← All articles
Contractor Insights

How We Approach
Renovations Differently

Jul 13, 2025 · 8 min read · By Dream Touch Renovations Ottawa

How Dream Touch Approaches Renovations Differently
← All articles

Most Ottawa renovations follow the same broken sequence. Homeowner gets a designer to draw something nice. Designer hands drawings to a general contractor. GC realizes the drawings will not actually build because details were missed. Change orders start before demolition is finished. Six months in, the budget is 30 percent over and the homeowner has stopped enjoying the process.

We have run Dream Touch since 2004 with a deliberately different model. Every piece of how we work was built to fix one of those failure points. After 500 plus completed Ottawa projects, we are confident enough in the model to explain it openly, including where it differs from the traditional GC approach and which clients it does not fit.

1. The free 48-hour lot feasibility review

Before we quote a renovation, we tell you whether what you want is even legal on your lot.

For free, within 48 hours of you reaching out, our team pulls your zoning (Ottawa By-law 2008-250), checks setback requirements, lot coverage, height restrictions, and any heritage or floodplain constraints. We tell you whether your dream addition fits the envelope, whether your basement can be legally converted to a secondary suite, and whether a coach house is allowed on your lot.

This sounds basic. It is not. We have walked into homes where another contractor had taken a deposit and started drawings for an addition that was zoning-illegal. The owner had no idea until the permit was rejected six months and a five-figure deposit later. Our 48-hour feasibility check is built specifically to never let that happen.

It is free because it has to be. If we charged for it, fewer people would do it, and more people would walk into projects they should not have started. Bill 23 changed parts of the rules on secondary dwelling units in 2023. Most homeowners do not know what their lot allows, and they should not have to.

2. BCIN-certified in-house

The BCIN credential (Building Code Identification Number) is the Ontario Ministry of Municipal Affairs and Housing certification that lets you stamp your own designs as code-compliant for permit submission. It requires passing five Ministry exams and maintaining ongoing professional development.

Most Ottawa GCs do not have it. They contract out the design and code-compliance work to a third-party BCIN designer or architect. That works, but it adds friction: the designer drew the plan, the GC has to build it, and the homeowner is in the middle when the two disagree about details.

We carry BCIN in-house. The designer drawing your plan is the same firm that will build it. When the framer hits a beam location that needs to shift two inches, the change happens on a phone call, not in a five-day round trip through three offices.

Why BCIN matters in Ottawa specifically

Ottawa's permit volume is high enough that the city's plan reviewers are sharp. Drawings that meet the bare minimum get rejected and returned with comments. Drawings that are detailed, proper, and from a known submitter (the city's plan reviewers see our submissions weekly) move faster.

We have permits issued in 4 to 6 weeks on jobs where homeowners doing it alone wait 12 to 16 weeks. The BCIN is partly about quality, partly about reputation with the reviewers.

3. Our in-house cabinet shop

We build cabinets in-house in our Ottawa-area shop. Not subcontracted to a third party, not flat-pack from a catalogue. Real custom cabinetry, fabricated to the exact dimensions of your room, with our crew, from our suppliers.

Why this matters:

The trade-off: our cabinet pricing is mid-tier, not budget-tier. We are not the cheapest cabinet supplier in Ottawa. We are not trying to be. We compete on fit, finish, and durability, not on price-per-linear-foot.

4. Fixed-price contracts

Our contracts are fixed-price, not cost-plus. The price you sign is the price you pay, barring genuine scope changes (you decide to add a bathroom we did not quote, the city demands a structural change at permit, an existing condition was hidden behind a wall and could not have been quoted).

Cost-plus is the default model in residential renovation, particularly on larger jobs. It puts all the cost risk on the homeowner. Time over-runs, material over-runs, mistakes by subs, all flow back to the homeowner's invoice. Cost-plus is fine if your contractor is honest and the homeowner is sophisticated. In our experience, neither condition holds in most Ottawa residential jobs.

Fixed-price puts the risk on us. If we mis-estimate, we eat it. That forces our quoting process to be careful: we do site measures, we verify behind-the-wall conditions where possible, we build contingency lines into the price (typically 8 to 12 percent), and we sign a contract that says what it costs.

Fixed-price is harder to quote and slower to issue. We typically take 2 to 3 weeks to issue a fixed-price quote on a kitchen or bathroom, and 4 to 6 weeks on a whole-home or addition. The homeowners we work with prefer that wait to the open-ended risk of cost-plus. If you do not, we are probably not the right fit.

5. The layered warranty

Most contractors offer a one-year warranty on their workmanship. That is the legal floor. We do that, plus more.

The reason this is layered is that different parts of a renovation have different failure modes. Workmanship issues show up in the first 12 months. Cabinet construction issues are typically a 5-to-15 year window. Structural issues, when they happen, show up in years 3 to 8. The warranty matches when problems actually appear.

The single most useful question a homeowner can ask a contractor is what happens five years after the project finishes. If the answer is vague, the contractor does not expect to be in business that long. If the answer is specific, you know what you are buying.

6. The honest comparison to the traditional GC model

The traditional Ottawa GC model works like this. Homeowner hires a designer (architect or BCIN designer) to draw plans. The designer's fee is a separate line item that scales with the scope of the drawings. Plans go out to bid. Three GCs quote the same drawings.

Homeowner picks one (often the lowest, which is usually the wrong call). GC builds. Designer is involved for site visits but not in daily decisions. Subs are managed by the GC. Cabinets, counters, and finishes are sourced from third-party suppliers.

That model has real strengths:

That model also has real weaknesses, which we built our model to fix:

The design-build model we use compresses all those parties into one firm. Single contract, single point of contact, single warranty. Less friction, less finger-pointing, faster decisions.

Where our model does not fit

We are not the right contractor for everyone. Specifically:

Where to start

Most Ottawa homeowners are mid-flight on their decision when they reach out, not at the very beginning. Common entry points: they have a rough idea of what they want, they have a budget range, and they want to know if it is feasible and roughly what it will cost.

The 48-hour feasibility review is the right starting point for almost everyone. Free, fast, and it answers the questions that should come before drawings. After that, our home renovation page covers the design phase, and our project estimating page covers how the fixed-price quote gets built. Read those, then call us at 613-862-4555 if it sounds like a fit. We answer our own phone.

Frequently asked questions

What should a lot feasibility review check before a renovation is quoted?

A lot feasibility review should check zoning, setback requirements, lot coverage, height restrictions, and any heritage or floodplain constraints before a renovation is quoted. The review answers whether an addition fits the building envelope, whether a basement can legally become a secondary suite, and whether a coach house is allowed on the lot.

Skipping the review can mean a deposit paid and drawings started for an addition that is not legal, discovered only when the permit is rejected months later.

What is the difference between a fixed-price and a cost-plus renovation contract?

A fixed-price renovation contract sets the price at signing, and the homeowner pays that price unless the scope genuinely changes. Genuine changes include an added room, a structural change the city demands at permit, or a hidden condition behind a wall.

A cost-plus contract passes time overruns, material overruns and subcontractor mistakes back to the homeowner's invoice. A fixed-price quote typically builds in a contingency line of 8 to 12 percent to carry that risk.

How does design-build differ from hiring a designer and a general contractor?

Design-build puts design and construction in one firm, with a single contract and one point of contact. In the traditional model, a homeowner hires a designer to draw plans, bids those plans to three general contractors, and often picks the lowest.

That model has real strengths: bid competition, a designer who represents the homeowner, and specialist heritage knowledge. Its weakness is that site detail decisions become arguments between separate parties, and the homeowner ends up mediating.

When is a design-build firm the wrong choice for a renovation?

A design-build firm is the wrong choice for heritage projects that need a specialist architect, such as a century-and-a-half-old stone house with original plaster medallions. Design-build also does not suit homeowners who want to bid the same drawings to three contractors, or who want cost-plus with full line-item transparency and have the time and skill to manage it. Small single-room refreshes are usually handled more efficiently by a smaller specialist.

What should I ask a contractor about the years after a renovation?

Ask a contractor what happens five years after the project finishes. A vague answer suggests the contractor does not expect to be in business that long, while a specific answer shows what you are buying. Different parts of a renovation fail on different timelines.

Workmanship issues show up in the first 12 months, cabinet construction issues typically in a 5 to 15 year window, and structural issues, when they happen, in years 3 to 8.

Official references

Ready to talk through your project?

Free 48-hour lot feasibility review. Free in-home consultation. Fixed-price quote. The way we have done it for 20 years.

Start the Conversation →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →