← All How-To articles
← All How-To articles
Advanced DIY · Electrical · Heating

How to Install Radiant Floor Heating

Working on residential electrical is legal in Ontario for the homeowner of a single-family residence, but only if you pull a permit and have ESA inspect. Skip that and your insurance is…

Advanced 1-2 days install + electrical + tiling

Electric radiant floor heating warms tile floors from below — a luxury upgrade in bathrooms and kitchens. The system: thin heating cable embedded in thinset under tile, connected to a thermostat with a temperature sensor in the floor. Done right, the floor warms to a comfortable 80-85°F. Done wrong, hot spots, cold spots, or system failures result.

This guide covers an electric radiant heat mat (pre-fabricated mesh with cable woven in) under tile — the most common DIY-friendly installation. Hydronic (water-based) radiant requires plumbing skills and is typically professional install.

Before you start

Three things to settle:

1. Match mat size to room. Mats come in standard sizes (3×5, 3×8, 3×10 ft, etc.). Calculate net floor area MINUS cabinets, vanities, fixtures (heating cable can't go under permanent fixtures). Order mat to fit the heating area, with some clearance from walls (typically 3 inches).

2. GFCI/AFCI breaker required. Building Code requires a GFCI breaker (Class A 5 mA) for radiant floor heat. Some areas require AFCI as well. The thermostat may have built-in GFCI; if so, dedicated GFCI in panel may not be required. Verify with your installer or electrician.

3. Permit required for electrical work. In Ontario, ESA permit needed for new circuits, even for one new dedicated circuit. ESA inspector verifies wiring meets code. Hire licensed electrician for the panel-side work; mat install is DIY-friendly.

What you'll need

Tools

  • Multimeter (to test mat continuity)
  • Trowel (notched, 1/4 inch)
  • Mixing paddle and bucket
  • Drill with bits
  • Wire strippers
  • Tape measure

Materials

  • Electric radiant heat mat (Schluter DITRA-HEAT, Warmly Yours, Suntouch)
  • Thermostat with floor sensor
  • Modified thinset (matched to mat manufacturer)
  • 12-2 wire (for mat to thermostat) — gauge per electrician
  • GFCI breaker (or thermostat with built-in GFCI)
  • Cable connectors and wire nuts
  • Tile (for finish)
  • Adhesive thinset (for tile over mat)

Test mat continuity at every step

Test mat resistance with multimeter:

1. Before installing (verify out-of-box).

2. After laying out and embedding in thinset.

3. After tile is set.

4. After grout cures.

Catching a damaged cable early lets you replace before the floor is sealed; finding it after tile is set means tearing up the floor.

Step-by-step instructions

Calculate heating area and order mat

Measure room minus permanent fixtures (toilet, vanity, tub).

Match mat sizes to area — sometimes 2 mats needed.

Mats are sized in square feet; verify total wattage matches breaker capacity (typically 12 W/sq ft).

Order matched thermostat with floor sensor.

Test new mat resistance (out of box)

Multimeter on resistance setting.

Touch probes to mat's lead wires (the two wires that exit the mat).

Reading should match manufacturer's spec (typically 100-300 ohms).

Within ±10% of spec is OK. If outside, contact manufacturer — defective mat.

Plan layout on the floor

Lay mat on floor without thinset, position to fit area.

Mat has woven heating cable in mesh — orient mat with cable runs going where heating is needed.

Cable can't be cut. To turn corners, flip mat (cut mesh only, not cable) and continue.

Don't overlap cables; leave 3 inches from walls.

Locate floor sensor

Floor sensor must be in the heated area, between heating cables (not on top of cable).

Insert sensor in a tube (saves it from being damaged in thinset and lets it be replaceable).

Run sensor wire to thermostat location (in conduit or with wire protection).

Run lead wire to thermostat box

Mat has 2 lead wires (insulated heavy wires going to the power supply).

Run lead wires to thermostat box location (typically wall switch height nearby).

Use wire raceway or run inside wall.

Don't cut these wires shorter than needed.

Apply thinset and embed mat

Mix modified thinset to creamy consistency.

Trowel thinset on subfloor.

Lay mat in thinset; press down to embed cables in thinset.

Cable should be fully covered by thinset.

Test resistance again — within ±10%.

Wait for thinset to cure

First thinset cures 24 hours.

Don't tile yet — too quick risks cracking the cable.

Test resistance during cure as a check.

Tile over the mat

Apply tile thinset over the mat.

Tile per normal installation procedure.

Don't drive screws or staples through the mat — damages cable.

Test resistance after tile is set.

Have electrician connect to panel

Lead wires to thermostat: connected per manufacturer.

Thermostat to panel: dedicated circuit with GFCI (or thermostat with built-in GFCI on standard breaker).

Floor sensor wire to thermostat.

Final connections by licensed electrician with ESA permit and inspection.

Test system after grout cure

Wait for grout to cure (24-72 hours).

Set thermostat to 80°F. Verify floor warms within 30-60 minutes.

Walk on floor — should feel warm to touch.

If no heat: check thermostat, breaker, GFCI.

Common mistakes that cost you

Frequently asked questions

Will radiant floor heat my whole bathroom?

Yes for typical bathroom — supplements main heating system.

Won't replace primary heating; adds floor warmth.

Running cost depends on floor area, how often you run it, your thermostat schedule, and local hydro rates.

Is electric radiant floor expensive to run?

Running it intermittently (warm floor only when in use) costs far less than continuous operation.

Continuous use draws more, scaling with floor area and run-time.

Use programmable thermostat to limit on-times.

Hydronic systems: lower running cost but high install cost.

Can I install under hardwood or LVP?

Standard mats: tile, stone, ceramic only.

Special low-temp mats: can work under engineered hardwood (verify with manufacturer).

LVP: typically too low max temperature for safe heating cable.

Tile is the standard application.

When to call us instead

Radiant floor heating is part of premium bathroom renovations. We integrate radiant systems with tile, plumbing, and electrical.

Book a free 60-minute site visit →

Related Ottawa services

If you're considering radiant floor heat, our bathroom renovation team handles the install. Book a free 60-minute consultation.