← All How-To articles
← All How-To articles
Advanced DIY · Roofing

How to Install Roof Flashing

Exterior work fails in Ottawa winters when water gets behind something it shouldn't. The detail that matters is flashing: where every horizontal meets every vertical, water has to be…

Advanced 1-2 days for typical roof

Roof flashing is the thin metal (or rubber) material that seals the joints where shingles meet other surfaces — chimneys, walls, valleys, and skylights. Done well, flashing keeps water out for decades. Done poorly, water enters at every joint and rots structure. Most roof leaks trace to bad flashing.

This guide covers the typical flashing locations on residential roofs: step flashing at walls, chimney flashing, valley flashing, vent pipe flashing.

Before you start

Three things to settle:

1. Flashing material matters. Aluminum: most common, durable, paintable. Galvanized steel: cheaper, rusts over years. Copper: premium, lasts 80+ years, expensive. Lead-coated copper: traditional, premium. Match flashing to roof life expectancy.

2. Step flashing on walls (not continuous). At wall-to-roof intersections (e.g., where a wall meets a sloped roof), use step flashing — individual L-shaped pieces, one per shingle course. Never use a long continuous strip — water gets behind, rots wall, leaks roof.

3. Permits often not required for flashing only. Like-for-like flashing replacement: typically no permit. New construction or major changes: roof permit required. Verify with municipality.

What you'll need

Tools

  • Tin snips (for cutting flashing)
  • Hammer or roofing nailer
  • Pry bar (for lifting old flashing)
  • Caulk gun
  • Utility knife
  • Tape measure

Materials

  • Step flashing pieces (L-shaped, ~5×7 inches typical) — for walls
  • Roll flashing (continuous strip) — for chimneys, valleys
  • Vent pipe flashing (for plumbing vents)
  • Aluminum flashing rolls (10-12 inch wide × 50 ft)
  • Roofing cement (Henry 208 or similar)
  • Roofing nails (1.5 inch typical)
  • Underlayment (felt or synthetic)

Flashing layered with shingles, not on top

Each piece of step flashing tucks UNDER the shingle course above it.

Water that hits flashing flows down and out under the shingles below.

Flashing on top of shingles: water gets behind, leaks.

Step-by-step instructions

Identify all flashing locations on roof

Wall-to-roof intersections (gable ends meeting walls).

Chimney perimeter.

Valleys (where two roof slopes meet).

Vent pipes (plumbing vent stacks).

Skylights.

Each location requires specific flashing technique.

Step flashing at walls

Step flashing pieces L-shaped, ~5×7 inches.

First piece: at bottom of wall-roof intersection. One leg under first shingle course; other leg up wall, under siding (or kick-out flashing at bottom).

Each subsequent shingle course: another piece of step flashing, overlapping previous by 2 inches, under that course.

Continue all the way up the wall.

Wall caps over step flashing

Top edge of step flashing (against wall): siding tucks over flashing.

If siding is rigid (brick, stucco): flashing's top edge tucks behind a moisture barrier in the wall.

Caulk top edge of flashing to wall — water can't enter wall.

Chimney flashing

Front of chimney (downhill side): apron flashing, large piece tucked under shingles below, over chimney face above.

Sides of chimney: step flashing.

Back of chimney (uphill side): cricket or saddle flashing — diverts water around chimney.

Top of all chimney flashing: counter-flashing tucks INTO chimney mortar joints, sealed with mortar repair caulk.

Valley flashing

Valley = where two roof slopes meet.

Open valley: continuous metal flashing, exposed.

Closed valley: shingles weave across, no exposed flashing.

Closed-cut valley: shingles come over, then trimmed back exposing some flashing.

Apply per chosen design.

Vent pipe flashing

Pre-formed boot for plumbing vent pipes.

Boot fits over pipe.

Flange tucks under shingles above pipe.

Sealed with roofing cement around pipe.

Skylight flashing

Skylight kits include specific flashing pieces.

Step flashing on sides.

Apron at front (downhill side), saddle at back (uphill side).

Per skylight manufacturer's instructions.

Caulk and seal exposed edges

Roofing cement (Henry 208) at exposed flashing edges.

All places where flashing meets wall, chimney, or other surface.

Don't over-apply — too much cement looks unprofessional and isn't more effective.

Verify all joints are watertight

Walk along roof; verify no gaps in flashing.

Check after a heavy rain — no leaks evident in attic.

Roof inspection by professional if uncertain.

Common mistakes that cost you

Frequently asked questions

How long does flashing last?

Aluminum: 30-50 years.

Galvanized steel: 15-25 years.

Copper: 70-100+ years.

Match flashing life to roof shingle life (typical asphalt: 25-30 years).

Can I install flashing without removing shingles?

Repair specific flashing leaks: yes, often by tucking new flashing under existing shingles.

Major flashing replacement: easier with shingles removed (often combined with re-roof).

Patch leaks immediately to prevent further water damage.

Can flashing be repainted?

Aluminum: paintable with rust-resistant primer + paint.

Galvanized: paintable.

Copper: develops natural patina; usually unpainted.

Match colour to fascia or trim for clean appearance.

When to call us instead

Roof flashing is critical to weather-tightness. Our team handles roofing repair and replacement as part of exterior renovations.

Book a free 60-minute site visit →

Related Ottawa services

If your renovation includes roofing or exterior work, our team coordinates the full scope. Book a free 60-minute consultation.