← All articles
Design Inspiration

Before & After: A Glebe
Heritage Bathroom

May 18, 2026 · 6 min read · By Dream Touch Renovations Ottawa

Before & After: A Glebe Heritage Bathroom Renovation
← All articles

The owners had lived with this bathroom for eleven years. A 1908 row house, second floor, primary ensuite squeezed into what used to be a closet. Pink tub, builder-grade pedestal sink, fluorescent box light. Real heritage charm everywhere else in the house, and then this room.

They called us in October. We finished the week before Christmas. Delivered on a fixed-price written proposal covering everything from demo to the last brass towel hook. Here is what we did on this bathroom renovation and why.

The starting point

The room measured 7'2" by 9'4". Not tiny by Glebe standards, but the layout made it feel like a phone booth. The 60-inch tub sat on the long wall with the toilet jammed beside it. Sink on the short wall, door swinging in. You could not open the vanity drawers without closing the door first.

The plumbing stack ran up the back corner, which we could not move without opening the kitchen ceiling below. That single constraint shaped the whole design.

The new layout

We kept the stack location. We moved the toilet to the wall opposite the door so it stops being the first thing you see when you walk in. Tub came out entirely. In its place: a walk-in shower running the full long wall, 36 inches deep, with a linear drain at the threshold.

The freestanding tub went under the original sash window. North-facing, but the light is honest and the homeowner takes baths almost every night in winter. That spot earned its keep.

Vanity: 60-inch double, wall-hung, with a single 12-inch tower of drawers in the centre. Door now swings out into the bedroom, which gave us another six inches of usable floor.

Why a wall-hung vanity in a heritage house

The original baseboards in this room had a 6-inch profile we wanted to keep visible. A floor-mounted vanity would have eaten that detail. Wall-hung lets the trim run continuous behind the cabinet and reads as a clean, intentional move. It also makes the floor easier to mop, which matters more than people admit.

Materials we picked and why

The brief from the owners: warm but not country. Heritage but not Victorian-museum. Brass somewhere because the original front-door hardware is brass and they wanted continuity.

The mixed-metals question

Every client asks. The rule we use, and it has held up across hundreds of bathrooms:

Pick one metal for plumbing on each fixture, and let the second metal show up only on hardware, lighting, or accessories. Never mix metals on a single faucet.

In this room the brass lives at the vanity zone (faucets, mirror sconce, towel ring) and the matte black lives at the shower and tub zone (shower trim, glass clips, robe hook, toilet flush plate). The two zones do not fight because they are physically separated and each one is internally consistent.

The hidden work

This is where the budget went, and where most "before and after" articles lie by omission.

We pulled the floor and found two sister joists that had been notched for the old plumbing in the 1970s. Structural engineer specified two new LVL sisters running the length of the room. Three days of work, and an unbudgeted cost we caught before signing.

The old cast-iron stack was original to the house. It looked sound from the outside. The plumber tapped it and we heard the dead thud of corrosion. Replaced 14 feet of stack from basement to attic with PVC, including the patch-up of the kitchen ceiling.

The exterior wall behind the tub had no insulation. None. We opened it, sprayed 4 inches of closed-cell foam, then a smart vapour barrier. The room now holds heat through a January night without the towel warmer running.

What drove the cost, scope by scope

People want to know where a heritage bathroom budget actually goes. Here is the scope, in rough order of weight:

No surprises mid-project, because we found the joist and stack issues during the planning phase by opening a small access hole before signing the fixed-price written proposal. In a 1908 house, the hidden structural and plumbing work is the biggest single cost driver, which is exactly why we price it before demolition starts.

What we would do differently

Two things, in hindsight.

The shower glass: we specified a fixed panel with no door, relying on the linear drain and a 36-inch depth to contain spray. It works, but the homeowners told us in February that a draft from the hallway cools the shower in winter. A pivot door would have solved it. Adding glass after the fact carries a small cost, and we are doing it this spring.

