Home renovation before and after in Ottawa by Dream Touch Renovations
Ottawa Home Renovation · Whole-Home · Multi-Room · Every Room

Design-build renovation in Ottawa.

Whole-home projects. One team, every room.

Whole-home renovations, multi-room packages, kitchens, bathrooms, basements, additions, flooring, painting and exterior work, all from one Ottawa team and one general contractor. You get a fixed-price contract and a free in-home consultation, backed by 20 years of Ottawa projects.

Call 613-862-4555
500+
Ottawa renovations completed
20+ yrs
Building Ottawa homes since 2004
4.7★
Google reviews from real clients
1 contract
For your entire renovation
Free in-home consult
No deposit required.
One team for all
Kitchens, baths, basements.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.
Skip the scrolling. Find your project in 10 seconds.

What kind of Ottawa renovation are you planning?

Tap your situation and we'll show you which Dream Touch services and pricing fit it. No newsletter signup needed.

Step 1 · Project Scope
What's next?

Or keep scrolling; everything is below.

Ottawa's most complete renovation team since 2004

Why Ottawa homeowners renovate the whole house with one team.

Most Ottawa homeowners think they need multiple contractors: one for the kitchen, another for flooring, another for painting, another for the basement. Running multiple trades on one home means coordinating schedules, fighting over change orders, sorting out blame when something goes wrong, and paying five different invoice cycles.

Dream Touch Renovations works as your general contractor: we manage every trade, every permit, every material order and every inspection under one fixed-price contract. Because one company runs the job, you are not dealing with a string of separate companies, and you get one point of accountability from first consultation to final walkthrough. That accountability is a big reason Ottawa homeowners recommend us over other renovation companies.

This matters most on a whole-home or multi-room renovation. If you're renovating a kitchen and a bathroom while refinishing floors and updating lighting, one project manager has to sequence all of it, because each trade affects the next. Plumbing rough-in comes before drywall, then paint, flooring, trim and final fixtures. Get the order wrong and you pay for the same work twice.

A whole-home renovation in Ottawa needs a builder who has sequenced these trades hundreds of times. Dream Touch has done exactly that across 20 years of Ottawa projects, and every client we take on gets a dedicated project manager who plans that sequence every day.

It's why Ottawa families keep coming back to us for their second, third and fourth house renovation.

Whole-home work usually grows out of one room. A kitchen renovation in Ottawa often turns into an opened-up main floor, a bathroom renovation in an older house brings new drains, and a basement renovation in Ottawa can add a bedroom or a legal suite.

Dream Touch's 20-year Ottawa track record covers every renovation category. We take on home remodeling projects large and small, including kitchen renovations, bathroom renovations, basement finishing, additions, attics, multi-unit conversions, exterior work, and smaller upgrades like flooring, painting, lighting, hardware, and fixtures. We work in every Ottawa neighbourhood, including Barrhaven, The Glebe, Manotick, Orleans, Kanata and Vanier.

With two decades of completed projects, a 4.7-star Google rating, and a 98% on-time rate, Dream Touch has become the renovation team Ottawa homeowners recommend by name. Every residential renovation we do is covered by our 1-year workmanship warranty plus manufacturer warranties up to 25 years. Explore our Coach Houses, Home Additions, or Financing pages for more on specific scopes.

Multi-room renovation packages

Design-build packages, scoped to your project.

Most contractors keep the scope vague until they've done a 90-minute consultation, two follow-up calls, and a written proposal. Below are six common multi-room renovation Ottawa packages that families combine into one project, with exactly what each includes, so you understand the scope before you call. Every package ends in a fixed written proposal with an itemized breakdown.

The Refresh

Cosmetic scope
Whole-floor cosmetic update
  • Full interior repaint (rooms, ceilings, trim)
  • Refinish or replace flooring (one floor)
  • Updated lighting throughout
  • New hardware, fixtures, switch plates
Timeline: 3–5 weeks
Most popular for: New homeowners moving in, listing prep, post-tenant turnover.

Kitchen + Bath Combo

Two-room scope
Two highest-ROI rooms together
  • Full kitchen renovation with custom cabinetry
  • Main bathroom complete renovation
  • Coordinated flooring transition
  • Lighting design across both spaces
Timeline: 8–12 weeks
Most popular for: Mid-life home upgrades, families with growing kids, ROI-focused renovation.

Basement + Bathroom

New living-space scope
Unlock 800–1,400 sq ft of living space
  • Full basement finishing (rec room, bedroom, storage)
  • New basement bathroom with proper waterproofing
  • Sound insulation upgrade
  • HVAC balancing for new space
Timeline: 8–14 weeks
Most popular for: Growing families, in-law suite prep, rental income setup.

Multi-Bath Renovation

2–3 bathroom scope
Renovate 2–3 bathrooms together
  • Two main bathrooms or 1 ensuite + 1 main + powder
  • Coordinated finish palette
  • Bulk material savings
  • Single permit cycle, single inspection
Timeline: 6–10 weeks
Most popular for: Multi-bath homes, families upgrading before kids leave, resale prep.

Whole-Home + Addition

Renovation + new footprint scope
Full renovation + new construction footprint
  • Everything in Whole-Home Package
  • Rear, side, second-storey, or coach home addition
  • Coordinated architectural design
  • Single permit cycle for entire scope
  • Single fixed-price contract
Timeline: 6–12 months
Most popular for: Forever-home renovations, families who need more room but love their location, executive renovations.
Home renovation packages Ottawa don't have to be off-the-shelf. Build your own custom package.
Recent Ottawa projects

Real projects. Real Ottawa homes.

A small selection of recent multi-room and whole-home Dream Touch projects. Browse our full portfolio → for hundreds more.

View Full Portfolio →
Family room renovation Ottawa Kemptville games room
Kemptville · 2024

Family + Games Room

  • Open-concept layout
  • Built-in entertainment wall
  • Custom storage
  • Engineered hardwood throughout
Living room renovation Ottawa Kemptville
Kemptville · 2024

Living Room Renewal

  • Vaulted ceiling exposure
  • Layered lighting design
  • Premium millwork
  • Soundproofed shared wall
Primary bedroom renovation Ottawa Kemptville
Kemptville · 2024

Primary Bedroom Suite

  • Walk-in closet redesign
  • Custom built-ins
  • Updated trim and millwork
  • Hardwood refinishing
Dining room renovation Ottawa Kemptville
Kemptville · 2024

Dining Room Refresh

  • Statement light fixture
  • Wainscoting and crown molding
  • Refinished hardwood
  • Designer paint palette
Custom walk-in shower Ottawa Dunrobin
Dunrobin · 2023

Custom Walk-In Shower

  • Frameless glass enclosure
  • Schluter waterproofing
  • Curbless entry
  • Heated tile floor
Basement theatre room Ottawa Manotick
Manotick · 2024

Basement Theatre Room

  • Acoustic panel treatment
  • Tiered seating platforms
  • Soundproofed walls
  • Integrated AV system
Small projects, big impact

Smaller Ottawa renovations and upgrades.

Some Ottawa renovations are small, and some of the highest-ROI improvements take only days. Dream Touch handles the upgrades below regularly, sometimes as standalone projects and often bundled into larger renovations. Each gets a clear written scope before work begins.

Flooring Installation Ottawa

Engineered hardwood, solid hardwood refinishing, large-format porcelain tile, luxury vinyl plank, and high-end carpet. We level subfloors, install to tight tolerances and finish the trim cleanly.

Cost drivers: material grade (LVP to premium hardwood), area, subfloor prep

Common Ottawa scenarios: Whole-floor refinish before sale, kitchen+living merger, basement flooring, post-water-damage replacement

Interior Painting Ottawa

Whole-floor or whole-home repaints, ceilings, trim, accent walls, custom colour mixing. We patch, sand and prime first so the finish coat looks right.

Cost drivers: number of rooms, ceiling height, prep and trim detail

Common Ottawa scenarios: Pre-listing prep, post-renovation, freshening up after kids, dramatic colour update

Pot Lights Ottawa

LED pot lights, layered lighting design, dimmer zones, pendant fixtures, under-cabinet lighting, accent and architectural lighting. Includes electrical work and ESA inspection.

Cost drivers: light count, ceiling access, ESA inspection, dimmer zoning

Common Ottawa scenarios: Dated 1980s–90s homes with builder-grade lighting, kitchen brightness upgrade, entertaining-space ambiance

Cabinet Hardware Ottawa

Cabinet pull and knob upgrades, hinge replacements, door refacing, full cabinet box refinishing. Often the highest-ROI single change in a kitchen or bathroom.

Cost drivers: hardware refresh vs. full refacing, cabinet count, finish

Common Ottawa scenarios: Pre-listing kitchen update, dated 90s/2000s cabinets structurally fine, budget-conscious refresh

Backsplash Installation Ottawa

Subway tile, mosaic, slab-stone, full-height tile-to-ceiling, geometric patterns. Proper waterproofing behind sink and range. Usually 1–2 day projects.

Cost drivers: tile selection (subway to premium slab), coverage, pattern

Common Ottawa scenarios: Pre-renovation kitchen pop, bathroom accent, finishing touch on a fresh kitchen

Plumbing Fixtures Ottawa

Faucet replacements, toilet upgrades, shower fixture swaps, vanity replacements. Licensed plumber on every install. We favour water-efficient fixtures that pay back in utility savings.

Cost drivers: fixture count and grade, rough-in changes, licensed plumber

Common Ottawa scenarios: Hard-water fixture replacement, low-flow upgrade for water savings, single-fixture failure

Crown Molding Ottawa

Crown molding, baseboards, casing, wainscoting, board-and-batten feature walls. Mitre-cut and coped joints, painted to match.

Cost drivers: room count, profile complexity, ceiling height, paint finish

Common Ottawa scenarios: Heritage Glebe/Centretown homes, post-renovation finishing, adding character to plain rooms

Window Replacement Ottawa

Triple-pane low-E window upgrades, fibreglass entry doors, patio doors, garden doors. Professional flashing, insulation, and trim integration. Energy savings within 1–2 winters in Ottawa.

Cost drivers: window count and size, glazing, framing and trim work

Common Ottawa scenarios: 1970s–90s windows end of life, high winter heating bills, curb appeal upgrade

Roofing Ottawa

Asphalt shingle replacement, full re-roofing with ice & water shield, soffits, fascia, eavestroughs. Coordinated with siding refresh, exterior painting, and front-entry upgrades.

Cost drivers: roof area, slope complexity, shingle grade, soffit/fascia scope

Common Ottawa scenarios: 20–25 year shingle replacement, post-storm damage, coordinated curb appeal package

Most of these can be done as single projects or bundled into larger renovation packages for coordination and material savings. Call 613-862-4555 to discuss your specific scope.

How a whole-home Ottawa renovation actually works

From first walk-through to handover keys, the 12-phase whole-home renovation playbook.

Whole-home renovations are more complex than single-room projects: they need strict trade sequencing, single-permit-cycle planning and continuous project management. Below is the 12-phase process Dream Touch refined across 20 Years of Ottawa Projects.

1
30 min · Free

Free Discovery Call

Talk through your goals, timeline, and budget. Confirm we're a fit before site visit.

2
90 min · Free

In-Home Consultation

Walk every room, measure existing conditions, identify priorities, sketch layout options.

3
1–2 wks

Conceptual Design + Estimate

Design concept with photo references, finish suggestions, and written estimate range.

4
3–6 wks

Detailed Design + 3D Renderings

Full architectural drawings, finish specs, fixture lists, photorealistic 3D renderings.

5
1–2 wks

Fixed-Price Contract

Line-item costing for every trade, material, finish. You approve before permits.

6
4–10 wks

Permits + Material Ordering

All permits filed. Materials ordered to our warehouse, we don't demo until delivery.

7
1–2 wks

Site Protection + Demolition

Floors covered, doorways sealed, dust containment. Demo down to studs as needed.

8
2–6 wks

Structural + Mechanical Rough-In

Framing mods, plumbing, electrical, HVAC ducting roughed in and inspected.

9
2–4 wks

Insulation + Drywall

Insulation upgraded to code, vapour barrier detailed, drywall hung, taped, mudded.

10
4–10 wks

Finishes + Cabinetry

Tile, flooring, cabinets, counters, painting, trim, doors, hardware. The visible phase.

11
1–2 wks

Final Mechanical + Inspections

Light fixtures, plumbing, appliances installed. Final municipal + ESA inspections.

12
1 wk

Walkthrough + Handover

Walkthrough with PM, deficiencies resolved, warranty docs delivered, keys handed over.

Most Ottawa whole-home renovations run 4–7 months end-to-end. Multi-room projects run 8–14 weeks. Single-room projects run 3–8 weeks.

Before you hire anyone

Before you hire a design-build team: seven checks.

Hiring the wrong company is expensive to undo. Run these checks even if you don't end up hiring us.

1

Are they licensed in Ontario as a General Contractor?

Most "contractors" you find online are unlicensed handypersons who took on bigger projects than their license allows. Licensed General Contractors carry minimum $2M liability insurance, WSIB coverage, and meet Ontario's qualification standards. Ask for the license number and verify it.

