← All articles
How-To Guide

How to Prepare Your Home
for a Renovation

Dec 25, 2025 · 7 min read · By Dream Touch Renovations Ottawa

How to Prepare Your Home for a Renovation (Ottawa Guide)
← All articles

The morning demo starts on a kitchen in Hintonburg, my crew shows up at 7:30. The homeowner is still in pyjamas, the dog is barking behind a baby gate, the cookbooks are still on top of the cabinets, and the kids are upstairs trying to get ready for school.

Two hours later we are working on a stress problem instead of a kitchen problem.

The week before demo is the most underrated week of any renovation. Done right, it makes the next eight weeks bearable. Done wrong, it sets a tone the project never recovers from. Here is the prep list I send every Ottawa client at the contract signing, in the order it gets done.

1. Dust Containment Plan (Two Weeks Out)

Renovation dust is not regular dust. It is fine drywall powder, sanding residue, plaster particles, and on older Ottawa homes (anything pre-1980) sometimes vermiculite or lead paint debris. It travels through HVAC returns, crawls under door sweeps, and settles on every horizontal surface in your house if you let it.

What good containment looks like:

If your contractor's "containment plan" is a bedsheet duct-taped to a doorframe, find a different contractor. Real containment takes proper materials and an hour of setup. It is not optional.

2. Route Protection (One Week Out)

Map the path your crew will walk every day from the front door to the work zone. That route is going to take 60-80 trips a day for two months. Every one of those trips is a chance to scuff your hardwood, ding your baseboard, or scratch the stair stringer.

What gets protected:

The crews that protect well are the crews that take pride in the finish. Watch how they prep on day one and you will know what your trim work is going to look like in week ten.

3. Utilities Mapping (One Week Out)

Walk your home with the contractor and confirm everyone knows where the following live:

  1. Main water shutoff. Usually beside the meter in the basement. Test it. On older Ottawa homes the valve can seize and you find out at the worst possible moment.
  2. Individual fixture shutoffs. Under every sink, behind every toilet. Test those too.
  3. Main electrical panel. Label every breaker before demo. The crew should not be guessing which one kills the kitchen.
  4. Gas shutoff. At the meter outside, plus the appliance shutoff at the range and water heater.
  5. HVAC zone valves. If you have a forced-air system with multiple zones.

If something is buried, mislabeled, or seized, fix it before demo. You do not want a plumber chasing a leak through a finished basement at 4 PM on a Friday.

4. HVAC Return Shutoff (Day-Before)

Single most overlooked prep step: turn off the HVAC return in the work zone and tape the cold-air return grille closed. Cover the supply too if it is going to stay open during demo.

If the furnace runs during demo with an open return in the work zone, the system pulls dust through every duct in the house and deposits it in every other room. Two days of that and you are paying for a full duct cleaning before the project is even framed.

Replace the furnace filter before the project starts and again the week after substantial completion. A MERV 11 minimum is fine. Do not run a HEPA filter in a forced-air system unless it was sized for one, you can starve the blower.

Pro tip

Buy two extra furnace filters before the project starts. One for mid-project (if you live with the system running on a partial reno), one for the day after final cleanup. They are a few dollars each at any Home Hardware. Cheaper than a duct cleaning.

5. The Pet and Kid Plan (Three Days Out)

Dogs do not understand contractors. The crew arrives, the dog loses its mind for a week, and then it is exhausted and depressed for the rest of the project. Same on a smaller scale with cats and kids under five.

Real options for an Ottawa renovation:

6. Alternate Cooking and Laundry Plan (One Week Out)

If your kitchen is the project, you need a plan for breakfast, lunch, and dinner for 6-9 weeks. If your laundry is in the project zone, you need a plan for clothes too.

What works for Ottawa families:

7. Valuables and Sentimental Items (Three Days Out)

Anything irreplaceable comes off the work-zone walls and out of cabinets in the work zone, and goes into a sealed bin in a room you can lock or close. Not because crews steal (mine do not, and yours should not), but because dust, vibration, and the occasional bumped ladder do not care about value.

Specifically:

One more thing: photograph every wall, ceiling, and finish in the rooms next to the work zone before demo starts. If something cracks, scuffs, or chips during the project, the photo settles the conversation in 30 seconds.

Pro tip

Walk your house with the lead carpenter the day before demo. Open every cabinet. Point at every framed photo. Identify the one or two things that must not get touched under any circumstance. A 15-minute walk-through saves a 15-minute argument later.

The Short Version

Two weeks of prep saves eight weeks of pain. Containment, route protection, utilities mapping, HVAC shutoff, pet plan, kid plan, kitchen and laundry plan, valuables relocated, photos taken. Nine items. None of them cost much. All of them pay back ten times over.

The Ottawa homeowners who get this right are the ones who treat the prep week like part of the project, not a chore before it. They show up to demo day calm. The ones who skip it spend the first month of the renovation in panic mode.

Our crews walk every client through this list at contract signing, and we do a final prep walkthrough the day before demo starts. If you want to see how a real Ottawa home renovation kicks off the right way, that is part of how we work.

Frequently asked questions

What does proper dust containment look like during a renovation?

Proper renovation dust containment uses 6-mil poly walls from floor to ceiling around the work zone, taped with low-tack tape, ZipWall poles across openings without doors, a HEPA negative air machine venting out a window, tacky mats at every threshold, and covered HVAC returns in the work zone.

Renovation dust is fine drywall powder, sanding residue and plaster, and in pre-1980 Ottawa homes can include vermiculite or lead paint debris. A bedsheet taped to a doorframe is not containment.

Should I turn off the furnace return during a renovation?

Turn off the HVAC return in the work zone and tape the cold-air return grille closed the day before demo, and cover the supply too if it stays open. A furnace running with an open return in the work zone pulls dust through every duct and deposits it in every other room, and two days of that can mean a full duct cleaning.

Replace the furnace filter before the project and again after completion, using MERV 11 as a minimum.

How should floors and stairs be protected during a renovation?

The crew route from the front door to the work zone sees 60 to 80 trips a day, so protect it before demo. Cover hardwood with Ram Board taped at the seams, not plastic, which traps moisture and can mark hardwood within a week.

Use Masonite or 1/8 inch ply over tile, because Ram Board alone shows tool-cart wheel marks. Stairs get runners or Ram Board with anti-slip tape, baseboards get cardboard wrap, and door casings get foam corner protectors.

How do I set up a temporary kitchen during a kitchen renovation?

A kitchen renovation means 6 to 9 weeks without a kitchen, so set up a temporary one in the dining room or a corner of the basement rec room. A folding table, microwave, kettle, toaster oven, mini-fridge and single induction burner cover most meals.

Pack a tote with 4 plates, 4 bowls, 4 glasses, 4 sets of cutlery, 2 pots and 1 pan. Plan dishwashing around a kettle and a drainer over a tote, and set a realistic weekly takeout budget.

What utilities should I locate before renovation demolition starts?

Before renovation demolition, walk the house with the contractor and confirm the location of the main water shutoff, every fixture shutoff, the main electrical panel, the gas shutoff at the meter and at each appliance, and any HVAC zone valves.

Test the main water valve, since on older Ottawa homes it can seize. Label every breaker so the crew is not guessing which one kills the kitchen. Fix anything buried, mislabelled or seized before demo starts.

Official references

Ready to start your project right?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →