Hardwood floors can be refinished multiple times over their 50+ year lifespan — restoring scratched, worn, or outdated floors to like-new condition. The process: sand off the existing finish (and slightly the wood surface), stain (optional), apply new clear topcoat.
The job requires specialty equipment (drum sander, edge sander) typically rented for the project. Professional finishers do this in 2 days; DIY takes 3-5 days with rented equipment.
This guide covers a complete refinishing of solid hardwood. Engineered hardwood with thin top veneer cannot be refinished or only once before reaching the substrate.
- Skill level
- Advanced
- Time
- 3–5 days
- Steps
- 10
- Tools
- 11, listed below
- Materials
- 5, listed below
Before you start
Three things to settle:
1. Equipment rental. You'll need three rental machines: a drum sander for the field, an edge sander for the perimeter and around obstacles, and a vacuum for dust. Most rental shops bundle these by the day, so plan rental days around your project length. Budget separately for sandpaper grits and finish products.
2. Plan to vacate the home. Refinishing produces tremendous dust during sanding and toxic fumes during stain/finish. Plan to live elsewhere for 3-5 days. Family with allergies or respiratory issues should especially avoid the home during work.
3. Containment is critical. Dust travels everywhere. Even with HEPA filters and zip walls, expect to find sanding dust in the rest of the home for weeks. Use plastic sheeting to seal off the work area; cover or remove all furniture, art, electronics.
What you'll need
Tools
- Drum sander (rented)
- Edge sander or random orbit sander (rented)
- Shop vacuum with HEPA filter
- Putty knife
- Paint brush and roller (for finish)
- Lambswool applicator (for finish)
- Tape measure and pencil
- Respirator (organic vapor + particulate filter)
- Knee pads
- Painter's tape
- Plastic sheeting
Materials
- Sandpaper grits: 36 (rough), 60 (medium), 80, 100 (fine), 120 (final)
- Wood filler (for nail holes and gaps)
- Stain (if changing colour)
- Polyurethane (oil-based or water-based, 3 coats)
- Tack cloth (for dust between coats)
Move out for the duration
Refinishing is among the most-disruptive home projects. Sanding produces fine wood dust that infiltrates everywhere. Finish products release toxic fumes (oil-based polyurethane especially).
Plan to vacate the house for 3-5 days — the work plus 2 days of off-gassing after the final coat. Returning earlier exposes residents to harmful fumes.
Step-by-step instructions
Prepare the room
Remove all furniture, area rugs, and wall art.
Cover or remove all electronics.
Seal off doors with plastic sheeting and zip walls. Cover HVAC registers.
Inspect floor and prep
Walk the floor and identify problems: deep scratches, gaps, popped nails, damaged boards.
Drive any popped nails below the surface with a nail punch.
Replace damaged boards if needed (significantly more involved — best done before sanding).
Sand with coarse grit (36 grit)
Start with the drum sander loaded with 36 grit sandpaper. This grit removes the existing finish and any deep stains.
Sand in the direction of the wood grain. Move steadily; don't pause in one spot (drum sanders gouge).
Use the edge sander to reach areas the drum can't (perimeter, around obstacles).
Progress through grits
Vacuum thoroughly between grits (sandpaper grit changes are NOT optional — skipping grits leaves visible scratches in the finish).
60 grit: smooths the rough sanding from 36.
80 grit: further refining.
100 grit: nearing final smoothness.
120 grit: final smoothing, ready for finish.
Vacuum and tack
After final sanding, vacuum the entire floor thoroughly using a HEPA filter.
Wipe with tack cloth to pick up final dust.
Don't apply finish over any visible dust — it'll trap in the finish forever.
Apply stain (optional)
If changing the floor's colour, apply stain per its instructions. Use a lambswool applicator or rags.
Wipe excess stain with clean rags before it dries.
Let stain dry per package — typically 8-24 hours.
Apply first coat of finish
Apply polyurethane finish with a lambswool applicator, working with the grain. Thin even coats.
Oil-based polyurethane: amber tint, longer cure, more durable. 24-hour cure between coats.
Water-based polyurethane: clear (no amber), faster cure (4-6 hours), slightly less durable.
Sand between coats with 220 grit
After first coat is fully dry, hand sand or use a random orbit sander with 220 grit. Just light sanding to scuff the surface — provides bond for next coat.
Vacuum and tack before applying next coat.
Apply 2-3 additional coats
Three coats total typical. Some installations use four for high-traffic areas.
Sand and tack between each coat.
Final coat: don't sand. Let cure undisturbed.
Cure 5-7 days before heavy use
Light foot traffic (sock feet) acceptable after 24-48 hours.
Heavy use (furniture, area rugs, regular foot traffic): wait 5-7 days.
Full chemical cure: 30 days. Stay off as much as possible during this period.
Common mistakes that cost you
- Skipping grits. Visible scratches show through finish. Progress through 36, 60, 80, 100, 120.
- Not vacuuming between grits. Coarse grit residue gouges with finer grits. Vacuum thoroughly each transition.
- Drum sander pauses. Gouges the floor. Move steadily; don't stop in one spot.
- Working without respirator. Wood dust and finish fumes are toxic. Always wear respirator.
- Furniture too soon. Finish needs full cure. Wait 5-7 days for normal use, 30 days for heavy use.
- DIY without rental equipment. Hand-held sanders can't achieve drum sander's effect. Rent the right tools.
Frequently asked questions
Should I refinish or replace?
Refinish if: hardwood is solid (not engineered with thin veneer), in good condition, scratches don't go through to subfloor.
Replace if: floor is damaged beyond refinishing, water damaged, was already refinished multiple times (each refinish removes 1/16 inch of wood).
How long does professional refinishing take?
Professional crews: 2 days for sanding + 1 day for staining + 2-3 days for finish coats.
DIY: 3-5 days plus rental equipment time.
Oil-based or water-based polyurethane?
Oil-based: more durable, amber colour (warms wood tone), longer cure, stronger fumes.
Water-based: clear (no amber), faster cure, less smell, slightly less durable.
Most modern homeowners choose water-based for the cleaner application.
What sandpaper grits are used to refinish hardwood floors?
Refinishing hardwood floors runs through five grits on the drum sander: 36 to strip the old finish and deep stains, then 60, 80, 100 and finally 120 before any finish goes on. Skipping a grit leaves scratches that show through the finish.
Vacuum thoroughly between every grit change, because coarse residue gouges the floor under the finer paper. Between coats of polyurethane, scuff lightly with 220 grit, then vacuum and tack.
When can I walk on refinished hardwood floors or bring furniture back?
Light traffic in sock feet is fine on refinished hardwood 24 to 48 hours after the final coat. Wait 5 to 7 days before moving furniture back, laying area rugs or resuming regular foot traffic. The finish takes about 30 days to reach full chemical cure, so stay off the floor as much as possible during that month.
Residents should also stay out for 3 to 5 days, including 2 days of off-gassing.
When to call us instead
Hardwood refinishing is most-often hired out to specialists. The equipment, dust management, and skill required favour professional work. We coordinate refinishing as part of larger renovations.
Book a free 60-minute site visit →Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555
Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.
Related Ottawa services
If you're updating floors as part of a renovation, our residential renovation team coordinates flooring refinishing and replacement. Book a free 60-minute consultation.
Official references
- Asbestos in the home, Health Canada
- Hand Tools: General Hand Tool Operation, Canadian Centre for Occupational Health and Safety