.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa partners.
What sets Dream Touch apart

What makes a Dream Touch kitchen

Layout & Function

Every Ottawa kitchen starts with how you actually live. Our designers plan traffic flow, work triangles, prep zones, and storage around your routine, not a catalog template. Structural walls, appliance clearances, and building code worked out before anything gets ordered.

  • Work-triangle optimization
  • Traffic-flow planning
  • Structural review
  • Appliance specs & clearances

Craftsmanship & Value

In-house cabinetry built to your exact specs, not flat-pack, not outsourced. We source countertops through direct Ottawa quartz and granite partners, and every finish, pull, and hinge is specified to last. Premium materials at fair market prices because we buy direct.

  • In-house custom cabinetry
  • Direct-source countertops
  • Premium hardware
  • Written fixed price

Aesthetic & Style

Design that looks like your home, not an Instagram feed. Our designers help you land finishes, colour stories, and cabinet styles that feel intentional and age well. Ottawa winters, bright summers, hard water: we specify for how materials actually perform here.

  • Colour & finish selection
  • Hardware & fixture specs
  • Lighting design
  • Tile & backsplash planning
Every Ottawa layout

Designed for your space.

From compact galley kitchens in Glebe rowhomes to sprawling open-concept layouts in Kanata, we design for Ottawa's full range of housing stock.

Galley kitchen renovation on O'Connor St, Ottawa by Dream Touch Renovations

Galley

Parallel runs, perfect for narrow floor plans and row homes. Maximizes counter without sacrificing flow.

L-shaped kitchen renovation in the Glebe, Ottawa by Dream Touch Renovations

L-Shaped

Two-wall corner layout ideal for open-concept living. Leaves room for a dining zone or small island.

U-shaped kitchen renovation in Osgoode, Ottawa by Dream Touch Renovations

U-Shaped

Three-wall configuration that delivers maximum storage and counter area. Great for serious cooks.

Double-island open-concept kitchen renovation in Dunrobin, Ottawa by Dream Touch Renovations

Island Kitchens

A central workstation that anchors the room. Seating, prep, storage, and sometimes a full second sink.

Open-concept kitchen renovation on Innes Rd, Ottawa by Dream Touch Renovations

Open-Concept

Wall removal + structural work to merge kitchen, living, and dining. Most common Ottawa renovation request.

Peninsula kitchen renovation in Kars, Ottawa by Dream Touch Renovations

Peninsula

The "half-island" connects to existing cabinetry but creates a visual and functional divider.

Real projects

Recent Ottawa kitchens

View Full Portfolio →
Carlsbad Springs kitchen renovation Ottawa
Carlsbad Springs · 2024
Carlsbad Springs · 2024

The Carlsbad Kitchen

  • White quartz countertops
  • White shaker galley kitchen
  • Stainless French-door refrigerator
Galley refresh · ~4 weeks on site
Manotick kitchen renovation Ottawa
Manotick · 2024
Manotick · 2024

The Manotick Kitchen

  • Backlit onyx waterfall island
  • Glowing onyx slab backsplash
  • Floor-to-ceiling black cabinetry
Full custom renovation · ~6–8 weeks on site
Barrhaven kitchen renovation Ottawa
Barrhaven · 2024
Barrhaven · 2024

The Barrhaven Kitchen

  • White quartz island with seating
  • L-shaped oak shaker cabinetry
  • Black slimline range hood
Full renovation · ~5–6 weeks on site
Glebe open-concept kitchen Ottawa
The Glebe · 2023
The Glebe · 2023

The Glebe Open-Concept

  • Slate-blue shaker island, white perimeter
  • Large lantern-cage pendant lights
  • Thick white island countertop
Open-concept conversion · ~7–9 weeks on site
Westboro kitchen renovation Ottawa
Westboro · 2024
Westboro · 2024

The Westboro Kitchen

  • L-shaped white kitchen with island
  • White marble-look island countertop
  • Stainless steel chimney range hood
Full renovation · ~5–6 weeks on site
Orleans kitchen renovation Ottawa
Orleans · 2025
Orleans · 2025

The Orleans Kitchen

  • Large quartz-top island
  • Two-tone grey & wood cabinets
  • Slab-front flat-panel cabinetry
Full renovation · ~5–7 weeks on site
Greely secondary kitchen Ottawa
Greely · 2024
Greely · 2024

The Greely Kitchen

  • Espresso flat-slab handleless cabinets
  • Large white-quartz-top island
  • Five black chrome-base bar stools
Full custom renovation · ~6–7 weeks on site
Kanata in-law suite kitchen Ottawa
Kanata · 2024
Kanata · 2024

The Kanata Kitchen

  • Waterfall-edge stone peninsula
  • High-gloss white slab cabinets
  • Cluster of black cone pendants
In-law suite kitchen · ~4–5 weeks on site
Rockcliffe Park kitchen renovation Ottawa
Rockcliffe · 2023
Rockcliffe · 2023

The St-Remy Kitchen

  • Two-tone white and wood cabinetry
  • Glossy handleless white uppers
  • Flat-slab natural wood lowers
Full custom renovation · ~6–8 weeks on site
Every scope. Every detail.

From cabinet refacing to full gut renovations.

🗄️

Cabinet Replacement & Refacing

Custom-built replacements or budget-friendly refacing. Real wood, soft-close hardware, lifetime hinges.

🪨

Countertop Installation

Quartz, granite, marble, and butcher block. 15% off all orders, year-round, every thickness and edge profile.

🏠

Flooring Replacement

Engineered hardwood, large-format tile, luxury vinyl plank. Proper underlayment and level-up as standard.

🧱

Backsplash Installation

Subway, mosaic, slab, full-height, with proper waterproofing behind every sink and range.

💡

Lighting Design & Install

Layered pot lights, pendants, under-cabinet strips, dimmable zones, and accent lighting planned with your electrician.

🚰

Sink & Faucet Upgrades

Single bowl, double bowl, farmhouse, workstation. Pull-down, pot-filler, touchless, from Kohler, Grohe, Delta, Blanco, Moen.

🏝️

Island Installation & Expansion

Fixed or extension, with or without seating, with or without prep sink. Structural review included.

🔨

Wall Removal & Open-Concept

Structural engineering, permit management, LVL beam specification, finished integration with existing ceiling and floor.

📦

Custom Storage Solutions

Built-ins, walk-in pantries, appliance garages, lazy Susans, tray dividers, pull-out drawers, and full-wall storage.

Transparent pricing

What does an Ottawa kitchen renovation cost?

Fixed-price contracts signed before demolition, with a detailed written breakdown so you know exactly what is included. Your final pricing depends on finishes, layout changes, cabinetry, and overall scope.

Refresh
Same footprint, new kitchen.
  • Cabinet refacing or stock replacement
  • New countertops (quartz standard)
  • New backsplash
  • New sink + faucet
  • Luxury vinyl plank or tile floor
  • Layered pot lighting
  • Paint, trim, baseboards
  • 1-year workmanship warranty
Open-Concept Layout
Wall removal. Total redesign.
  • Load-bearing wall removal + LVL
  • Structural engineering & permits
  • Complete open-concept layout
  • Large custom island
  • Full-height custom cabinetry
  • Integrated panel-ready appliances
  • New flooring throughout kitchen + living
  • 10-year structural warranty
The Process

From free design to first meal.

Step 1
Free Design
1–2 weeks · Included
Step 2
Quote & Contract
3–5 days
Step 3
Permits & Ordering
2–4 weeks
Step 4
Build
4–8 weeks
Step 5
Handover
Day of keys
Choosing your cabinets

Stock, semi-custom, or fully custom cabinetry?

Cabinets set the look, the fit, and the lifespan of your kitchen. Here is an honest comparison of the three routes we build with — pros and cons only — so you can decide what suits your home and your timeline.

Entry level

Stock & flat-pack

Pre-sized boxes from a catalogue — think IKEA and big-box lines — assembled on site. The fastest, most budget-friendly route.

Pros
  • Shortest lead time, often in stock
  • Lowest material outlay
  • Predictable, consistent finishes
  • Easy to swap a damaged door later
Cons
  • Fixed sizes leave filler gaps and dead corners
  • Limited door styles, colours, and depths
  • Thinner boxes and backs wear faster
  • Rarely fits older, out-of-square Ottawa homes
Best for rentals, secondary suites, and tight-budget refreshes where speed matters more than a perfect fit.
Middle ground

Semi-custom

Factory lines that let you modify sizes, finishes, and interior fittings within set options. A balance of choice and lead time.

Pros
  • Wide range of door styles and colours
  • Modified widths reduce filler gaps
  • Sturdier boxes than flat-pack, often plywood
  • Soft-close hardware standard on most lines
Cons
  • Built to set increments, not exact millimetres
  • Longer lead time than in-stock boxes
  • Choices limited to the manufacturer's menu
  • Special finishes add weeks to delivery
Best for mid-range full renovations where you want real choice without a fully bespoke build.
20 years of Ottawa kitchens has taught us this

The most expensive mistakes Ottawa homeowners make with kitchen renovations.

These are the mistakes we see most often when we are called in to fix someone else's kitchen. Avoid them and your kitchen will look and work beautifully for decades.

  1. 1

    Ordering cabinets before the layout is finalized.

    Cabinets get ordered off a rough sketch, then the fridge does not clear the island or a drawer collides with the oven door. Reordering a custom run means weeks of dead time and a second delivery.

    Dream Touch fixWe finalize the full layout — appliance clearances, work triangle, and door swings — and you approve it before a single cabinet is ordered.
  2. 2

    Skipping the structural check before removing a wall.

    That wall between the kitchen and living room looks non-structural, until demo reveals it is carrying the floor above. Now the project stops for engineering, a beam, and a permit no one budgeted for.

    Dream Touch fixOur team confirms what is load-bearing at the design stage. Structural engineering and permits for any wall removal are written into the contract up front.
  3. 3

    Under-planning electrical for a modern kitchen.

    Older Ottawa homes were wired for one small appliance at a time. Add an induction range, a microwave drawer, and under-cabinet lighting and you trip breakers or fail inspection.

    Dream Touch fixWe assess your panel and circuits during design and price any electrical upgrades into the fixed quote — no mid-project surprises.
  4. 4

    Choosing countertops and finishes for the photo, not the wear.

    Soft marble stains, high-gloss slab shows every fingerprint, and trendy grout lines yellow fast. Selection errors mean living with it or paying to redo it.

    Dream Touch fixWe walk you through how each material actually performs with Ottawa hard water and daily family use, so you specify what lasts, not just what photographs.
  5. 5

    Letting the range hood vent into the attic — or nowhere.

    A hood that recirculates or dumps into the attic leaves grease, moisture, and cooking odours in the house — and moisture in an Ottawa attic means mould and frost.

    Dream Touch fixWe spec a properly sized hood ducted to the exterior, with make-up air where the building code requires it.
  6. 6

    Hiring the cheapest quote without asking what is excluded.

    A low number usually means allowances that will not cover real material choices, or extras like plumbing relocation and disposal billed later. The final total lands well above the quote.

    Dream Touch fixYou get a detailed, line-item fixed-price contract before demolition. What you sign is what you pay, barring changes you request in writing.
  7. 7

    Starting demolition before the materials arrive.

    Cabinet, counter, and tile lead times in Ottawa run weeks. Tear the old kitchen out too early and your family lives around a construction site while everyone waits on a delivery truck.

    Dream Touch fixWe do not start demo until your cabinetry, counters, and finishes are in hand, so the build runs straight through without stalls.
Trusted Partners

Built with brands we stand behind.

Kohler
Grohe
Delta
American Standard
TOTO
Blanco
Moen
Pfister
Fleurco
Ottawa clients
"

Moe and the team did a fantastic job on our home. They renovated our kitchen with beautiful custom cabinetry, added crown moulding throughout, and upgraded every pot light. The craftsmanship in the cabinetry and hood vent is excellent. The crew was pleasant, polite, and clean throughout. I would hire Dream Touch Renovations again.

Saralyn Hodgkin, Ottawa homeowner · Custom kitchen + whole-home renovation

View more testimonials →
Questions

Kitchen questions, answered.

Everything you need to know about kitchen renovation costs, timelines, and process in Ottawa. Still have questions? Call us directly. No scripts, no runaround.

Talk to a kitchen designer

Free 15-minute call. No obligation.

Call 613-862-4555
Kitchen renovation pricing in Ottawa is driven by scope and finish level. A refresh keeps the existing footprint with new cabinetry or refacing, counters, and flooring. A full custom renovation adds in-house cabinetry and premium finishes. Open-concept transformations involve wall removal and structural work. Final pricing depends on layout changes, cabinetry, material selections, appliance scope, and site conditions. You receive a detailed written breakdown and a fixed-price contract before work begins.
Most Ottawa kitchens are under construction for 4–8 weeks after permits and materials arrive. Total project from design start to handover is typically 10–16 weeks. Timeline is written into your contract before demolition, and we hold a strong on-time track record across two decades of projects.
Yes, completely. Our in-house designers will come to your home, measure, walk you through layout options, finishes, and cabinet styles, and deliver a design concept before you sign anything. No deposit. No obligation.
Yes. We install a temporary kitchen setup, typically in your dining room or basement, with your fridge, microwave, coffee, and a washing-up station. Dust containment is set up at the kitchen entry and we schedule noisy work during business hours.
Both. Our Tier 1 Refresh uses premium stock cabinetry when budget matters. Tiers 2 and 3 use in-house custom cabinetry built to your exact specifications. Every dimension, every material, every hardware decision is yours. Our cabinet shop is local to Ottawa, so there's no overseas lead time.
1-year DTR workmanship warranty on installation. Up to 25-year manufacturer warranty on hardware, cabinetry, and appliances. 10-year structural warranty on tier 3 (open-concept) projects. Full warranty details are in every signed contract.
Yes, every permit required, managed end-to-end. Most kitchen refreshes don't require permits, but full renovations involving electrical, plumbing, or gas relocation do, and any structural work (wall removal) requires a building permit + engineering. We handle all filings, inspections, and sign-offs.
Every Ottawa neighbourhood

Kitchen renovation contractor serving Ottawa and the National Capital Region.

Dream Touch builds kitchens across every Ottawa neighbourhood. We serve Kanata, Barrhaven, Orléans, Nepean, Stittsville, Manotick and the wider National Capital Region — from compact galley kitchens in Glebe and Hintonburg rowhomes to open-concept islands in newer Kanata and Riverside South builds. Older homes and new builds call for different plumbing, wiring, and structural work, and our team knows both.

Alta Vista Barrhaven Bells Corners Carlsbad Springs Carp Centretown Dunrobin Findlay Creek The Glebe Gloucester Greely Hintonburg Kanata Manor Park Manotick Nepean Orléans Riverside South Rockcliffe Sandy Hill Stittsville Westboro

Don't see your neighbourhood? We build kitchens across the National Capital Region. Call 613-862-4555.

Free kitchen design.
No deposit. No obligation.

Tell us about your kitchen and what you're hoping to achieve. We'll schedule a free in-home consultation, measure, and deliver a design concept with transparent pricing, before you commit to anything.

100s
Kitchens
4.7★
Google
20 yrs
Est. 2005
A+
BBB

Book My Free Kitchen Design

Response within 2 hours · Mon–Fri 8am–5pm · Sat 9am–3pm

No sales pressure. Ever.