The brass tub filler is gorgeous, and it was also one of the pricier fixtures. A wall-mount filler from the same family costs noticeably less. The freestanding floor-mount filler is the kind of detail that photographs beautifully and cleans terribly. If you take baths every day, get the wall-mount and put the saved money into the tub itself.

The takeaway for your bathroom

Three things drove this project from "another reno" to a room the owners actually love.

First, we let one constraint (the plumbing stack) dictate the layout instead of fighting it. The budget paid for finishes, not relocated drains.

Second, we picked materials that read as expensive without being fragile. Porcelain that looks like limestone. Plywood-box cabinets that outlive particle board by 20 years. Glass that gets cleaned with vinegar.

Third, we did the hidden work properly. Joists, stack, insulation. Nobody sees it. The room only feels right because of it.

What surprised the owners

Two things, both small. First, the heated towel rack was their top-three favourite item in the room, and it was an inexpensive add. They had hesitated on it during selection. We installed it on a switched circuit so it heats only when the bathroom light is on. They use it every day.

Second, the linear drain at the threshold of the shower. They were nervous about the look ahead of install. By week three of using the bathroom they had stopped noticing it; by week eight they were telling friends it was the smartest decision in the whole project. The drain disappears visually, the water vanishes, and you never have to step over a curb at six in the morning.

Houses this old rarely have a square wall or a level floor, so the plumbing and framing get sorted before anyone chooses tile. What each room has to clear first is set out on our page about bathroom renovation in Ottawa.

If you have a heritage bathroom in the Glebe, Centretown, Sandy Hill, or Hintonburg, the bones of the house deserve a renovation that respects them. See our bathroom renovation service or call us at 613-862-4555 for a free in-home walkthrough.

Frequently asked questions

How do you mix brass and black fixtures in one bathroom?

Mixing metals works when each fixture uses one metal for its plumbing and the second metal shows up only on hardware, lighting or accessories. Never mix metals on a single faucet.

In a Glebe ensuite, brushed brass lives in the vanity zone on the faucets, mirror sconce and towel ring, while matte black lives in the shower and tub zone on the shower trim, glass clips, robe hook and toilet flush plate. The zones stay physically separate and internally consistent.

Why choose a wall-hung vanity in a heritage bathroom?

A wall-hung vanity lets original heritage baseboards run continuous behind the cabinet instead of being cut off by a floor-mounted box. In a 1908 Glebe row house, a wall-hung vanity kept a 6-inch baseboard profile visible and read as a clean, intentional move.

A wall-hung vanity also makes the floor easier to mop. In that room the vanity was a 60-inch double with a 12-inch tower of drawers in the centre.

Is real limestone a good floor for an upstairs bathroom in an old house?

Real limestone is a risky floor for an upstairs bathroom in an old house, because the joists in a century home flex occasionally and limestone would crack at the grout lines within about five years. Limestone-look porcelain handles that flex.

A Glebe ensuite in a 118-year-old house used 12 by 24 limestone-look porcelain in a sand colour with a micro-textured surface for grip, plus matching 24 by 48 vertical porcelain on the shower walls.

What hidden problems show up when renovating a century-home bathroom?

Century-home bathrooms often hide structural, plumbing and insulation problems. A 1908 Glebe ensuite had two joists notched for plumbing in the 1970s, fixed with two engineer-specified LVL sisters running the length of the room. The original cast-iron stack looked sound but was corroded, so 14 feet were replaced with PVC from basement to attic.

The exterior wall behind the tub had no insulation and got 4 inches of closed-cell foam and a smart vapour barrier.

Does a doorless fixed glass shower panel work well?

A fixed glass panel with no door can contain spray when paired with a linear drain and a shower 36 inches deep, but it can let drafts in. In a Glebe ensuite, the owners found that a draft from the hallway cooled the shower in winter, and a pivot door would have solved it.

The same room's linear drain at the shower threshold worked well: it disappears visually, the water drains away, and there is no curb to step over.

Official references

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →