Soundproofing reduces sound transmission through walls — useful for home theatres, bedrooms adjacent to noisy spaces, basement apartments, and home offices. Real soundproofing isn't 'fluffy insulation' — it's a system of mass, damping, and decoupling. The Sound Transmission Class (STC) rating measures effectiveness: standard walls are STC 30-35; soundproofed walls reach STC 50-60.
This guide covers retrofit soundproofing of existing walls. New construction allows for more aggressive systems (double-stud walls, room-within-room) covered separately.
- Skill level
- Advanced
- Time
- 1–2 days per wall
- Steps
- 8
- Tools
- 5, listed below
- Materials
- 6, listed below
Before you start
Three things to settle:
1. Multiple techniques layered. Real soundproofing combines: mass-loaded vinyl (MLV) layer for mass, sound-dampening drywall (Quietrock) for damping, mineral wool insulation for absorption, resilient channels for decoupling. Single-technique 'soundproofing' (just adding insulation) provides minimal improvement.
2. Address all sound paths. Sound travels through: walls (most direct), ceiling, floor, doors, electrical outlets (penetrations), HVAC ducts. Soundproofing one wall while ignoring outlets and door is mostly ineffective. Plan comprehensively.
3. STC ratings matter. Standard wall: STC 30-35 (normal speech audible through). Acoustic wall (one upgrade): STC 40-45 (loud speech audible). Premium soundproof: STC 55-60 (only loud sounds audible). Decide target based on use.
What you'll need
Tools
- Drywall saw (for removing existing drywall)
- Cordless drill
- Utility knife
- Tape measure
- Stapler (for MLV)
Materials
- Mineral wool insulation (Roxul Safe'n'Sound) — sound-absorbing batts
- Mass-loaded vinyl (MLV) — adds mass to wall
- Resilient channels (RC-1 or RC-2) — decouple drywall from studs
- Sound-dampening drywall (Quietrock 510 or 525)
- Acoustic caulk (for sealing penetrations)
- Putty pads (for electrical box dampening)
Soundproofing is layered, not single-product
Marketing for 'soundproof drywall' or 'soundproof insulation' alone overstates effectiveness. Real soundproofing combines multiple techniques.
Mass + damping + decoupling + absorption + sealing penetrations. Skip any layer and the system fails.
Step-by-step instructions
Remove existing drywall
Soundproofing requires opening the wall to access stud cavities.
Cut drywall and remove. Save light fixtures, outlet covers for re-install.
Install sound-absorbing insulation
Stuff stud cavities with mineral wool batts (Roxul Safe'n'Sound). Mineral wool absorbs sound much better than fibreglass.
Friction-fit between studs. Don't compress — compressed insulation loses absorption properties.
Apply mass-loaded vinyl (MLV)
MLV is heavy vinyl sheet that adds mass to the wall. Roll out and staple to studs.
Overlap seams 6-12 inches; tape seams.
Adds STC 5-10 typical.
Install resilient channels (decoupling)
Resilient channels (RC-1 or RC-2) are thin metal channels that screw to studs at right angles to the studs.
The channels' design isolates drywall from studs — sound can't transfer through direct stud-drywall contact.
Screw RC channels horizontally at 16-24 inch spacing across studs.
Install sound-dampening drywall
Quietrock 510 or 525 has internal damping layer that absorbs sound vibration.
Screw to RC channels (NOT to studs through the channels — that defeats the decoupling).
Use specialty acoustic screws designed for the dampened drywall.
Seal all penetrations with acoustic caulk
Outlet boxes, switches, light fixtures: surround with acoustic caulk before drywall.
Where drywall meets floor, ceiling, and other walls: seal with acoustic caulk. Sound finds any gap.
Special putty pads inside electrical boxes prevent sound transmission through outlets.
Tape and finish
Tape and mud seams normally. Three coats with sanding between.
Verify all seams are sealed.
Address door and other paths
Solid-core door (heavier than hollow-core) with weather seals around frame.
Acoustic door bottoms (drop-down seals) when door closes.
HVAC ducts may need silencers for true soundproofing.
Common mistakes that cost you
- Single-product 'soundproofing'. One product alone provides minimal improvement. Soundproofing is layered.
- Skipping resilient channels. Sound transmits through direct stud-drywall contact. Decoupling is essential for STC 50+.
- Not sealing penetrations. Outlets and seams leak sound. Acoustic caulk all penetrations.
- Hollow-core door with soundproof walls. Door becomes the weakest link. Solid-core door + seals required.
- Wrong insulation type. Fibreglass absorbs less than mineral wool. Use Roxul Safe'n'Sound for soundproofing applications.
Frequently asked questions
What STC rating do I need?
STC 35: normal residential, blocks normal speech.
STC 45: bedrooms, decent privacy, blocks loud speech.
STC 55-60: home theatres, music rooms, blocks most sounds except very loud.
Match target to use.
Does adding insulation alone help?
Marginally. Adding insulation to an empty wall cavity raises STC by 2-5 points.
For meaningful soundproofing, add mass + decoupling + sealing on top of insulation.
What drives the cost of soundproofing a wall?
The biggest driver is your STC target: a basic improvement uses added insulation and a single layer of drywall, while higher ratings stack resilient channel, sound-rated board, and damping compound.
Wall size, whether existing finishes are removed, and the amount of labour and refinishing all factor in. We provide a clear itemized proposal so you understand exactly what is included.
What materials make up a soundproofed wall?
A soundproofed wall layers several materials: mineral wool batts in the stud cavities for absorption, mass-loaded vinyl stapled to the studs for mass, resilient channels screwed across the studs for decoupling, and sound-dampening drywall such as Quietrock 510 or 525 for damping. Every penetration and edge is then sealed with acoustic caulk. Skip any layer and the system fails, and a single product on its own gives minimal improvement.
Do doors and outlets affect how well a soundproofed wall works?
Yes. Sound travels through doors, electrical outlets, ceilings, floors and HVAC ducts as well as the wall itself, so soundproofing one wall while ignoring those paths is mostly ineffective. Seal outlet boxes with acoustic caulk and putty pads, and swap a hollow-core door for a solid-core door with weather seals and a drop-down acoustic door bottom. HVAC ducts may need silencers for true soundproofing.
When to call us instead
Real soundproofing requires expertise and specialty materials. We do home theatre and acoustic projects as part of larger renovations.
Book a free 60-minute site visit →Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555
Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.
Related Ottawa services
If you're building a home theatre or acoustic space, our renovation team handles soundproofing as part of fixed-price work. Book a free 60-minute consultation.
Official references
- Keeping the Heat In, Natural Resources Canada
- Do I need a building permit?, City of Ottawa