← All articles
Design Inspiration

Stittsville kitchen before and after: same layout, money spent well

Sep 3, 2025 · 6 min read · By Dream Touch Renovations Ottawa

Before & After: A Stittsville Kitchen Refresh on a Tight Budget
← All articles

This Stittsville kitchen renovation kept its layout. The sink, range, fridge and walls stayed where they were, so the budget went into plywood cabinets, quartz counters and lighting instead of new plumbing, a moved gas line and a building permit. Five weeks later the owners had 28 percent more storage and 14 percent more counter.

The house is a 2002 Stittsville two-storey off Carp Road, and the kitchen was a builder special: honey oak cabinets, laminate counters, white appliances and a fluorescent boob light. The owners came with a tight, fixed budget and we finished comfortably inside it. The layout worked. The finishes were tired.

What keeping the layout meant in this kitchen

The kitchen was a U-shape with an island. The sink sat under the window, the range on the back wall, and the fridge in the run beside the pantry. The plumbing was where it needed to be, and the gas line for the range was already at the back wall.

Moving any of those three means real rough-in work: opening walls and floors, rerouting supply and drain lines, and booking inspections. That money comes straight out of the cabinet and counter budget, and the owners would have ended up with the same kitchen feel and less to spend on finishes that last. We told them so on the first walkthrough.

The cheapest kitchen renovation is the one where you do not move plumbing, gas, or load-bearing walls. Spend that saved money on cabinets and counters that actually last.

That one decision is what separates a refresh like this from a full kitchen renovation in Ottawa, where walls come out and the sink, range or island move to new spots.

Why the layout decides the permit and the inspections

The City of Ottawa lists replacing kitchen or bathroom cabinets as work that needs no building permit, provided the plumbing fixtures remain in the same location. Exempt work must still meet the Ontario Building Code and the Zoning By-law, and designated heritage buildings are not covered by the exemptions.

The City's permit list starts where this kitchen stopped:

Wiring runs on a separate track. The Electrical Safety Authority (ESA) says electrical work in a home is done by a licensed electrical contractor, or by the homeowner or occupant, with every required notification filed with ESA. A new under-cabinet circuit like the one in this kitchen is ESA work, whatever the City's list says.

Cabinets: where most of the money went

Cabinets were the single largest line on this kitchen — supply plus our in-house install. On a budget refresh that keeps the layout, this is where the bulk of the spend belongs.

People shopping a budget kitchen often price IKEA or big-box stock cabinets first. They trim a modest amount on the boxes and give up a far larger slice of perceived value the day they sell the house. We specified semi-custom from a Canadian shop we have used for nine years:

The same kitchen in IKEA Sektion would have cost noticeably less to supply. Looks similar at install. Looks meaningfully worse at year five and worse again at year ten, because the box-edge banding peels and the hinges sag. The cheaper box is the more expensive decision over the life of the kitchen.

If the boxes are sound and only the doors look tired, cabinet refacing is the other route. This kitchen needed drawer bases on the bottom run and uppers to the ceiling, which new boxes give and refacing does not.

Counters: 2 cm quartz with a built-up edge

The counters are quartz, not granite or laminate. The colour is Caesarstone London Grey, a soft veined white that reads modern without being so trend-specific that it dates fast.

The slab is 2 cm with a built-up edge, so it reads as 3 cm at the front. That trims real cost against a solid 3 cm slab and is invisible to anyone not measuring it. The owners did not know the difference until we told them.

Counters, supplied and installed with the 36 by 84 inch island slab, were a mid-weight line on the budget. Material grade and edge detail are what move that line, as our guide to countertop costs explains.

The 2cm with build-up trick

3cm slabs cost more to fabricate, ship, and install. 2cm slabs with a 1cm strip glued underneath the front edge create a 3cm visible edge for less material cost. Done well, you cannot tell. Done badly (visible glue line, mismatched seam), you can. Ask to see a sample of the fabricator's build-up edge before you commit.

Appliances: where to spend and where to hold back

The owners bought their appliances directly in a Boxing Day sale, which beat our trade pricing. Our advice on dividing the package: spend on what you touch every day, and hold the line everywhere else.

The owners wanted Wolf or Sub-Zero, and we said no. A pro-grade range and a built-in fridge belong in a high-end kitchen designed around them. On a tight budget they would have eaten the whole package and left nothing for cabinets, counters, lighting or backsplash.

Backsplash, lighting and the small pieces

This is where a budget kitchen either earns back its cost in feel or quietly looks cheap. The line items:

The backsplash is the piece owners mention afterwards. In a different kitchen we renovated, loma wrote in a Google review on 2024-03-24: "Our kitchen was transformed from bla to wow! I especially am in love with the custom backsplash."

How the budget was split, line by line

Every owner gets a detailed written breakdown before work begins. These are the scope lines on a layout-keep refresh like this one, roughly in order of how much each drives the budget:

The biggest swing factors on a refresh like this are the cabinet grade, the counter material, and whether any plumbing, gas or wall moves. Each one is itemized, so the written proposal matches the scope you actually want.

The before and after, by the numbers

Beyond the visuals, three measurable things changed in this kitchen:

What the homeowners did during the 5-week build

The kitchen was completely out of service for 4 of the 5 weeks. The owners set up a temporary kitchen in the dining room: a folding table, the existing fridge plugged into a hallway outlet, a kettle, an Instant Pot, and a toaster oven.

They ate out twice a week, leaned on the slow cooker, and ordered takeout once a week. The extra food spend over those five weeks was modest.

The single best thing they did was move the dishwasher out before demo and run it as a temporary in the laundry room with a portable countertop dishwasher hookup. That meant no plates piling in a bathroom sink. A few dollars for the adapter set. Worth every penny.

The honest takeaway for tight budgets

If you are in a 1990s or early-2000s Stittsville, Barrhaven, Findlay Creek, or Orleans home with a tired kitchen that has a working layout, a disciplined budget can give you a kitchen that looks and feels far above what you spent. The trick is:

Keep the layout. Buy plywood cabinets, not particle board. Spend on the appliance you use most. Save on the appliances you barely use. Pick finishes that read clean rather than trendy. Do the work in a single contiguous block, not a slow drip of weekend projects.

When the layout has to change

A refresh works when the layout already works. When the sink is on the wrong wall, the island blocks the path, or a wall cuts the kitchen off from the dining room, the job becomes a full kitchen: new plumbing, a building permit, inspections, and a design drawn before anything is ordered.

Dream Touch's portfolio describes one in Manotick in 2024: a full open-concept kitchen transformation with a wall removed, an island and premium finishes. A job like that is planned by one design-build team from drawings and the City permit to the final finish, with the layout shown in 3D renderings and a written, fixed-price contract before work starts.

For the rest of a Stittsville house, our page for a renovation contractor in Stittsville covers basements, bathrooms and additions there. The Stittsville bathroom and septic guide covers the bathroom permit and the septic question on rural lots.

To walk through your own kitchen, call (613) 862-4555 for a free design consult and a fixed-price quote, or read how a full kitchen renovation runs from design to final inspection.

Frequently asked questions

Do new kitchen cabinets need a City permit?

New kitchen cabinets need no building permit when the plumbing fixtures stay in the same location. The City of Ottawa lists replacing kitchen or bathroom cabinets as exempt on that condition. Moving the sink, adding or removing a wall, or enlarging a window or door puts the job on the permit list. A new circuit for under-cabinet lights is separate: Electrical Safety Authority work, with a notification filed.

Should the sink or range move in a budget kitchen?

On a tight budget, keep the sink, range and fridge where they are. Moving any of those three means rough-in work: opening walls and floors, rerouting supply and drain lines, and new inspections. Plumbing changes beyond replacing existing fixtures also need a City building permit. That money comes out of the cabinet and counter budget, which is where a refresh gets its value.

Are plywood cabinet boxes better than particle board?

Plywood boxes outlast particle board and MDF. A 3/4-inch plywood box holds screws, carries heavy stoneware and survives a slow leak under the sink without swelling. Flat-pack boxes look similar at install, then worse by year five and again by year ten, as the edge banding peels and the hinges sag. The cheaper box is the more expensive choice over the life of the kitchen.

Can a 2 cm quartz counter look like 3 cm?

Yes, with a built-up edge. The fabricator glues a 1 cm strip under the front edge of a 2 cm slab, which shows a 3 cm edge while using less material than a solid 3 cm slab. Done well, nobody can tell. Done badly, a glue line or a mismatched seam shows, so ask to see a sample of the fabricator's built-up edge before committing.

How long is a kitchen out of use during a refresh?

On this 5-week Stittsville refresh, the kitchen was completely out of service for 4 of the 5 weeks. The owners set up a temporary kitchen in the dining room with a folding table, the old fridge on a hallway outlet, a kettle, an Instant Pot and a toaster oven. Moving the dishwasher to the laundry room on a portable hookup kept dishes out of the bathroom sink.

Official references

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →