Sunroom addition before and after in Ottawa by Dream Touch Renovations
Ottawa Sunrooms · Three-Season · Four-Season · Screened Porches · Solariums

Ottawa sunroom builder.
Three seasons. Four seasons. Every season.

Dream Touch Renovations designs and builds custom three-season rooms, four-season sunrooms, screened porches, and solariums for homeowners in Kanata, Nepean, Orleans, and across Ottawa. Every project comes with a fixed-price contract, full insurance, a 1-year workmanship warranty, and a free 48-hour site assessment.

Custom sunrooms built for Ottawa's climate: three-season screened porches, or heated four-season sunrooms usable at −25°C. One team designs, permits and builds it, on a fixed written proposal, after a free 48-hour site assessment.

Call 613-862-4555
4 types
Three-season to four-season
3–8 wks
Typical build timeline
4 seasons
Ottawa-rated construction
48hrs
Free site assessment
Free site assessment
48-hour turnaround.
Heated to −25°C
Four-season ready.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.
Ottawa's sunroom specialists since 2004

Why Ottawa homeowners choose Dream Touch for custom sunroom builds

Who builds sunrooms in Ottawa? Dream Touch Renovations does. We design, permit and build three-season and four-season sunrooms, screened porches and solariums across Ottawa, on a fixed written proposal after a free 48-hour site assessment.

We are BCIN-certified for permit design, and every sunroom we build carries a 1-year workmanship warranty. Call 613-862-4555 to start with your yard.

Dream Touch Renovations is Ottawa's trusted sunroom builder Ottawa families have relied on since 2004, with over 500 residential projects completed across Barrhaven, Kanata, Orleans, Westboro, Nepean, Manotick, and every neighbourhood in between. As a Licensed Ontario General Contractor, fully insured, we work exclusively on fixed-price contracts signed before permits are pulled: no change-order surprises, no hidden charges.

If you want a sunroom contractor Ottawa that does everything in-house, you have one company to hold to the price.

Four kinds of sunroom we build in Ottawa

We build four core categories of Ottawa sunroom. The three season sunroom Ottawa uses single- or double-pane glass, minimal insulation, usable roughly May through October. The four season sunroom Ottawa (also called a 4 season sunroom Ottawa) uses triple-pane low-E glass, R-24+ walls, integrated heating, permitted as Ontario Building Code-compliant living space and usable year-round, including −25°C January mornings. The screened porch Ottawa uses no glass, metal or fibreglass mesh, roofed and framed for four-month summer use. The custom solarium Ottawa or conservatory Ottawa includes full glass sunroom Ottawa builds with glass roofs, specialty engineering, and heritage-matched detailing for older Ottawa homes.

A Dream Touch Ottawa sunroom is engineered for this climate, which a kit-built panel box shipped in from southern Ontario is not. Ottawa's frost line reaches 1.2–1.5m, so the footings go deep. Our 2.4 kPa ground snow load calls for reinforced roof framing, which off-the-shelf sunroom kits rarely specify.

Low-E triple-pane glass with argon fill controls winter condensation, continuous air and vapour barriers keep moisture out of the wall assembly, and HRV ventilation manages humidity through the year. Explore our Financing options or book a free on-site custom sunroom Ottawa feasibility review. We'll walk your yard, check orientation, confirm servicing, and email a full assessment in 48 hours.

The most important decision

Three-season or four-season sunroom: which is right for your Ottawa home?

Choosing between a three season sunroom Ottawa build and a four season sunroom Ottawa build sets most of your quote: glass specification, wall and ceiling insulation, heating, foundation type and long-term value. A three season sunroom Ottawa build suits summer use; a four-season sunroom is usable all year.

Three-Season Sunroom
Most budget-friendly
Usable May – October · 5–6 months
Construction
  • Single-pane or double-pane glass
  • Uninsulated or minimally-insulated walls
  • No heating/cooling system
  • Deck pier or slab foundation
  • Screened windows often available
Best for
  • Morning coffee in summer
  • Protected outdoor dining
  • Screened-in summer relaxation
  • Budget-conscious build
Limitations
  • Unusable November through April
  • Cannot be insured as year-round space
  • Does not count toward home square footage
Screened Porch
Lightest scope
Usable June – September · 4 months
Construction
  • No glass, fibreglass or metal mesh screens only
  • Post-and-beam frame, optional partial walls
  • Roofed, usually with ceiling fan
  • Deck or slab foundation
Best for
  • Evening gatherings free of mosquitoes
  • Covered outdoor dining
  • Very budget-friendly alternative
Limitations
  • Zero climate control
  • Unusable outside summer
Three-season vs four-season · Ontario Building Code

What the Building Code changes between a three-season and a four-season room.

The City of Ottawa treats both as additions, and both need a building permit. Inside the Ontario Building Code they part ways over one question: will anyone use the room through the winter?

The Code's energy standard for houses, Supplementary Standard SB-12, covers housing "intended for occupancy on a continuing basis during the winter months." A four-season sunroom fits that description, so it becomes part of the heated house and has to meet the standard. A three-season room does not.

Your existing exterior wall stays the line between heated and unheated space, and SB-12 Sentence 3.1.1.10.(3) asks for one thing at that line: the door from the house into an unheated enclosed room needs an insulated core and weatherstripping.

Glass is where the two rooms differ most. A room that is mostly glass cannot meet SB-12's ordinary window limits, so Sentence 3.1.1.11.(3) gives a one-storey sunroom addition its own route, on condition the glass is better: doors, windows and walls at a maximum U-value of 1.4 W/(m²·K), or 1.2 in a house with electric space heating, and roofs and skylights at 2.6.

A three-season room sits outside that standard, which is why single or double glass is a normal choice there.

Heating comes with a target of its own. Article 9.33.3.1 of the Code asks the heating in living spaces to hold 22°C at the outdoor design temperature, and Supplementary Standard SB-1 sets Ottawa's at −25°C (the January 2.5% value for City Hall). A four-season room used as a family room or office is sized to hold that. A three-season room has no heat to size.

The foundation rule applies to both. Table 9.12.2.2 puts footings on clay, or on soil nobody has identified, at least 1.2 m below finished grade and never shallower than the frost reaches. On rock there is no minimum, and Sentence 9.12.2.2.(5) allows less where the foundation is designed for it.

The Code leaves frost depth itself to "local experience" (Article 1.1.3.2). The low floating deck is the exception people ask about, and Sentence 9.12.2.2.(7) only frees a deck from frost depth when it is not supporting a roof, so a deck built that way cannot simply be closed in.

The roof carries the same Ottawa snow either way. SB-1 lists the 1-in-50-year ground snow load as 2.4 kPa at City Hall, Barrhaven and Orleans and 2.5 kPa in Kanata, plus a 0.4 kPa rain load.

For a light-frame roof, Article 9.4.2.2 turns the City Hall figure into a design load of 0.45 × 2.4 + 0.4 = 1.48 kPa where the whole roof is no wider than 4.3 m, and 0.55 × 2.4 + 0.4 = 1.72 kPa on anything wider. That is about 31 and 36 pounds per square foot, whether or not the room underneath is heated.

Every Ottawa sunroom style

Six styles of Ottawa sunrooms we build.

Style decides the look, the scope and how the room joins your house. Dream Touch builds all six common Ottawa sunroom styles, including glass sunroom Ottawa solariums, custom sunroom Ottawa cathedral designs, screened porch Ottawa summer builds, and traditional conservatory Ottawa builds for heritage properties.

Gable Sunroom Ottawa

A peaked-roof sunroom that matches the rooflines of Ottawa's suburban homes. The pitched roof sheds Ottawa's heavy winter snow and allows for vaulted interior ceilings with clerestory windows.

Mid-range scope Best for: Suburban homes in Barrhaven, Kanata, Orleans

Studio Sunroom Ottawa

A single-slope shed-roof sunroom, typically used on modern homes or as a rear addition to mid-century bungalows. It attaches neatly under existing roof lines.

Streamlined scope Best for: Modern and mid-century Ottawa homes

Cathedral Sunroom Ottawa

A high-ceiling sunroom with exposed beams, often with transom windows at the peak. It gets the most light on south-facing Ottawa backyards.

Elevated scope Best for: Homes with backyard views, tree canopy

Solarium Ottawa

Full glass roof and walls. It needs specialty structural engineering, laminated safety glass and careful snow-load calculation, and it lets in more light than any other Ottawa sunroom option.

Premium scope Best for: Gardening enthusiasts, high-end builds

Conservatory Ottawa

A formal, traditional glass-house style, often with decorative ridge cresting and finials. It suits older Ottawa homes in the Glebe, Rockcliffe, and Centretown.

Premium scope Best for: Heritage Ottawa homes, traditional aesthetic

Screened Porch Ottawa

A covered, screened-in porch with no glass and no climate control that keeps the bugs out. It is the most affordable sunroom-adjacent option and one of Ottawa's most popular summer upgrades.

Lightest scope Best for: Summer-use outdoor dining, budget builds
Built for Ottawa's climate

What makes a Dream Touch sunroom different in Ottawa.

Sunroom kit manufacturers and out-of-province builders routinely miss the engineering Ottawa's climate needs. We build for the coldest January mornings and the most humid July afternoons.

Ottawa is hard on sunrooms. Temperatures swing from +35°C to −30°C in a single year, annual snowfall routinely exceeds 220 cm, the ground snow load is 2.4 kPa (requiring reinforced roof engineering), and the frost line reaches 1.2–1.5 m (requiring deep concrete footings).

Many of the off-the-shelf sunroom kits Ottawa homeowners see marketed from national brands are rated for milder climates farther south and fail structurally, fail thermally, or develop severe wall-cavity condensation when installed here.

Dream Touch's heated sunroom Ottawa specification is our four-season sunroom builder Ottawa build standard.

Every heated sunroom Ottawa we build uses triple-pane low-E glass with argon fill (U-value ≤ 1.3), R-24 wall insulation minimum with continuous exterior rigid foam to eliminate thermal bridging, R-40 ceiling insulation, properly detailed air and vapour barriers to prevent winter condensation inside the wall assembly, and either an integrated HRV or HVAC tie-in to manage humidity year-round.

All four-season sunrooms are engineered, stamped, and permitted as Ontario Building Code-compliant living space, not as "accessory structures."

Every Dream Touch sunroom is backed by a 1-year workmanship warranty and up to 25-year manufacturer warranties on glass and mechanicals. For projects that qualify as new living space additions, Tarion-equivalent structural coverage applies.

Common complaints · Ottawa climate

The common complaints about sunrooms in Ottawa, and what prevents each.

Owner complaints about sunrooms, whoever built them, fall into a short list. Most start with Ottawa's winter meeting a room that was not designed for it, or with a three-season room being asked to do a four-season job.

Too hot in July

Glass lets the sun's heat through, and a glass roof takes the most because it faces the midday sun. Natural Resources Canada rates glass by its solar heat gain coefficient, a fraction between 0 and 1, and the lower the number the less solar heat gets in.

SB-1 puts Ottawa's summer design temperature at 30°C, so a room that is mostly south- or west-facing glass needs a plan for July as well as January. That plan is made at design time: a solid insulated roof with skylights in place of an all-glass one, glass chosen for each orientation, and shading or venting on the hot sides.

Condensation and frost on the glass

Natural Resources Canada says the risk of condensation rises as the weather gets colder and indoor humidity goes up, and in a sunroom the glass is most of the room. Warmer glass is the fix: triple glazing, low-e coatings and thermally improved spacers all raise its inside surface temperature.

NRCan also points out that air moving across glass keeps it warmer, while drapes, blinds and furniture pushed against it block that air. In an unheated three-season room, keep the insulated door to the house shut in winter so warm, moist house air is not feeding cold glass.

A cold floor

A sunroom on posts, or on an existing deck, has winter air moving underneath it. Good glass cannot make up for an uninsulated floor. In a four-season room the floor gets insulated like the walls, or the room sits on an insulated slab, and in-floor radiant heat is available if you want warm tile in February. In a three-season room a cold floor in March comes with the design.

Snow sliding off the house

A sunroom usually sits under the eaves of a taller roof, so it carries its own snow plus whatever slides off the house. The Ontario Building Code accounts for this where a roof is engineered under Part 4: Article 4.1.6.11 adds load on a lower roof for snow sliding off an upper one.

That is one reason a glass roof gets its own structural design, and why the roof load a sunroom was designed for is a fair question to put to any builder, us included.

Leaks at the joint with the house

Sunroom leaks tend to start where the new roof meets the old wall, or around a skylight, more often than through the glass itself. Natural Resources Canada notes that skylights "commonly suffer from water leakage and condensation around the frame and curb." The flashing at the tie-in and the roof slope there decide whether meltwater gets out or gets in.

Movement between sunroom and house

Frozen clay grips what is set in it. In a National Research Council field study in Ottawa's Leda clay, published in 1969, frozen soil pushed up to about 6,000 lb on a steel pipe set 5 feet down, and the researchers concluded that footings below frost depth do not ensure stability if the soil freezes to the column.

A sunroom on shallow posts can rise in winter while the house on its basement stays put, and the joint between them takes the strain. The Code's floating-deck exception makes the same point: an attached deck only qualifies if movement between it and the house will not harm the house.

Sunroom design concepts

Concepts for Ottawa neighbourhoods.

Illustrative concepts based on typical Ottawa sunroom projects, each drawn for the kind of lot and light it would sit on. These are architectural illustrations, not photographs of specific builds.

View Full Portfolio →
Gable four-season sunroom Ottawa Barrhaven winter evening
Barrhaven

Gable Four-Season Sunroom

  • Full four-season insulation
  • Triple-pane low-E glass
  • Radiant in-floor heating
  • Adds 220 sq ft to home value
Studio three-season sunroom Ottawa Kanata summer golden hour
Kanata

Studio Three-Season Sunroom

  • Three-season budget-friendly
  • Oversized sliding doors
  • Cedar tongue-and-groove ceiling
  • Maintenance-free aluminum frame
Cathedral solarium sunroom Ottawa Glebe dusk heritage
The Glebe

Cathedral Solarium

  • Cathedral ceiling with clerestory glass
  • South-facing light optimization
  • Heritage-matched exterior siding
  • Integrated ceiling fan & ambient lighting
Permits · Zoning · Lot Coverage · Ottawa

Do you need a permit for a sunroom in Ottawa?

Yes. Every sunroom in Ottawa requires a building permit, and its structural, electrical and insulation details fall under the Ontario Building Code. Dream Touch handles every permit, so you never file paperwork.

Check our Ottawa building permit guide for sunroom addition rules and timelines.

Also see our basement renovations in Barrhaven — we bring the same design-build quality to every lower-level project.

Every sunroom Ottawa project, from a simple screened porch to a full four-season build, requires a City of Ottawa building permit. If the sunroom includes any electrical work (lighting, outlets, electric heating, fans), a separate Electrical Safety Authority (ESA) inspection is mandatory. Integrated heating or cooling systems (mini-split, baseboard, radiant in-floor, HRV) trigger HVAC permits. Dream Touch files the permits, schedules the inspections and manages the sign-offs.

Do you need a permit to build a sunroom in Ontario? Yes, and the rule is provincial. Section 8 of Ontario's Building Code Act, 1992 says no one may construct a building without a permit from the chief building official, and the Act defines a building as a structure over 10 square metres, or a smaller one with plumbing.

Its meaning of "construct" includes extending a building. The City of Ottawa's addition permit page names sunrooms, solariums and porches as additions under that rule. The two sizes people search for are both over the line: a 12 by 12 room is 13.4 m² and a 20 by 20 room is 37.2 m².

The City's inspection list for an addition starts with excavation before the footings are poured and runs through framing, insulation and vapour barrier to a final inspection, and its approved service level for a first plan review is 10 business days.

Ottawa zoning considerations for sunrooms start with lot coverage. Sunrooms count toward your total built lot coverage, so your existing percentage (versus your zone's maximum, typically 35%) must allow for the addition. Setback requirements apply: typically 1.2 m from the side lot line, 7.5 m from the rear, and 6 m from the front, though every Ottawa zone is different.

For some lots, particularly in central areas like the Glebe, Westboro, and Hintonburg, a minor variance from the Committee of Adjustment may be required. Dream Touch checks all of this during the free 48-hour sunroom addition Ottawa site assessment. For a standalone sunroom or one combined with a larger rear addition, we confirm what your lot allows before you spend a dollar on design.

If you are combining a sunroom with a larger build, we have deep experience integrating sunrooms with home additions, Bill 23 secondary suites, and basement conversions. Explore our Financing page for renovation loan options from our three trusted Ottawa mortgage broker partners.

The Dream Touch sunroom process

From free site assessment to first morning coffee.

Every Dream Touch sunroom project follows the same eight steps, refined over 20 years of Ottawa residential construction, with a fixed price signed before work begins.

  1. 1
    60 minutes · Free

    Free Site Assessment

    Walk your yard, assess orientation (south-facing beats north-facing for solar gain), check servicing, confirm setbacks. No deposit, no obligation.

  2. 2
    48 hours · Free

    Feasibility & Zoning Review

    Pull your lot zoning, verify setbacks and lot coverage, confirm permit path. Identify any minor variance needs early.

  3. 3
    1–3 weeks

    Design Consultation

    Discuss three-season vs. four-season, style (gable, studio, cathedral, solarium, conservatory), glass specification, heating approach, and interior finish. 3D renderings provided.

  4. 4
    1 week

    Fixed-Price Contract

    Itemized, line-by-line scope. You approve the written fixed-price contract before any permits are applied for.

  5. 5
    3–8 weeks

    Permits & Engineering

    Building permit, ESA for electrical, HVAC permits if applicable. Structural engineering stamps for roof snow-load and footings.

  6. 6
    1–2 weeks

    Foundation & Framing

    Frost-depth concrete footings, framed structure with proper air and vapour barrier detailing for Ottawa winter performance.

  7. 7
    2–3 weeks

    Glass, Roofing, Interior Finish

    Triple-pane glass installation (four-season), roofing to match existing home, interior finishing (drywall, trim, flooring, electrical, heating).

  8. 8
    1 week

    Final Inspections & Handover

    ESA inspection, municipal building inspection, HVAC commissioning, final walkthrough, warranty documents delivered.

Transparent pricing

What shapes a sunroom budget in Ottawa?

Dream Touch offers fixed-price contracts signed before permits are pulled. The three scope tiers below show what's included at each level. Your written proposal is priced from your size, glass specification, insulation, heating approach, foundation and finish level.

Essential
Three-Season: seasonal Ottawa sunroom · May–October
  • 120–220 sq ft typical size
  • Double-pane glass or screened windows
  • Uninsulated or minimally-insulated walls
  • Deck or slab foundation
  • Electrical for lighting and fans
  • Standard aluminum or vinyl frame
  • Cedar, composite, or tile flooring
  • 1-year workmanship warranty
Best for: Summer use, budget-focused, covered outdoor dining, morning coffee spot.
Signature
Custom Solarium: signature Ottawa sunroom · Glass roof or heritage design
  • 220–400 sq ft typical size
  • Full glass roof or specialty structure
  • Laminated safety glass (structural)
  • Custom frame: aluminum, wood-clad, or steel
  • High-performance integrated heating
  • Motorized shades or skylights
  • Premium finishes (hardwood, stone, custom millwork)
  • Heritage-matching exterior for older Ottawa homes
  • 10-year structural warranty
Best for: Statement design, gardening enthusiasts, heritage homes, luxury builds. Often becomes the most-used room in the home.
Return on Investment

What's the ROI of a sunroom in Ottawa?

Sunroom ROI depends mostly on whether the sunroom qualifies as permanent, insulated, code-compliant living space, because that decides how Ottawa appraisers value it. It is why four-season sunrooms outperform three-season builds in long-term resale value.

Sunroom Type
Scope
Counts as Living Area?
Resale Value
Usable Months
Screened porch
Lightest
No
Lifestyle, not resale
4 months
Three-season sunroom
Mid
No
Lifestyle, partial resale
5–6 months
Four-season sunroom (standard)
Full
Yes
Strong appraised value
12 months
Four-season sunroom (premium)
Premium
Yes
Strong appraised value
12 months
Custom solarium / conservatory
Signature
Yes
Highest appraised value
12 months

* Note: Three-season sunrooms and screened porches typically don't add full square-footage value because they're not code-compliant year-round living space. You build one for how you will use it. Four-season sunrooms add appraised value because they count as permanent Ontario Building Code-compliant living space.

Before you hire

How to choose a sunroom builder in Ottawa.

Ask every builder, kit sellers included, for these Ottawa figures in writing before you sign. A builder who designs for this climate will have each one ready.

Five questions for any sunroom builder

  • What snow load is the roof designed for? SB-1 sets Ottawa's ground snow load at 2.4 kPa, 2.5 in Kanata, and a sunroom under the eaves also takes the snow that slides off the house.
  • How deep do the footings go? On clay, Table 9.12.2.2 puts them at least 1.2 m below finished grade, and never shallower than the frost reaches.
  • For a four-season room, what U-value is the glass? SB-12 holds a one-storey sunroom addition's walls, windows and doors to U-1.4, or U-1.2 in a house with electric heat.
  • Who applies for the building permit? The City of Ottawa treats a sunroom as an addition, and the drawings go in with the application.
  • What workmanship warranty is in the contract, and for how long? Get it in writing, apart from the manufacturer's terms on the glass.

Can I build a sunroom myself?

You can, with a permit. Ontario's Building Code Act requires one for any building over 10 m², and a 12 by 12 room is 13.4 m². The 2024 Building Code lets the owner apply, and the City of Ottawa notes that a homeowner can take design responsibility for their own house by writing "homeowner" on Schedule 1.

A room you build yourself is held to the same numbers as ours: footings below frost, a roof for Ottawa's snow and, if you heat it, glass that meets SB-12. Electrical work needs its own ESA inspection. Our Ottawa building permit guide walks through the application.

Are prefab sunroom kits worth it in Ottawa?

A kit can work here if it is rated for Ottawa. Before you buy, ask the seller for the roof's design snow load against the 2.4 kPa figure, the glass U-value if you plan to heat the room, and the footing detail the kit assumes.

A kit room over 10 m² needs the same City permit and inspections as a custom one. If you might heat the room later, compare the kit with a four-season design or a full home addition in Ottawa before you order, because a heated room has to meet SB-12.

The Dream Touch difference

Why Ottawa homeowners choose Dream Touch as their sunroom contractor Ottawa instead of shipped-in kit builders.

Custom, not kit

Every Dream Touch sunroom is designed for your specific home and lot. We don't use pre-fabricated panels or "one-size-fits-all" aluminum boxes, and the sunroom is built to match your existing house.

Ottawa climate engineered

Four-season sunrooms are built to handle Ottawa's 2.4 kPa ground snow load, 1.5m frost depth, and −30°C winter extremes. Kit-built sunrooms shipped from southern manufacturers routinely fail here.

Fixed-price contracts

Every sunroom is priced as a written, fixed-price contract before permits are pulled. We don't use change orders as a profit centre, and there are no surprise charges during the build.

One team, one contract

Design, permits, foundation, structural, glass, electrical, HVAC, and interior finish under one Dream Touch roof, so there is no finger-pointing between subcontractors.

Licensed, insured, Tarion-enrolled

Dream Touch is a Licensed Ontario General Contractor, fully insured, with a 1-year workmanship warranty plus manufacturer warranties up to 25 years. Your sunroom is built to last for decades.

20 years of Ottawa expertise

We know local zoning, the Committee of Adjustment process and Ottawa climate detailing, and how to tie into existing Ottawa home styles (mid-century bungalows, heritage Glebe homes).

Ottawa clients

Real Ottawa homeowners. Real work from their sunroom builder Ottawa trusts.

"

Dream Touch Renovations transformed our house into a dream home. From design to execution, they exceeded our expectations. The team's dedication and attention to detail was top-tier. Highly recommend.

Samantha ThompsonOttawa homeowner · Whole-home renovation client
"

Dream Touch Renovations is truly exceptional. The team's creativity and commitment to quality made our project a success. The house was always clean and the process was stress-free.

Emma DavisOrleans homeowner · Addition & renovation client
Every corner of Ottawa

Sunroom builder serving Ottawa and the National Capital Region.

Dream Touch has built sunroom Ottawa projects across every neighbourhood and surrounding community. We know the zoning, lot patterns and house styles of each area: tight urban lots in the Glebe, large suburban properties in Manotick and Greely, and the Ottawa Valley.

Alta Vista Barrhaven Bells Corners Carp Centretown Dunrobin Findlay Creek The Glebe Gloucester Greely Hintonburg Kanata Manor Park Manotick Nepean New Edinburgh Orleans Ottawa Valley Richmond Riverside South Rockcliffe Stittsville Vanier Westboro

Don't see your neighbourhood? We build across the National Capital Region. Call 613-862-4555.

Common questions

Ottawa sunroom questions, answered.

The questions we hear most often in Ottawa sunroom consultations. If yours isn't here, call us and we'll talk through your property.

Talk to a sunroom specialist

Free 15-minute call. No obligation.

Call 613-862-4555
Sunroom budgets in Ottawa are driven by type and specification: screened porches are the lightest scope, three-season sunrooms add glass and partial insulation, four-season sunrooms (Ottawa's most popular) add triple-pane low-E glass, full insulation, frost-depth footings, and integrated heating, and custom solariums add glass roofs and specialty engineering. Size, foundation, heating approach, and finish level all move the number. Every Dream Touch sunroom is a written, fixed-price contract signed before permits are pulled.
A three-season sunroom uses single or double-pane glass and has minimal insulation, so it's usable in Ottawa roughly from May through October. A four-season sunroom uses triple-pane low-E glass, R-24+ wall insulation, R-40 ceiling insulation, integrated heating, and is built to Ontario Building Code standards. It's usable year-round, including −25°C Ottawa winters, and counts as permanent living space.
Only if it's a four-season sunroom. A properly built four-season sunroom with triple-pane glass, R-24+ walls, integrated heating, and HRV ventilation is comfortably usable in Ottawa at −30°C. Three-season sunrooms and screened porches become unusable from November through April because of the cold and condensation.
Not with a heater alone. A room that is heated and used through the winter falls under the Ontario Building Code's energy standard, Supplementary Standard SB-12, which holds a sunroom addition's walls, windows and doors to a U-value of 1.4 (1.2 in a house with electric space heating) and its roof and skylights to 2.6. Converting means checking the glass, the insulation and the foundation against the Code, and the glass is the part most often replaced. If you expect to use the room in winter, design it as four-season from the start.
Yes, every sunroom in Ottawa requires a building permit. Electrical work requires ESA inspection, and integrated heating or cooling systems require HVAC permits. Sunrooms also count as part of lot coverage, so zoning compliance is verified. Dream Touch manages every permit end-to-end.
Active construction runs 3–8 weeks depending on type. Total project timeline from first consultation to handover is typically 10–18 weeks, including 3–8 weeks for permits. Dream Touch holds a 98% on-time rate with written delivery dates in every contract.
Four-season sunrooms add appraised home value because they qualify as permanent living space, often recovering most of their build cost at resale. Three-season sunrooms and screened porches add less appraised value because they don't count as year-round living area. You build one mainly for how you will use it.
Sometimes. For a three-season sunroom, an existing deck may work as the foundation if engineering confirms it can support the additional load (roof snow, wall weight, furnishings). For a four-season sunroom, a new frost-depth concrete footing is almost always required. Decks cannot support year-round insulated construction. Dream Touch assesses this during the site assessment.
Only if you want year-round use. Four-season sunrooms require integrated heating, typically baseboard electric, in-floor radiant, or ductless mini-split. Dream Touch sizes and specs heating based on glass area, insulation spec, and orientation. For three-season sunrooms, heating isn't required or recommended.
Yes, under Ottawa's Bill 23 provisions. A sunroom can be integrated with a ground-level in-law suite or rental apartment, often as shared space or as space for the tenant alone. Dream Touch has built several combined sunroom-plus-suite projects across Ottawa. See our Bill 23 Guidance page for eligibility.
Most Ottawa homeowners finance sunrooms through HELOC (Home Equity Line of Credit), home improvement loan, or refinance. Dream Touch partners with three trusted Ottawa mortgage brokers who specialize in renovation financing. See our Financing page for details.
Your Ottawa sunroom starts here

Free sunroom site assessment.
48-hour turnaround.
Zero obligation.

Tell us your address and what you're picturing. We walk your yard, measure the space, check orientation and setbacks, and email a written feasibility report with a scope breakdown within two business days. No deposit, no obligation.

100s
Projects
4.7★
Google
Est. 2004
20+ Years
A+
BBB
✓
Licensed & Insured