How to plan a kitchen renovation in Ottawa
A step-by-step walkthrough of scope, priorities, and sequencing before you start.
Read the guide →Complete kitchen renovations in Ottawa, with custom cabinetry, layout design, permits and installation handled by one team. You get a free design consultation, a fixed-price contract and a 1-year workmanship warranty.
Every Ottawa kitchen we design starts with how you use the room. Our designers plan traffic flow, work triangles, prep zones and storage around your routine, and settle structural walls, appliance clearances and building code before anything is ordered.
We build cabinetry in-house to your exact specs. Countertops come direct from Ottawa quartz and granite partners, and we specify every finish, pull and hinge to last. Buying direct keeps premium materials at fair market prices.
Our designers help you choose finishes, colours and cabinet styles that suit your home and age well. We specify materials for how they hold up here, through Ottawa winters, bright summers and hard water.
From compact galley kitchens in Glebe rowhomes to sprawling open-concept layouts in Kanata, we design for Ottawa's full range of housing stock.
Parallel runs suited to narrow floor plans and row homes, with plenty of counter and a clear path through.
Two-wall corner layout ideal for open-concept living. Leaves room for a dining zone or small island.
Three walls of cabinets for the most storage and counter area. A good fit if you cook a lot.
A central workstation with seating, prep space, storage and sometimes a full second sink.
Wall removal + structural work to merge kitchen, living, and dining. Most common Ottawa renovation request.
A "half-island" that connects to existing cabinetry and divides the kitchen from the next room.
Custom-built replacements or budget-friendly refacing. Real wood, soft-close hardware, lifetime hinges.
Quartz, granite, marble, and butcher block. 15% off all orders, year-round, every thickness and edge profile.
Engineered hardwood, large-format tile, luxury vinyl plank. Proper underlayment and level-up as standard.
Subway, mosaic, slab, full-height, with proper waterproofing behind every sink and range.
Layered pot lights, pendants, under-cabinet strips, dimmable zones, and accent lighting planned with your electrician.
Single bowl, double bowl, farmhouse, workstation. Pull-down, pot-filler, touchless, from Kohler, Grohe, Delta, Blanco, Moen.
Fixed or extension, with or without seating, with or without prep sink. Structural review included.
Structural engineering, permit management, LVL beam specification, finished integration with existing ceiling and floor.
Built-ins, walk-in pantries, appliance garages, lazy Susans, tray dividers, pull-out drawers, and full-wall storage.
Fixed-price contracts signed before demolition, with a detailed written breakdown so you know what is included. Your final pricing depends on finishes, layout changes, cabinetry, and overall scope.
This is the order a kitchen renovation follows in an Ottawa house, from the first measure to the final inspection. It describes the process in general. For two jobs written up start to finish, read our Westboro open-concept kitchen and Stittsville budget refresh.
The design visit starts in the basement. Joists that run at right angles to a kitchen wall and rest on it mean that wall carries the floor above, and the basement ceiling also shows where the plumbing stack and the ducts go up. Those two facts sort the layouts into cheap ones and ones that need a permit.
Closed kitchens cluster in Ottawa's postwar suburbs. Alta Vista's suburbs went up in the 1950s, when Faircrest Heights, Applewood Acres, Ridgemont and Elmvale Acres were built, and census counts show Nepean township growing from 3,744 people in 1951 to 64,606 in 1971.
Our own planning guide describes the original kitchen in Ottawa houses of 1955 to 1985 as a room of about 9 by 11 feet with one window over the sink.
The City of Ottawa lists "adding or removing walls" among the projects that need a building permit, and the application goes in online through My ServiceOttawa. The drawings show the new beam, the posts at each end and what those posts stand on, all the way down to the foundation. Dream Touch writes the structural engineering and the permit into the contract for any wall removal, before demolition starts.
Our Westboro write-up shows what that looks like in a 1948 semi. The joists ran at right angles to both walls that came out, an engineer specified a triple 1.75 by 11.875 inch LVL with a steel post hidden in a new column, and the permit took three weeks through My ServiceOttawa.
Kitchen outlets fall under Rule 26-722 of the Ontario Electrical Safety Code, and ESA Bulletin 26-23-7, issued May 2025, spells out how it applies. No point along the wall behind a counter may be more than 900 mm from a receptacle, and an island or peninsula with a continuous counter of at least 600 by 300 mm needs its own.
The fridge gets its own branch circuit. A microwave outlet or the general outlets on an open-concept wall need arc-fault protection under Rule 26-658.
What sits behind old plaster depends on the decade. The Electrical Safety Authority dates knob-and-tube wiring to homes of the early 1900s to the 1940s, which is Glebe and older Westboro housing, and aluminum wiring to houses built from the mid-1960s to the late 1970s, a span that overlaps Nepean's fastest growth: its census population more than tripled between 1961 and 1971.
We check the panel and the circuit count at the design visit, so any upgrade is in the fixed price.
