Home addition in Ottawa by Dream Touch Renovations
Ottawa Home Additions · Second Storey · Rear · Side · Dormer

Ottawa home addition contractor.
Build up. Build out. Build smart.

Every type of home addition Ottawa homeowners need: second-storey additions, rear extensions, bump-outs, garage conversions and in-law suites across Nepean, Barrhaven, Kars, Kanata, Orleans, and Westboro. One team designs, permits and builds it, on a fixed-price contract with a written timeline. Free 48-hour lot feasibility review.

Dream Touch Renovations builds home additions in Ottawa — BCIN-certified, insured, and completing projects across the city since 2004.

Call 613-862-4555
BCIN-Certified
One team designs, permits, builds
Fully Insured & WSIB
Liability + workplace coverage
Fixed-Price Contracts
Price locked before start
Since 2004
20+ years in Ottawa
500+
Ottawa projects delivered
48hrs
Free feasibility turnaround
20+ yrs
Building additions since 2004
98%
On-time completion rate
Free feasibility
48-hour turnaround.
Permits + drawings
In-house engineering.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.
Ottawa's home addition specialists since 2004

Why Ottawa homeowners choose Dream Touch Renovations for home additions

Who builds home additions in Ottawa? Dream Touch Renovations does. We design, permit and build second-storey, rear, side, bump-out and dormer additions across Ottawa with our own crew, on a fixed-price contract with a written timeline.

We are BCIN-certified, draw the plans in-house and offer a free 48-hour lot feasibility review. Call 613-862-4555 to start with your lot.

Dream Touch Renovations has been the home addition contractor Ottawa families have trusted since 2004, with more than 500 completed projects across Barrhaven, Kanata, Orleans, Westboro, Nepean, Manotick, and every neighbourhood in between. As a Licensed Ontario General Contractor, fully insured for new-build components, Dream Touch delivers fixed-price contracts and a 98% on-time rate, backed by written delivery dates in every agreement.

For homeowners looking for an addition builder they can rely on, that track record is the foundation we build on.

Second storey, rear, side, bump-out and dormer additions

We build the five categories of Ottawa home additions homeowners most commonly need: second storey addition Ottawa projects that transform bungalows into full two-storey homes; rear addition Ottawa extensions that expand kitchens, family rooms, and primary suites into the backyard; side addition Ottawa projects for narrow urban lots in the Glebe, Westboro, and Hintonburg; bump out addition Ottawa work for targeted four-to-eight-foot expansions of existing rooms; and dormer addition Ottawa solutions for 1.5-storey homes that need attic bedrooms without expanding the footprint.

Every home extension Ottawa we build is designed in-house with full architectural plans and constructed by our own crew.

Our advantage is local knowledge. We know which Ottawa lots qualify for which additions, where lot-coverage limits and setback minimums apply, and how the Committee of Adjustment variance process works. We know the Ontario Building Code and work with the City of Ottawa's building permit system daily, which is how we can offer a free 48-hour lot feasibility review and fixed-price contracts.

See our Bill 23 Guidance page for the new multi-unit provisions, or our Financing options to see how Ottawa homeowners fund their additions.

The Ottawa math

Why more Ottawa homeowners are building additions instead of moving

In a tight Ottawa resale market, building a home addition Ottawa is often a better use of budget than moving into a larger home. Here are the two paths side by side.

A. What moving up costs you
Realtor commission on your saleLost
Land transfer tax (ON + Ottawa)Added
Legal, staging, moving, closingAdded
Premium for a larger homeMarket rate
Disruption: months of showings-
New neighbourhood, schools, commuteReset
B. What adding on gives you
Space tailored to your familyBuilt in
Design, permits, engineeringIncluded
Keep neighbourhood, schools, commute-
Keep your existing mortgage rate-
Disruption: families stay in place-
One fixed written proposalUp front
C. The result
Keep your
community
and avoid the cost of moving up
Added square footage and equityGained
Community, neighbourhood, lifestylePreserved
Transparent, itemized proposalBefore work begins
Before and after

Drag the handle to reveal before and after.

Home addition Ottawa after second-storey construction Before After
Every type of Ottawa home addition

Find the right addition for your home and lot.

The right Ottawa addition depends on four factors: lot shape, existing home structure, budget, and the new space you need. Dream Touch builds all six common Ottawa addition types. Second-storey additions dominate bungalow neighbourhoods like Alta Vista, Carlington, and Bells Corners. Rear additions are most common in suburban Ottawa, including Barrhaven, Kanata, Orleans, Findlay Creek and Stittsville.

Side additions are the usual choice in older central Ottawa, especially the Glebe, Westboro, Hintonburg, Centretown, Sandy Hill and New Edinburgh. Every Dream Touch house addition Ottawa project starts with a free feasibility review to confirm which type your lot supports.

Second Storey Addition

Add a full second floor to a bungalow or single-storey home. Ottawa's highest-impact addition, it typically doubles living space and adds 20–30% to home value. Most common in Alta Vista, Carlington, Riverside, and Bells Corners bungalow neighbourhoods.

Largest scope · full structure Timeline: 16–20 weeks Additional Footprint: 800 - 1,000 Sq Ft Most common in Alta Vista · Bells Corners · Riverside

Rear Addition Ottawa

Extend the back of your home for a new kitchen, family room or primary suite. Ottawa's most popular addition type, and a good fit when the backyard has room to spare. Common in Barrhaven, Kanata, Orleans, and Manotick.

Mid scope · new foundation Timeline: 12–14 weeks Additional Footprint: 350 - 475 Sq Ft Most common in Barrhaven · Kanata · Orleans · Manotick

Side Addition Ottawa

Build out to the side when the rear yard is shallow or the front is restricted. Common in older central Ottawa neighbourhoods with narrow lots like the Glebe, Westboro, Hintonburg, Centretown, Sandy Hill, New Edinburgh, and Rockcliffe.

Mid scope · narrow-lot build Timeline: 11–14 weeks Additional Footprint: 300 - 425 Sq Ft Most common in Glebe · Westboro · Hintonburg · Sandy Hill

Bump-Out Addition Ottawa

A small, targeted extension, typically 4–8 feet, to expand a kitchen, bathroom, or bedroom without a full addition. Ottawa's fastest and most affordable addition option. Popular in Nepean, Vanier, Gloucester, and Overbrook.

Smaller scope · targeted extension Timeline: 8–10 weeks Additional Footprint: 160 - 270 Sq Ft Most common in Nepean · Vanier · Gloucester · Overbrook

Garage Conversion Ottawa

Convert your existing garage into a bedroom, home office, gym, or in-law suite. There is no foundation work, so it costs much less and finishes fastest. Popular across Ottawa, especially where lot coverage limits prevent expansion.

Smallest scope · no foundation Timeline: 5–7 weeks Additional Footprint: 400 - 500 Sq Ft Popular across Kanata · Barrhaven · Orleans · Nepean

Dormer Addition Ottawa

Raise a dormer to add usable space within your existing attic footprint. It suits Ottawa's many 1.5-storey homes in Centretown, Sandy Hill, Hintonburg, and Westboro, and adds bedrooms without expanding the footprint.

Smaller scope · within roofline Timeline: 8–12 weeks Additional Footprint: 400 - 560 Sq Ft Common in Centretown · Sandy Hill · Hintonburg · Westboro
Recent Ottawa additions

Built across Ottawa and Nepean.

Every home addition Ottawa project Dream Touch has completed since 2004 was designed, permitted, and built by our team. Here are three recent projects. View full portfolio →

View Full Portfolio →
Modern rear addition Ottawa Westboro Ross Avenue
Ross Avenue · Westboro · 2024
Ross Avenue · Westboro · 2024

Contemporary Rear Addition

  • Sleek minimalist lines
  • Expansive south-facing windows
  • Open-concept kitchen + family room merger
  • Engineered hardwood throughout
Heritage home addition Ottawa Centretown downtown
Centretown · Downtown Ottawa · 2023
Centretown · Downtown Ottawa · 2023

Heritage-Blending Addition

  • Architectural integrity preserved
  • Seamless old-to-new material transitions
  • Committee of Adjustment variance secured
  • Modern mechanicals integrated
Custom second-storey addition Ottawa Manor Park Camelia
Camelia Avenue · Manor Park · 2024
Camelia Avenue · Manor Park · 2024

Architectural Feature Addition

  • Striking contemporary envelope
  • Energy-efficient building envelope
  • Designed for growing family
  • Custom window package
Flagship case study

Ross Avenue, Westboro. Designed first, built right.

