Most "luxury bathroom" lists are written by people who do not install bathrooms. They include features that look great in catalogue photos and break in the second year. After two decades of bathroom renovations across Ottawa, here are seven upgrades I actually keep in my own house, and recommend to clients without hesitation.
These are the cost drivers behind each feature, real brand recommendations, and the real reason each one is worth the money. Skip the ones that do not fit your house. The list is meant to be a buffet, not a checklist.
1. Heated floors plus a heated towel bar
Cost drivers: heated floor area (40 sq ft is typical in a primary bath), the membrane-and-cable system you choose, and whether the towel bar is hardwired. Worth it: yes, almost universally.
The single best dollar-for-dollar upgrade in any Ottawa bathroom. The floor goes from cold tile in February to a barefoot pleasure. The towel bar warms a robe in five minutes. Both run on a programmable thermostat that can heat the floor an hour before your alarm goes off.
Brands that work: Schluter Ditra-Heat for the floor (the membrane and cable system in one product, easier to install reliably), Amba or Mr Steam for the towel bar. Avoid the cheap floor-heat kits at big-box stores. The cable spacing is wrong and you get cold spots within two years.
2. Fog-free LED mirror with integrated lighting
Cost drivers: the mirror brand and size, and the dedicated 20-amp circuit it needs. Worth it: yes, especially in primary baths.
The fog-free element is a hidden heating pad behind the mirror that keeps the surface warmer than the room. No fog after a hot shower. The integrated LED is colour-tunable (warm 2700K for evenings, cool 4000K for makeup application) and on a touch dimmer. Some include a small embedded clock or temperature display, which is nicer than it sounds.
The brands worth specifying: Electric Mirror (US-made, premium), Robern (Kohler subsidiary, mid-premium), Krugg (value, surprisingly good build). The cheap LED mirrors from Amazon fail at the wiring within 18 months. The light goes flickery, the defogger stops working, and you cannot replace just the broken component.
Wire it once
The biggest install mistake on bathroom upgrades is not running enough electrical capacity at the rough-in stage. We always specify three dedicated 20-amp circuits in any primary bathroom: one for the mirror and lighting, one for floor heat and towel bar, one for the toilet (heated seat, smart features).
Running them at framing is inexpensive. Adding a circuit later is several times the cost because the drywall has to come down.
3. Smart toilet (or a heated bidet seat)
Cost drivers: a full integrated smart toilet versus a bidet seat retrofit on your existing toilet, plus the GFCI circuit behind it. Worth it: surprisingly, yes.
This is the feature clients are most embarrassed to ask for and most happy with afterward. A Toto Washlet or Kohler Veil with a heated seat, warm-water bidet, deodorizer, and a soft-close lid changes the morning routine. Once you have one, going back to a regular toilet feels primitive.
The full smart toilet (one piece, integrated tank, heated seat, auto-flush) is a luxury. The smarter spend is a high-end bidet seat retrofit on a great toilet. The Toto S550e washlet retrofits onto most existing toilets, gives you 95% of the experience, and is replaceable.
The hidden requirement is that GFCI-protected 20-amp circuit behind the toilet. If you are renovating, run it now. Almost every home built before 2018 lacks one.
4. Freestanding tub (in the right house)
Cost drivers: the tub material and shape, and the plumbing rough-in for a floor-mounted versus wall-mounted filler. Worth it: depends on whether you actually take baths.
The freestanding tub is the most photogenic feature in any bathroom. It is also the one most often regretted. Half the clients who specify a freestanding tub use it less than four times a year. They could have used the floor space for storage or a bigger shower.
If you bath regularly, the freestanding tub is gorgeous and worth it. The shapes that hold up: a clean modern oval (Victoria + Albert, MTI), a slipper tub if your bathroom is more traditional, a Japanese soaking tub if your ceiling height is generous (deeper than wide, smaller footprint, hotter water).
The fillers matter. A floor-mounted thermostatic filler looks like a sculpture and carries a premium for the extra rough-in. The wall-mounted spout costs less but reads as awkward when there is no tub deck.
5. Double vanity (when you can)
Cost drivers: cabinetry quality, the counter material, and the two faucets. Worth it: yes, in any primary bath where two adults share the space.
The double vanity is the upgrade that quietly changes a marriage. Two sinks, two mirrors, two sets of drawers. Nobody has to wait. The morning routine compresses by 15 minutes.
The minimum width that works is 60 inches (two 18-inch sinks with 24 inches of separation). The ideal width is 72 inches. Anything less and the sinks crowd. The cabinet construction we recommend on double vanities: full-height drawers under each sink (not doors with pull-outs), soft-close on everything, integrated handles or simple pulls.
Our in-house cabinet shop builds double vanities to order, so the cabinetry cost tracks size and finish. The quartz counter and the two faucets are separate line items, which is exactly how they appear on our itemized written proposals so you can adjust each one.
6. Walk-in steam shower with bench
Cost drivers: the sealed and waterproofed enclosure, the tile-clad sloped ceiling, the vapour-tight door, and the steam generator. Worth it: yes if you use it weekly.
A real steam shower (not a regular shower with a "steam mode" on the faucet) requires a sealed enclosure, a tile-clad ceiling sloped to drain condensation, a vapour-tight door, a steam generator in a nearby closet or attic, and a built-in bench. Build it right and it is the most relaxing 15 minutes of your week.
The steam generator brands worth specifying: Mr Steam (Series eSeries), ThermaSol, Steamist. The 9 kW unit handles a typical 80 cubic foot Ottawa primary shower with no trouble. Smaller generators struggle to maintain temperature in a cold-climate basement on a January evening.
The bench in a steam shower is not optional. Standing in steam for 15 minutes is unpleasant. Sitting in steam is therapeutic. The bench is what makes the room useable.
The bench should be teak or porcelain, never wood-tile (which holds water in the joints and rots). Build it with hidden drainage and a backrest. About 18 inches deep, 17 inches off the finished floor, full width of the shower wall.
7. Curbless shower with linear drain
Cost drivers: the added framing work to lower the shower floor, the linear drain, and the waterproofing detail. It carries a premium over a standard curbed shower. Worth it: yes, especially as you age.
A curbless shower has no step to enter. The bathroom floor flows continuously into the shower. The water runs to a linear drain along one edge instead of a centre point drain.
The reasons it is worth the upgrade: it looks dramatically cleaner visually (no transition strip, no grout joints from a curb), it is wheelchair-accessible by default (which matters for aging in place), and it is easier to mop because there is no curb to work around.
The structural work is the part most contractors skip. Curbless showers require the floor framing to be lowered by 1.5 to 2 inches in the shower zone so the finished floor inside the shower can slope to drain without rising above the bathroom floor outside.
On a renovation that means the joists get sistered down, not just shimmed up. If your contractor cannot show you a section drawing of how this works, hire a different contractor.
Linear drain brands worth your money: Schluter Kerdi-Line, Infinity Drain, ACO. The 36-inch and 48-inch lengths are standard. Tile slopes from one wall to the drain at 1/4 inch per foot, single direction.
What I would skip
Three bathroom features that get marketed hard and underdeliver:
- Body sprays / multi-head shower systems: expensive to plumb, almost never used after year one, and the extra plumbing is leak-prone
- Towel warmer drawers: solve a problem the heated towel bar already solves, at twice the price
- TVs in the mirror: dated within five years, and the heat from the screen shortens the mirror's life
What it adds up to
A full luxury bathroom with all seven features sits at the top of the bathroom-renovation range. That is for a primary bathroom of about 80 to 110 sq ft, full demo to finish, with our in-house cabinetry, BCIN-stamped drawings, and a 1-year DTR warranty. The variables that move the number most are the steam shower, the cabinetry scope, and the finish level you select.
You do not need all seven. Pick the four that matter most for how you actually live, skip the rest, and the scope comes down accordingly. We build every quote as a detailed written breakdown with each feature on its own line, so you can value-engineer the list against your budget. For more on how the bathroom design phase typically structures these decisions, see our Ottawa bathroom renovation page.
Frequently asked questions
How many electrical circuits does a primary bathroom renovation need?
Plan three dedicated 20-amp circuits in a primary bathroom: one for the mirror and lighting, one for floor heat and the towel bar, and one for the toilet's heated seat and smart features. The toilet circuit must be GFCI-protected, and almost every home built before 2018 lacks one.
Running all three at the framing stage is inexpensive, while adding a circuit later costs several times as much because the drywall has to come down.
How is a curbless shower built so the water stays in?
A curbless shower needs the floor framing lowered by 1.5 to 2 inches in the shower zone, so the finished shower floor can slope to the drain without rising above the bathroom floor outside. On a renovation the joists get sistered down, not shimmed up.
The tile slopes from one wall to a linear drain at 1/4 inch per foot in a single direction, with 36-inch and 48-inch drains standard. A contractor should be able to show a section drawing of it.
What does a real steam shower require?
A real steam shower needs a sealed, waterproofed enclosure, a tile-clad ceiling sloped to drain condensation, a vapour-tight door, a steam generator in a nearby closet or attic, and a built-in bench. A 9 kW generator handles a typical 80 cubic foot Ottawa primary shower, while smaller units struggle in a cold basement on a January evening.
The bench should be teak or porcelain, about 18 inches deep and 17 inches off the finished floor, with hidden drainage.
How wide does a double bathroom vanity need to be?
A double vanity needs at least 60 inches, which fits two 18-inch sinks with 24 inches of separation, and 72 inches is ideal. Anything narrower crowds the sinks. The recommended construction is full-height drawers under each sink rather than doors with pull-outs, soft-close on everything, and integrated handles or simple pulls.
In a primary bathroom shared by two adults, a double vanity can cut about 15 minutes from the morning routine.
Is a heated bathroom floor worth installing in Ottawa?
Yes, almost universally. A heated floor is the single best dollar-for-dollar upgrade in an Ottawa bathroom, turning cold February tile into a comfortable floor, and a heated towel bar warms a robe in five minutes. Both run on a programmable thermostat that can heat the floor an hour before the alarm.
A membrane-and-cable system such as Schluter Ditra-Heat installs reliably, while cheap big-box kits often have wrong cable spacing and develop cold spots within two years.
Official references
- Who can do electrical work at my property?, Electrical Safety Authority