Dream Touch is a Licensed Ontario General Contractor, fully insured, WSIB-active. License available on request.
2

Do they have current Ontario WSIB clearance?

If a contractor's worker is injured on your property and they don't have WSIB, you become personally liable. Always ask for a current WSIB Clearance Certificate (free, takes 30 seconds for them to pull online). If they can't produce one, walk away.

Dream Touch maintains continuous WSIB clearance. Current certificate provided to every client.
3

Are they Tarion-enrolled (for additions and major builds)?

Tarion warranty covers structural defects on new construction and additions for up to 7 years. Only contractors enrolled with Tarion can build legally for these scopes. Without it, you have zero structural recourse if foundations crack or framing fails.

Dream Touch is Tarion-enrolled for additions and major build scopes.
4

Will they provide a fixed-price contract before demolition?

Most renovation horror stories start with "estimates" that balloon into change orders. A real contractor commits to a fixed price after design is complete and before demolition starts. Anyone who insists on time-and-materials billing or won't lock pricing in writing is shifting the cost of their own mistakes onto you.

Every Dream Touch project is a written fixed-price contract signed before permits are pulled.
5

Can they show 5+ recent local references?

Recent (past 12 months), local (Ottawa), specific to your scope. Drive by 1–2 of the homes if you can. Talk to references about communication, timeline accuracy, and how change orders were handled.

Dream Touch can provide 10+ recent Ottawa references in your specific renovation type, plus drive-by addresses.
6

Do they handle permits or push that to you?

Many smaller contractors require the homeowner to pull permits to limit their own liability. That is a serious red flag. If the contractor isn't named on the permit, the work isn't legally theirs and you become the legal builder of record.

Dream Touch pulls every permit in our company name. Building, electrical, plumbing, HVAC, structural.
7

What's their actual workmanship warranty?

A verbal warranty is worth nothing, so get it in writing. The industry standard is 1 year, quality contractors offer 2–5 years, and premium contractors offer 5–10 years on workmanship plus pass-through manufacturer warranties.

Dream Touch offers 1-year workmanship warranty as standard, plus pass-through manufacturer warranties up to 25 years, plus 10-year structural warranty on additions.

The full list is in our guide, six things to verify before you sign.

What drives Ottawa renovation pricing

What affects Ottawa renovation pricing in 2025–2026.

Every Dream Touch project ends in a fixed written proposal instead of a vague "estimate" or "starting at" teaser. Pricing depends on finish level, structural complexity and site conditions. The table below shows the main cost driver behind each renovation type, so you know what moves the number before your consultation.

Project Type
Primary Cost Driver
Notes
Kitchens
Kitchen: Refresh
Cabinet approach & finishes
Same footprint, refacing or stock cabinets
Kitchen: Full Renovation
Cabinetry & counter selections
Custom cabinetry, premium counters
Kitchen: Open-Concept w/ Wall Removal
Structural work & engineering
Includes structural engineering
Bathrooms
Bathroom: Powder Room
Tile & fixture selections
Toilet, vanity, tile floor & walls
Bathroom: Main Family
Gut scope & tile grade
Full gut, premium tile, modern fixtures
Bathroom: Primary Ensuite
Shower, tub & vanity scope
Walk-in shower, freestanding tub, double vanity
Basements
Basement: Rec Room Refresh
Area & finish level
Open finishing, basic finishes
Basement: Full Finishing w/ Bath
Layout & plumbing scope
Bedroom, bathroom, full layout
Basement: Legal Suite Conversion
Code compliance & egress
Bill 23 compliant, separate entrance
Additions
Addition: Bump-Out
Footprint & foundation work
Up to 300 sq ft
Addition: Rear/Side
Square footage & finishes
400–800 sq ft
Addition: Second Storey
Structural & full-floor scope
1,000+ sq ft
Income Property
Coach Home (Laneway)
Standalone build & servicing
Full standalone backyard rental
Multi-Unit: Duplex Conversion
Separation & code upgrades
Existing home → 2 units
Multi-Unit: Triplex Conversion
Unit count & fire separation
Existing home → 3 units
Other
Sunroom: Three-Season
Glazing & structure scope
Glass walls, no heating
Sunroom: Four-Season
Insulation & heating scope
Heated, year-round usable
Attic Conversion
Dormer & access requirements
Depends on dormer needs
Whole-Home Renovation Package
Room count & finish level
Multi-room comprehensive

Your finish selections and site conditions set the final number. A free in-home consultation gives you an exact fixed written proposal for your specific project.

City of Ottawa program

Ontario Renovates in Ottawa: who qualifies in 2026

In Ottawa, the City runs the Ontario Renovates homeowner program, which helps low-income seniors and people with disabilities pay for essential repairs and accessibility changes to the home they live in. It pays up to $20,000 in total: a 10-year forgivable loan of $15,000 for repairs or accessibility work, and a $5,000 grant for accessibility work only.

The City's Ontario Renovates homeowner page (updated 2026-06-09) says you may qualify if:

  • you own the home in Ottawa and it is your sole and principal residence;
  • its value is $670,908 or less, going by your property tax bill and MPAC assessment;
  • you are 65 or older, you have a disability, or you live with a senior or a person with a disability;
  • your household's total gross yearly income is at or under the City's limit for its size, in the table below.
Household size
Maximum gross yearly income
One person
$40,000
Two persons
$53,400
Three persons
$65,400
Four persons
$78,400
Five persons
$88,400
Six persons
$99,350
Seven or more persons
$109,000

The City lists heating, doors, windows, foundations, roofs, walls, floors and ceilings, plumbing, electrical, septic systems, wells and fire safety among the eligible repairs. Ramps, handrails, chair and bath lifts and height-adjusted countertops are on its list of accessibility modifications.

The application needs verified quotes for the work, and the City does not fund repairs done before it approves the loan or grant. Get the quote first, and set the start date after approval. To have the loan forgiven, you must own and live in the house for 10 years after the work is finished.

Funding is first come, first served until March 31, 2027, and the City takes applications by email at ontariorenovates@ottawa.ca, by mail or in person.

For accessibility work, our accessibility renovations page covers the federal and Ontario tax credits for the same kind of project, and renovation financing covers paying for the rest.

Source: City of Ottawa, Homeowner, Ontario Renovates program (updated 2026-06-09).

4.7★ rating · 20 years of Ottawa clients

Real Ottawa families. Real Dream Touch renovations.

"

Dream Touch Renovations transformed my house into a dream home. From design to execution, they exceeded my expectations. The team's dedication and attention to detail was top-tier. Highly recommend.

Samantha ThompsonOttawa homeowner · Whole-home renovation
"

Moe and the team did a fantastic job on our home. Custom cabinetry, painting, crown molding, French doors, pot lights, plumbing, everything was excellent. The crew was pleasant, polite, helpful, patient with our changing ideas, and clean. I would hire Dream Touch Renovations again.

Saralyn HodgkinWestboro homeowner · Whole-home + addition
"

Dream Touch Renovations made our renovation a breeze. Their expertise and professionalism were outstanding. Clear communication, on-time delivery, and impeccable workmanship.

Michael RodriguezKanata homeowner · Family room addition
"

Dream Touch Renovations is truly exceptional. The team's creativity and commitment to quality made our project a success. The house was always clean and the process was stress-free.

Emma DavisOrleans homeowner · Multi-room renovation
"

Moe went out of his way to help us. He upgraded our sink at no cost, sent his electrician to move lighting, and did a follow-up to make sure we were completely content. Cabinets are beautiful and everyone who enters our kitchen has given us very positive reviews.

Joan ArseneauOttawa homeowner · Kitchen renovation
"

I have worked with Dream Touch before so they were the first people I called. Once again I am VERY pleased with the reasonable prices, quality of work, and their hard-working, skilled staff.

Diana ThibodeauOttawa homeowner · Basement + foundation
Every Ottawa neighbourhood

Design-build in every Ottawa neighbourhood.

Dream Touch has completed renovations in every Ottawa neighbourhood and surrounding community. We know the heritage rules of Centretown, the architectural styles of the Glebe, the building codes of new Barrhaven and Kanata builds, and the practical realities of older Hintonburg and Westboro homes.

AlbionAlta VistaBarrhavenBells Corners Carlsbad SpringsCarlingtonCarpCentretown Civic HospitalDunrobinFindlay CreekThe Glebe GloucesterGreelyHillcrestHintonburg KanataManor ParkManotickMechanicsville NepeanNew EdinburghOld Ottawa EastOld Ottawa South OrleansOverbrookRiverside SouthRiverview Park RockcliffeSandy HillStittsvilleVanier Wellington VillageWestboro

Dream Touch has worked as an Ottawa renovation contractor since 2004. Live somewhere else in the National Capital Region? Call 613-862-4555. We work across the region, including Ottawa, Carleton Place, Manotick and Embrun.

Common questions

Ottawa renovation questions, answered.

The questions Ottawa homeowners ask most often when planning multi-room or whole-home renovations.

Talk to a renovation specialist

Free 15-minute call. No obligation.

Call 613-862-4555

Whole-home renovation pricing in Ottawa is driven by home size, the number of rooms, finish level, structural changes, plumbing and electrical scope, permits, and site conditions. A standard package (kitchen + bathrooms + basement + flooring + paint + lighting) costs less than one with high-end finishes or significant structural work; adding new footprint raises it further. Every Dream Touch project ends in a written, fixed-price contract with an itemized breakdown, so you understand exactly what is included before work begins.

Most Ottawa whole-home renovations run 4–7 months end-to-end, including design (3–6 weeks), permits and material ordering (4–10 weeks), and active construction (12–20 weeks). Multi-room projects (2-4 rooms) typically run 8–14 weeks. Single-room projects run 3–8 weeks. Dream Touch maintains a 98% on-time rate with written delivery dates in every contract.

It depends on scope. If we work on one floor at a time, most families can stay. If the kitchen and bathrooms are renovated at the same time, you will usually need temporary housing for 4–8 weeks. At the design stage we plan the phasing with you so the home stays liveable where possible.

Use the cost-driver table above to see what moves the number for each renovation type: scope, room count, finish level, and structural complexity. A free Dream Touch consultation translates your specific project into a fixed written proposal with an itemized breakdown, so you know exactly what is included before you commit.

Yes. Dream Touch pulls all permits in its own company name: building permits, electrical (ESA), plumbing, HVAC and structural engineering. We're the legal builder of record for everything, and we never ask homeowners to pull permits on our behalf.

1-year workmanship warranty on installation as standard. Up to 25-year manufacturer warranty on hardware, cabinetry, and appliances. 10-year structural warranty on additions and major builds. Tarion warranty for new construction work where applicable. All warranties documented in writing.

Ask for: (1) Ontario General Contractor license, (2) WSIB clearance certificate, (3) comprehensive liability insurance proof, (4) 5+ recent local references, (5) fixed-price contract structure, (6) Tarion enrolment for additions, (7) written warranty terms. If a contractor is reluctant to provide all seven, keep looking.

In Ottawa usage, the terms are mostly interchangeable. Technically: "renovation" implies updating existing rooms or systems (kitchen renovation, bathroom renovation), while "remodel" implies more significant layout changes (gutting and reconfiguring a space). "General renovations" covers both and any combination.

Yes. Dream Touch designs phased renovation plans for clients who want to spread investment over 2–5 years. Common phasing: kitchen + main bathroom in year 1, basement finishing in year 2, addition or whole-floor refresh in year 3. Phasing eases cash flow and gives you time to live with each completed phase.

Yes. Dream Touch handles single-project work (flooring installation, painting, lighting, fixture replacement, hardware, molding) as well as multi-room and whole-home renovations. Smaller projects often work best when bundled into larger renovations for trade efficiency, but standalone projects are welcome. Call 613-862-4555 to discuss.

Pre-listing renovations are judged on ROI. Some renovations (kitchen, primary bathroom, paint, flooring) deliver 80%+ ROI at resale; others deliver under 50%. Dream Touch's pre-listing consultations rank renovation options by Ottawa market ROI and recommend the highest-impact, lowest-risk improvements for your specific neighbourhood.

Yes. Siding, roofing, soffit/fascia/eavestroughs, exterior painting, deck construction, window replacement, exterior door upgrades. Often coordinated with interior renovations as a complete curb-appeal package.

Dream Touch carries $2M+ commercial general liability insurance plus full WSIB coverage on every worker. If something on-site is damaged, our insurance covers it. If a worker is injured, WSIB covers them. Without that coverage, homeowners who hire unlicensed contractors become personally liable, which many don't realize.

Call 613-862-4555 or book a free consultation online. We'll do a 30-minute discovery call (free, no obligation), then schedule a 90-minute in-home consultation (also free) to walk every room you're considering. From there, we provide a conceptual estimate and timeline so you know if Dream Touch is right for your project.
Your Ottawa renovation starts here

Free in-home consultation.
Real numbers.
Real timeline. Zero obligation.

Tell us your address, what you're hoping to renovate, and your rough budget range. We schedule a free 90-minute in-home consultation, walk every room, and follow up with a written conceptual estimate and project timeline within 5 business days, with no deposit and no sales pressure.

100s
Ottawa Projects
4.7★
Google
Est. 2004
20+ Years
A+
BBB
Licensed
& Insured
5-yr
Warranty