Health Canada's cooking and indoor air quality factsheet recommends a range hood that fully extends over the burners, run on high: at 300 cubic feet per minute it can cut exposure to cooking pollutants by more than 80 per cent compared with slower speeds.
A national survey of 4,500 Canadian households, run in early 2020, found two thirds of range hoods vented outdoors, and just over half of the households with no cooktop ventilation at all lived in buildings from before 1960.
In a 1950s bungalow that usually means a new duct, either through an exterior wall or insulated through the attic to a roof cap. The duct route is settled before the cabinets are drawn, so it does not swallow an upper cabinet.
Cabinets are ordered from our Ottawa shop once you sign off the drawing, during the 2 to 4 weeks our process sets aside for permits and ordering. Appliance models are fixed first, because the fridge, range and hood widths set the box sizes. Stone counters come later: the fabricator templates the installed cabinet boxes and cuts the slab to that template, so a counter is never ordered off a drawing.
Our Stittsville write-up describes one saving at this stage: a 2 cm quartz slab with a 1 cm strip glued under the front edge, which reads as 3 cm at the edge for less material.
Our process gives the build 4 to 8 weeks once permits and materials are in hand. The order does not change with the length.
Week 1. Floor protection, dust walls, demolition, then shoring and the beam if a wall is coming out.
Week 2. Rough plumbing, new circuits and the hood duct, followed by the rough-in inspections the permits call for, before anything is closed up.
Week 3. Insulation and drywall where walls were opened, then flooring, run continuous where the old wall stood.
Week 4 onward. Cabinets, the counter template, counters, backsplash, fixtures and appliances, then the final inspections and a walk-through punch list.
Cabinets decide how your kitchen looks, fits and lasts. Below are the pros and cons of the three types we build with, so you can choose what suits your home and your timeline.
Pre-sized boxes from a catalogue (IKEA and big-box lines), assembled on site. The fastest and most budget-friendly route.
Factory lines that let you change sizes, finishes and interior fittings within set options. A middle ground on both choice and lead time.
Designed and built for your kitchen in our local Ottawa cabinet shop, with every dimension, material and detail chosen by you.
We see these mistakes most often when we are called in to fix someone else's kitchen.
Cabinets get ordered off a rough sketch, then the fridge does not clear the island or a drawer collides with the oven door. Reordering a custom run means weeks of dead time and a second delivery.
That wall between the kitchen and living room looks non-structural, until demo reveals it is carrying the floor above. Now the project stops for engineering, a beam, and a permit no one budgeted for.
Older Ottawa homes were wired for one small appliance at a time. Add an induction range, a microwave drawer, and under-cabinet lighting and you trip breakers or fail inspection.
Soft marble stains, high-gloss slab shows every fingerprint, and trendy grout lines yellow fast. Selection errors mean living with it or paying to redo it.
A hood that recirculates or dumps into the attic leaves grease, moisture, and cooking odours in the house, and moisture in an Ottawa attic leads to mould and frost.
A low number usually means allowances that will not cover real material choices, or extras like plumbing relocation and disposal billed later. The final total lands well above the quote.
Cabinet, counter, and tile lead times in Ottawa run weeks. Tear the old kitchen out too early and your family lives around a construction site while everyone waits on a delivery truck.









Moe and the team did a fantastic job on our home. They renovated our kitchen with beautiful custom cabinetry, added crown moulding throughout, and upgraded every pot light. The craftsmanship in the cabinetry and hood vent is excellent. The crew was pleasant, polite, and clean throughout. I would hire Dream Touch Renovations again.
Saralyn Hodgkin, Ottawa homeowner · Custom kitchen + whole-home renovation
Answers on kitchen renovation costs, timelines, and process in Ottawa. For anything else, call us directly.
Dream Touch builds kitchens across Ottawa. We serve Kanata, Barrhaven, Orléans, Nepean, Stittsville, Manotick and the wider National Capital Region, from compact galley kitchens in Glebe and Hintonburg rowhomes to open-concept islands in newer Kanata and Riverside South builds. Older homes and new builds need different plumbing, wiring, and structural work, and our team knows both.
Don't see your neighbourhood? We build kitchens across the National Capital Region. Call 613-862-4555.
A step-by-step walkthrough of scope, priorities, and sequencing before you start.
Read the guide →Stock vs semi-custom vs custom, door styles, boxes, and hardware that lasts.
Read the guide →Galley, L-shape, U-shape, island, and open-concept matched to real Ottawa floor plans.
Read the guide →How scope, cabinetry, and finish level move the numbers on an Ottawa kitchen.
Read the cost guide →Tell us about your kitchen and what you want from it. We'll book a free in-home consultation, measure, and give you a design concept with clear pricing before you commit to anything.
Response within 2 hours · Mon–Fri 8am–5pm · Sat 9am–3pm
No sales pressure. Ever.
Response within 2 business hours · No obligation
Step 1 of 3. We'll call within 2 business hours.
Step 2 of 3. Your project details.
Step 3 of 3. Almost done.
We call within 2 business hours · Mon–Fri 8am–5pm · Sat 9am–3pm