Ross Avenue home addition in Westboro, Ottawa — finished build by Dream Touch Renovations Design Built

The in-house SketchUp design render fades into the finished build, which one Dream Touch team designed, permitted, and constructed.

A contemporary rear addition that merged a cramped kitchen and family room into one open, south-facing living space. It is one of the award-winning Ottawa additions in our portfolio.

Project scope
  • Contemporary rear addition · Westboro · 2024
  • Open-concept kitchen and family-room merger
  • Expansive south-facing window package
  • Engineered hardwood throughout
  • Clean, minimalist exterior matched to the existing home
How it was built
  • Feasibility & design
    Free 48-hour lot feasibility, then in-house architectural drawings and a SketchUp 3D model approved before any pricing.
  • Permits & engineering
    Building permit filed through MyServiceOttawa with structural engineering, and a fixed-price contract signed before the first shovel.
  • Construction
    Foundation, framing, systems, and finishes completed by our own crew, with siding, windows, and roofline matched to the existing house.
  • Inspection & handover
    Municipal inspections passed, a walkthrough with the project manager, and a 1-year workmanship warranty on the completed addition.
Case study · Second-storey addition

A bungalow becomes two full storeys.

Illustrative example
Ottawa bungalow after gaining a full second storey, representative of Dream Touch Renovations second-storey additions Before After

An illustrative before-and-after of a typical bungalow-to-two-storey conversion. It represents the second-storey additions we design, permit, and build, and is not a specific client project.

Many Ottawa families use a second-storey addition to double their floor area without leaving their neighbourhood. This walkthrough is a representative example of how Dream Touch takes a single-storey home to two full storeys on the same lot, and it is roughly the path every second-storey project follows.

Typical scope
  • Full second storey built over the existing footprint
  • New primary suite plus additional bedrooms upstairs
  • Existing roof removed and rebuilt to the new rooflines
  • Foundation and framing reviewed and sized by a structural engineer
  • Whole-home electrical, plumbing, and HVAC extended and brought up to current code
  • Siding, windows, and trim blended so old and new read as one house
How a second storey gets built
  • Feasibility & design
    Free 48-hour lot feasibility to confirm height and coverage, then in-house architectural drawings and a SketchUp 3D model approved before any pricing.
  • Permits & structural engineering
    Building permit filed through MyServiceOttawa with structural engineering for the new floor loads, plus a Committee of Adjustment minor variance if height or coverage requires one.
  • Roof removal & framing
    The existing roof comes off and the new second-floor structure is framed to the engineered drawings and the Ontario Building Code, with the home weather-protected throughout.
  • Systems & finishes
    Electrical, plumbing, and HVAC are run to the new floor, then insulation and interior and exterior finishes are completed and blended to the existing home.
  • Inspections & handover
    Municipal inspections are passed, the project manager walks the finished floor with you, and the addition carries a 1-year workmanship warranty.
Zoning · By-Law 2008-250 · Lot Coverage · Setbacks

Can you build a home addition on your Ottawa property?

Not every Ottawa lot suits every addition type. Before any home addition Ottawa project begins, Dream Touch's free feasibility review confirms what you can build, before you spend anything on design.

Ottawa's zoning by-law 2008-250 controls every residential addition in the city. Most Ottawa lots fall into one of four residential zones: R1 (detached), R2 (detached + duplex), R3 (townhomes + low-rise), or R4 (multi-unit). Each zone sets its own rules for maximum lot coverage, setbacks from property lines, building height, and permitted uses.

Most Ottawa suburban lots in Barrhaven, Kanata, Orleans, Nepean, Stittsville, Findlay Creek, and Riverside South qualify for a full home addition under current zoning. Older central neighbourhoods like the Glebe, Westboro, Hintonburg, Centretown, and Sandy Hill often need a minor variance, which Dream Touch handles.

The five checks in our lot feasibility review

Dream Touch's feasibility review checks five factors on every Ottawa property: (1) lot coverage percentage versus the zone's maximum, typically 35% for R1 and higher for other zones; (2) setback requirements from front, side, and rear lot lines, typically 6m front, 1.2m side, and 7.5m rear; (3) height restrictions, typically 11m maximum for R1/R2; (4) servicing capacity, confirming municipal water and sewer can support added fixtures; (5) parking requirements, ensuring the required minimum off-street spaces are retained.

If any factor fails, we identify the need for a Committee of Adjustment minor variance at the feasibility stage, before you commit to design.

Adding a secondary dwelling unit or coach house with your addition

Ottawa's Bill 23 (More Homes Built Faster Act) provisions now allow up to three residential units on most Ottawa lots. That means you can combine a home addition with a legal secondary dwelling unit, like adding a second-storey for your family while converting the basement into a registered rental suite, or building a rear addition plus a coach home in the backyard.

On the right Ottawa property, that can bring in monthly rental income on top of the addition's home-value lift. See our Coach Houses page for backyard options, or Bill 23 Guidance for the legal framework.

The Dream Touch process

From first sketch to final walkthrough: ten steps, one team.

Every Dream Touch home addition Ottawa project follows the same ten-step process, refined over 20 years of Ottawa projects, with written commitments at every milestone.

  1. 1
    60 minutes · Free

    Initial Consultation & Site Visit

    We walk your site, discuss goals and budget, and record existing conditions. No obligation, no deposit.

  2. 2
    48 hours · Free

    Lot Feasibility & Zoning Review

    Dream Touch's permits team pulls your property's zoning, checks lot coverage, setbacks, and servicing. If you need a variance, we flag it at this step.

  3. 3
    3–6 weeks

    Design Package Development

    In-house architects and designers create detailed architectural drawings, 3D renderings, and material specifications aligned with your budget and lifestyle.

  4. 4
    1–2 weeks

    Fixed-Price Contract

    Line-item costing across materials, labour, permits, and contingency. You approve the written, fixed-price budget before any construction.

  5. 5
    4–10 weeks

    Permit Applications

    Building permit, trade permits (electrical, plumbing, HVAC), structural engineering, and any Committee of Adjustment variance hearings, all filed and managed by Dream Touch.

  6. 6
    1–2 weeks

    Site Preparation & Excavation

    We protect existing structures, landscaping, and utilities, and set proper grading and drainage.

  7. 7
    2–4 weeks

    Foundation & Framing

    Footings, foundation walls, and framing to engineered drawings and Ontario Building Code standards.

  8. 8
    2–3 weeks

    Systems Installation

    Electrical rough-in, plumbing, HVAC ducting, and insulation, all coordinated with licensed trades and inspected.

  9. 9
    4–6 weeks

    Interior & Exterior Finishes

    Drywall, flooring, trim, siding, roofing and windows, all matched to your existing home.

  10. 10
    1 week

    Final Inspections & Handover

    Municipal inspections scheduled and passed. Walkthrough with project manager. Warranty documents, keys, and care guide delivered.

Transparent pricing

Home addition cost Ottawa: what drives your number.

Dream Touch offers fixed-price contracts signed before permits are pulled. The three scope tiers below show what is included at each level. Your number depends on addition type, square footage, finish level, structural complexity, and site conditions, and you receive a detailed written breakdown before any work begins.

Compact Scope

Bump-outs, garage conversions, sunrooms
  • Up to 300 sq ft of new space
  • Full design and permit package
  • Exterior siding, roofing, and windows matched to existing home
  • Standard electrical and HVAC tie-in
  • Builder-grade finishes, upgradeable
  • 1-year workmanship warranty
Best for: Expanding a cramped kitchen, adding a home office, converting garage to living space, adding a sunroom for three-season living.

Second Storey Scope

Full second-storey additions and major structural expansions
  • 1,000+ sq ft of new space (often doubling home size)
  • Complete architectural and structural engineering package
  • Foundation reinforcement if required
  • Full roof removal and rebuild
  • Temporary housing coordination (typically 2–4 weeks)
  • Premium finish specification
  • Smart home wiring and modern mechanical systems
  • 10-year structural warranty
Best for: Transforming a bungalow into a full two-storey home, adding 3–4 bedrooms and a second bathroom, creating a primary suite on a new second floor.
What moves the cost · Ontario · Ottawa

What does a home addition cost in Ottawa and Ontario?

What makes an addition cheaper or dearer. Your own number comes from the written, fixed-price contract in step 4 of the process above.

Reno Quotes, a Canadian renovation quote service, lists in its 2026 house extension cost guide (updated 2026-09-10) development charges, utility upgrade fees, landscaping restoration and temporary accommodation among the items a quote usually excludes, and it budgets permits, drawings and engineering together at 10% to 20% of the total.

It also notes that the price per square foot drops as an addition gets bigger, which matches how our home addition cost guide ranks the five addition types we build.

What is the cheapest way to add an addition to my house?

Convert space the house already encloses. Our cost guide ranks a garage conversion as the most efficient addition per square foot, because the foundation, roof and walls are already paid for. In Ottawa the catch is the floor: a garage slab slopes to the door and has no insulation under it, so it gets built up with sleepers and foam, or torn out and re-poured.

If you need new footprint, the smallest bill is a bump-out. Per foot it is the priciest type, since the footing, roof and tie-in cost about the same however small the room is. Reno Quotes names two choices that cut the cost of any addition: a rectangular footprint under a simple roof, and new bathrooms placed near the existing plumbing.

What is the most expensive part of a home addition?

Framing and finishes, roughly level with each other. The budget breakdown Reno Quotes publishes (credited to M.A. Structures inc.) gives framing and structural upgrades 20% to 25% and interior finishes another 20% to 25%. Mechanical systems take 15%, the foundation 10% to 15%, design and engineering 5% to 10%, and permits and municipal fees 2% to 5%.

The existing house is where budgets break. Our cost guide names cutting into the exterior wall and tying in the new structure as typically the most expensive single line in a side addition. On a second storey the whole roof comes off and the foundation needs an engineer's check, sometimes underpinning. Reno Quotes calls foundation upgrades to the existing house the most common budget surprise.

Zoning By-law 2026-50 · Ontario Building Code · Permits

Four rules that set an Ottawa home addition's size, cost and schedule.

Zoning limits how close an addition can get to your lot lines. The Ontario Building Code decides how deep it sits and how long the City has to rule on your permit.

Setbacks and lot coverage: which zoning by-law applies in 2026

Setbacks, lot coverage and height limits come from the City of Ottawa's zoning by-law, and that by-law changed this year. City Council enacted Zoning By-law 2026-50 on 2026-03-11 to replace By-law 2008-250. On 2026-07-02 the Ontario Land Tribunal let the parts outside 25 appeals take effect, backdated to 2026-03-11.

For the provisions still under appeal, the City says the more restrictive rule of the two by-laws applies until the appeals are decided (City of Ottawa, New Zoning By-law).

A setback figure from a checklist written before 2026 may not be the one your lot is held to, so read your zone under both by-laws before paying for drawings. An addition that breaks a setback or coverage limit needs a minor variance from the Committee of Adjustment.

Until it has one, section 8(2) of Ontario's Building Code Act, 1992 bars the City from issuing a permit for work that contravenes the zoning by-law.

Frost depth: how deep an Ottawa addition's foundation goes

The 2024 Ontario Building Code (O. Reg. 163/24, in force since 2025-01-01) sets minimum foundation depths in Table 9.12.2.2. In clay, or soil that is not clearly defined, a foundation around a heated basement or crawl space goes at least 1.2 m below finished ground. Where the space inside is unheated, or the footings are insulated, it goes at least 1.2 m and never shallower than frost penetration.

The code leaves frost depth itself to local experience (Division B, Article 1.1.3.2), and the City of Ottawa's sample sundeck drawing shows 5 ft (1.5 m) from finished grade to the underside of a footing.

Depth alone does not stop heave in Ottawa clay. National Research Council researchers measured up to about 2,700 kg of uplift on steel columns set 1.5 m deep in Leda clay on NRC land in Ottawa, and concluded that footings below frost depth are still not stable if the soil freezes to the foundation wall (Penner and Irwin, Canadian Geotechnical Journal, 1969).

The soil against a new foundation wall matters as much as how deep the footing sits.

Second storey additions: why the existing footings get an engineer's review

Table 9.15.3.4 of the same code sets the minimum strip footing under an exterior wall of a light wood-frame house (joist spans up to 4.9 m) at 250 mm wide when it carries one floor and 350 mm when it carries two. A bungalow footing sized for one floor can fall short of the two-floor minimum.

Before a second storey is designed, a structural engineer confirms what the existing footings and walls can carry, so any underpinning is priced into the contract instead of discovered mid-build. More on that review: structural engineering in Ottawa.

Building permit timelines in Ottawa

Once the City has a complete application, Table 1.3.1.3 of the Building Code gives the chief building official 10 business days to issue or refuse a permit for a house where no dwelling unit sits above another.

If the addition puts one unit over another, such as a second-storey rental suite, the limit becomes 15 days. Saturdays and holidays do not count, and the clock starts the day after the complete application goes in.

The code releases the City from that limit in two cases: plans or documents are missing, or the work would contravene another law such as the zoning by-law. The official then has two days to say so in writing.

Step 5 of our process allows 4 to 10 weeks for permits, and the 10-day review is only one part of that: engineering, trade permits and any Committee of Adjustment hearing sit outside it. Our Ottawa building permits page covers the application itself.

Your Ottawa Home Addition: From Free Feasibility to Final Walkthrough

Every Dream Touch project follows a fixed-price, design-build path. Here’s how your addition takes shape:

  • Free 48-hour lot feasibility – We check zoning, setbacks, and frost-depth requirements before you commit a dollar.
  • BCIN-certified team – One team designs, permits, and builds your addition (see our permit guide).
  • Fixed-price contract – The scope and price are locked before we start.
  • One team from start to finish – We design, permit, and build your addition as a single team.
  • 1-year workmanship warranty – Covers workmanship on your addition.

Key takeaway: A home addition in Ottawa depends on frost-depth footings and permit timelines. Our process locks both down before demolition starts.

Schedule 1 · Engineering · Fixed price

How to choose home addition contractors in Ottawa

Five things separate home addition contractors in Ottawa, and you can check every one of them on paper before you sign.

  • Who signs Schedule 1. The City asks for a completed Schedule 1 with every addition permit, naming a BCIN designer, an architect, an engineer or a homeowner exemption (City of Ottawa, Part 9 submission requirements). Ask whose name goes on yours. Our permit drawings are drawn in-house and BCIN-certified.
  • An engineer on second floor additions. Second floor additions put a new storey on footings sized for one. Ask whether a structural engineer checks the existing footings before design or after the roof is off. On our second-storey builds, the structural engineering review comes first.
  • A fixed price and dates in writing. Ask for scope, price and schedule in one signed contract before permits are filed. Ours is a fixed-price contract with written delivery dates.
  • Proof of insurance and a written warranty. Ask for the liability insurance certificate and the warranty terms, not a line on a website. Dream Touch is insured and gives a 1-year workmanship warranty on every addition.
  • Who handles the permit. Applications go to the City online through MyServiceOttawa. Ask whether the contractor files it and answers the City's questions, or leaves that to you. We file and manage the permit, including any Committee of Adjustment variance. Our Ottawa building permits page covers the steps.

A bump out addition gets the same five checks as a full second storey. The job is smaller; the paperwork is not.

Home addition or coach house?

An addition makes the house you live in bigger. A coach house is a second home in the rear yard, with its own kitchen, bathroom and entrance. The question that decides it is who will live in the new space.

  • Build an addition when the room is for your household: a second floor of bedrooms, a larger kitchen at the back, a bump-out for a bathroom.
  • Build a coach house when the space needs its own door: a tenant, a parent, an adult child. In Ottawa's urban area it must run off your house's water and sewer connection (City of Ottawa).
  • Build both when the lot allows it. An addition is part of your house, not a second unit, so it leaves room for a coach house if setbacks and lot coverage still work.

Our coach house builder page covers the City's rules for a backyard unit and the coach homes we build. The free 48-hour feasibility review can look at both options for your lot.

Return on Investment

What's the ROI of a home addition in Ottawa?

Home addition Ottawa ROI depends on two things Ottawa appraisers always assess: net added square footage and material and finish quality. The table shows the share of its cost each addition type tends to recover in resale value, so you can compare types before pricing your own project.

Addition Type
Relative Scope
Resale Value Effect
Effective ROI
Bump-out addition (kitchen/bath)
Smaller
Strong value lift
20–53%
Garage conversion
Smallest
Varies by parking *
–12% / +29% *
Dormer addition (attic bedrooms)
Smaller
Strong value lift
22–56%
Rear addition (500 sq ft)
Mid
Solid value lift
18–38%
Side addition (400 sq ft)
Mid
Solid value lift
14–36%
Second storey addition (1,000 sq ft)
Largest
Largest value lift
20–48%
In-law suite addition
+ potential ongoing rental income
Mid
Value lift + income
26–51%

* Note: Garage conversion ROI varies significantly based on whether removing the garage reduces parking in a zone with street-parking restrictions. Dream Touch's feasibility review includes a parking impact analysis before any design work.

The Dream Touch difference

What Ottawa homeowners get from an addition contractor that delivers everything in-house.

One team, one contract

Design, permits, and construction sit under one Dream Touch roof, so one team answers for the whole job instead of an architect, designer, contractor and permits team blaming each other.

Fixed-price contracts

Every addition is priced as a written, fixed-price contract before permits are pulled. We don't use change orders as a profit centre, and the final bill holds no surprises.

Free lot feasibility

Before you commit to anything, Dream Touch's permits team confirms your lot can take the addition you want, within 48 hours and with no deposit.

In-house architectural design

Our architects and designers work onsite with you, talking through flow, light, and how you live instead of pulling a plan from a catalog.

Ottawa-specific expertise

After 20 years of building additions in Ottawa, we know the local zoning, permit processes, soil conditions, freeze-thaw detailing, and Committee of Adjustment proceedings.

Licensed, insured, Tarion-enrolled

Dream Touch is a Licensed Ontario General Contractor, fully insured, and Tarion-enrolled. Your addition is backed by a 5-year structural warranty and written workmanship guarantees.

Ottawa clients

Real Ottawa families. Real results.

"

Moe and the team at Dream Touch Renovations did a fantastic job on our home. The craftsmanship is excellent, the precision is clean, and the crew was pleasant, polite, helpful, patient, and clean throughout. I would hire Dream Touch Renovations again.

Saralyn HodgkinWestboro homeowner · Whole-home renovation + rear addition
"

Dream Touch Renovations made our addition a breeze. Their expertise and professionalism were outstanding. Clear communication, on-time delivery, and impeccable workmanship. We are thrilled with the results and highly recommend Moe and his team.

Michael RodriguezKanata homeowner · Family room addition
"

Dream Touch Renovations is truly exceptional. The team's creativity and commitment to quality made our project a success. The house was always clean and the process was stress-free. I highly recommend Moe and his team.

Emma DavisOrleans homeowner · Second-storey addition
Every corner of Ottawa

Home addition contractor serving Ottawa and beyond.

Dream Touch has completed home addition Ottawa projects across every neighbourhood and surrounding community. Our permits team works daily with City of Ottawa building services and knows the zoning rules of each ward, from the tight lots of the Glebe to the large suburban lots of Manotick and Greely.

Alta Vista Barrhaven Bells Corners Carp Centretown Dunrobin Findlay Creek The Glebe Gloucester Greely Hintonburg Kanata Manotick Manor Park Nepean New Edinburgh Orleans Overbrook Riverside South Rockcliffe Sandy Hill Stittsville Vanier Westboro

Don't see your neighbourhood? We build across the National Capital Region. Call 613-862-4555.

