Ottawa renovation project estimating — before and after by Dream Touch
PROJECT ESTIMATING

Free Ottawa renovation estimate & fixed-price quote.

Site visit, scope review, BCIN-certified design check, written quote that holds for 90 days. No deposit to start.

How estimating works

Five steps from first call to a written fixed-price quote.

1. Free site visit

60 minutes at your home, evenings ok. No deposit, no pressure.

2. Scope sheet

What's in and what isn't, written down before any numbers move.

3. Fixed-price quote

Line-item itemized written quote within 5–10 business days.

4. BCIN feasibility check

Our BCIN-certified designer reviews structural and code questions before contract.

5. Permits, line-itemed

The City of Ottawa permit minimum is $117 plus a per-$1000 building-value formula. We file via MyServiceOttawa and show the fee on your quote.

How we itemize your quote

Most contractors hand you one lump number. We break every renovation into line items so you can see what your money buys, and where it goes, before you sign anything.

01

Demolition & site protection

Removing what's coming out, protecting what's staying, and setting up dust control and disposal.

02

Structural & framing

Any wall removals, new openings, beams, and framing your design requires, reviewed by our BCIN-certified designer first.

03

Permits & inspections

The City of Ottawa permit, filed through MyServiceOttawa, plus every inspection your scope calls for. Shown as its own line.

04

Rough-ins: electrical, plumbing, HVAC

The work behind the walls, coordinated so the trades don't collide and nothing gets missed before drywall.

05

Finishes & fixtures

Flooring, tile, cabinetry, paint, and fixtures, priced to a clear allowance so your selections stay transparent.

06

Project management

Your single point of contact, scheduling, trade coordination, and site supervision from first day to final walkthrough.

07

Cleanup, dump fees & warranty

Final cleanup, disposal, and the 1-year workmanship warranty, all included.

Every line is spelled out in plain language before you sign. No lump sums, no vague "labour & materials," and no surprise change orders unless you change the scope yourself.

What’s in the price

Demolition, structural work, all permits, all rough-ins, all finishes you select up to the allowance, project management, dump fees, taxes, and the 1-year workmanship warranty. No surprise change orders unless you change the scope yourself.

What our quotes hold for

90 days. Material price changes between quote and start hit the allowance, not your contract price.

What clients value about our estimates

Representative of the feedback Ottawa homeowners give us about the estimating process itself: itemized quotes, no deposit, and no pressure.

The quote was itemized down to the last fixture. For the first time I actually understood what I was paying for.

Dream Touch estimating client

No deposit, no pressure, and they showed up on time for the site visit. That alone put them ahead of everyone else we called.

Dream Touch estimating client

I took their written quote to two other contractors to compare. Nobody else broke it down line by line like this.

Dream Touch estimating client

Sample feedback shown to illustrate the themes clients raise most often about our estimating process; not attributed to a specific individual.

Where we estimate

  • Ottawa proper (Centretown, ByWard Market, Sandy Hill)
  • Kanata, Orleans, Nepean, Barrhaven, Stittsville, Manotick
  • Urban neighbourhoods: Glebe, Westboro, Old Ottawa South, Hintonburg
  • Outside this radius, call us for availability and travel terms; we also travel for larger job estimates with any fee disclosed before the visit.

We estimate the work we build ourselves as a renovation contractor in Ottawa: kitchens, bathrooms, basements, additions and commercial fit-outs.

BCIN + permits

We are BCIN-certified and the same team that draws your architectural plans also pulls your City of Ottawa building permit. The City of Ottawa's permit fee starts at $117 and scales with construction value through the MyServiceOttawa portal. We line-item the fee on your quote so it's visible up front.

Request your free estimate

Tell us the basics and we'll bring the rest to your site visit. When you hit request, we'll open the full quote form with your details already filled in. No deposit, no obligation.

FAQ

How long does an estimate take?

Site visit within 2 to 3 business days. Written quote within 5–10 business days after the visit.

Is the design free?

The site visit and the initial scope sheet are free. Detailed BCIN-stamped drawings are line-itemed in the quote and credited toward construction if you sign.

What if I want a second opinion?

Get one. Bring our quote to another contractor and compare line items. Most contractors don't itemize. We'd rather you sign with confidence.

Do I need a permit?

Most Ottawa renovations bigger than cosmetic do. We tell you on the site visit and pull the permit through MyServiceOttawa as part of the contract.

Do you charge for the site visit?

No. The site visit and the initial scope sheet are free, with no deposit and no obligation to move forward.

What areas do you estimate in?

Ottawa proper and the surrounding communities: Kanata, Orleans, Nepean, Barrhaven, Stittsville, and Manotick, plus urban neighbourhoods like the Glebe, Westboro, Old Ottawa South, and Hintonburg. Outside that radius, call us for availability and travel terms.

How is your quote different from a typical contractor's?

We itemize. Most contractors hand you one number; we break the price into demolition, structural, permits, rough-ins, finishes, project management, and warranty, so you can see exactly what you're paying for and compare line by line.

What happens after I approve the quote?

We confirm the scope sheet, lock in your start date, pull the City of Ottawa permit through MyServiceOttawa, and order any long-lead materials. You get a single point of contact from the first day to the final walkthrough.

Can you work from my own drawings or my designer's plans?

Yes. If you already have drawings, we estimate directly from them. If you don't, our BCIN-certified designer can prepare the drawings your permit requires.

Is there any obligation after the estimate?

None. The written quote is yours to keep and compare. There's no deposit to receive it and no pressure to sign.

Book your free Ottawa site visit.

Free 60-minute consultation, written fixed-price quote within 5–10 business days, no deposit. We cover Ottawa, Kanata, Orleans, Nepean, Barrhaven, Stittsville, Manotick, and the urban core.