Common questions

Home addition cost Ottawa questions, answered.

The questions we answer most often during Ottawa feasibility consultations. If yours isn't here, call us and we'll talk through your property.

Talk to an addition specialist

Free 15-minute call. No obligation.

Call 613-862-4555

Home addition Ottawa pricing is driven by addition type and scope, square footage, finish and material selections, structural and foundation complexity, mechanical and electrical changes, permit requirements, and site conditions. Compact work like bump-outs and garage conversions sits at the lower end; full rear or side additions are mid-scope; second-storey additions are the largest. Every Dream Touch home addition Ottawa project is a written, fixed-price contract signed before permits are pulled, with a detailed itemized breakdown and no surprises.

Expect 8–16 weeks of active construction after permits are issued, plus 4–10 weeks for design and permit processing. Full project timelines from first consultation to handover run 4–7 months. Dream Touch maintains a strong on-time track record across two decades of Ottawa projects, with written delivery dates in every contract.

Yes. Every home addition in Ottawa requires a City of Ottawa building permit, plus trade permits for electrical, plumbing, and HVAC. Structural engineering stamps are required for anything modifying the building envelope. Some additions also need a minor variance requiring a Committee of Adjustment hearing. Dream Touch manages every permit and approval end-to-end.

Most Ottawa bungalows can accommodate a second storey, but it depends on foundation capacity, zoning height restrictions, and lot coverage limits. Dream Touch's 48-hour feasibility review confirms whether your specific bungalow is a candidate, including any foundation reinforcement required. Alta Vista, Riverside, and Bells Corners see the most second-storey addition activity in Ottawa.

For most rear, side, bump-out, and garage conversion additions, yes. Dream Touch seals the construction area from the existing home so daily life continues. For full second-storey additions, a 2–4 week period of temporary housing is typically needed during roof removal and re-sheathing. We coordinate temporary housing through trusted Ottawa partners if required.

Yes. MPAC (the Municipal Property Assessment Corporation) reassesses your property after permits are closed, and your annual property tax rises in proportion to the added assessed value. The increase is typically a small fraction of the project each year, and still well below the land-transfer tax and realtor commission you would pay to sell and buy a larger Ottawa home.

Yes. Ottawa's Bill 23 (More Homes Built Faster Act) and By-Law 2008-250 now allow up to three residential units on most Ottawa lots, including a primary home, an in-law or rental suite, and a coach home. Dream Touch builds legal secondary suites to full City of Ottawa compliance, registered as secondary dwelling units, with separate entrance, fire-rated separation, and code-compliant ceiling heights. See our Bill 23 Guidance page for details.

Many Ottawa additions require a minor variance, typically for lot coverage, setback, or height. Dream Touch's permits team prepares the variance application, represents you at the Committee of Adjustment hearing, and manages any conditions imposed. We identify the need for variance at the feasibility stage, before you commit to design work.

Ottawa home addition ROI varies by type: bump-outs and second-storey additions typically return 20–53% of their cost in home value; rear and side additions return 14–38%; and in-law suite additions add rental income on top of the value lift. Dream Touch runs project-specific ROI analysis for every feasibility review, using 2025 CMHC and Ottawa Real Estate Board comparable data.

Most Ottawa homeowners finance additions through one of four options: a Home Equity Line of Credit (HELOC) against existing equity, a construction-to-permanent mortgage, a refinance of the existing mortgage, or a renovation loan. Dream Touch partners with three trusted Ottawa mortgage brokers who specialize in renovation financing. See our Financing page for details.
Your addition starts here

Your Ottawa home addition, from one team.
Free 48-hour lot feasibility.
Zero obligation.

Tell us your address and what you're hoping to build. Our permits team pulls your zoning, checks lot coverage and setbacks, confirms servicing capacity, and emails a written feasibility report with estimated cost ranges, in under two business days. No deposit, no obligation, no sales pressure.

100s
Projects
4.7★
Google Rating
Est. 2004
20+ Years
A+
BBB Rated
✓
Licensed & Insured