Ottawa building permit fees are set two ways in 2026. New floor area, such as an addition, is charged per square metre: $12.52/m² for a house. Work inside an existing house is charged $12.75 per $1,000 of construction value, with a $117 minimum. Both rates are from the City of Ottawa's schedules effective 2026-01-01.
The fee is paid when you apply for a building permit in Ottawa, and it is the same whoever does the work. When we build an addition or coach house, the permit, drawings and inspections are part of the job.
What the 2026 schedules charge
The numbers come from the City of Ottawa's Building Code Services Fee Schedule and Gross Floor Area Fee Schedule, both effective 2026-01-01.
| What you are building | 2026 City of Ottawa fee |
|---|---|
| New floor area: detached, semi, row house or duplex | $12.52 per m² |
| New finished basement under that house | $2.99 per m² |
| New Part 9 apartment building | $13.33 per m² |
| Renovation with no new floor area | $12.75 per $1,000 of construction value, $117 minimum |
| Plumbing work only | $117 per application |
| Change of use | $126 per application |
New floor area: additions and new buildings
The Gross Floor Area rate applies only to floor area the project creates, measured to the outer face of the exterior walls, with no deduction for stairs. An unfinished basement and an attached garage of a new house are left out. A finished basement holding the principal rooms of a separate unit is charged at the house rate (note 5 of the schedule).
Renovations inside an existing house
If no floor area is added, as when a kitchen moves or a load-bearing wall is opened, the fee is $12.75 for every $1,000 of declared construction value: 1.275%, never less than $117.
Demolition and conditional permits
A demolition permit is $117 for the first 5,000 sq ft of gross floor area, plus $12.75 for each extra 1,000 sq ft, under the City's 2026 fee schedule. It is $1,170 where the Demolition Control By-law applies and $3,510 on a property designated under the Heritage Act. A conditional permit for a detached, semi-detached or row house is $379.
Worked examples from the City's schedule
A two-storey rear addition
The City's Example 4 is a two-storey rear addition of 28 m² per floor, with a finished basement under it and changes inside the existing house:
- New floors: 2 × 28 m² at $12.52, which is $701.12.
- New finished basement: 28 m² at $2.99, which is $83.72.
- Alterations to the existing house: the declared value at $12.75 per $1,000, which is $573.75 in the City's example.
The total permit fee is $1,358.59. The drawings and engineering behind a home addition in Ottawa are separate from that fee.
Why some owners pay more: fees from mistakes
- Starting before the permit is issued adds an administrative surcharge of 50% of the permit fee, up to $10,000.
- Changing the design after the permit issues costs a revision fee of $12.75 per $1,000 of the revised work, minimum $117.
- A failed inspection on a house costs $100 for each re-inspection.
All three are avoidable: settle the design before applying, start nothing until the permit is on site, and book each inspection when the work is ready for it.
What the City fee does not cover
The permit fee pays for the City's plan review and inspections. Other approvals are charged separately:
- The Electrical Safety Authority permits and inspects wiring, and sets its own fees.
- If the design misses a zoning number, a minor variance from the committee of adjustment in Ottawa costs $2,852 in the City's 2026 budget.
- Section 2(3.2) of Ontario's Development Charges Act exempts the common secondary suites in Ottawa from development charges, such as a second unit in an existing house.
How to apply and pay
- Register for the Building, Planning and Land Development service on a My ServiceOttawa account.
- Upload the drawings and forms, with the floor areas and construction value filled in.
- Pay the fee with the application.
- Wait for the issued permit before any work starts, demolition included.
How we handle the permit on a full project
On a full project we check the zoning, prepare the BCIN-certified drawings, coordinate the structural engineering, submit, answer the examiners and book the inspections. Diana, whose rear addition we built in Manotick, wrote in her Google review:
“The structural engineering coordination, the permit management, and the construction execution were all handled smoothly.”
If you are planning an addition or a full basement, call 613-862-4555.
Frequently asked questions
How much does a building permit cost in Ottawa?
Under the City of Ottawa's 2026 schedules, new floor area on a house costs $12.52 per square metre, and a new finished basement $2.99 per square metre. Work that adds no floor area costs $12.75 per $1,000 of construction value, with a $117 minimum. The City's own example of a two-storey rear addition comes to $1,358.59.
How long does it take to get a building permit in the City of Ottawa?
The City's target for a first review of a complete application is 10 business days for a house and 5 for a deck, porch, shed or garage. Any deficiency the examiners find pauses the clock until it is answered.
What happens if you build without a permit in Ottawa?
The City's 2026 fee schedule adds a surcharge of 50% of the permit fee, up to $10,000, when construction starts before the permit is issued. Work already closed in may have to be opened up for the inspector.
Do I need a permit to renovate my bathroom in Ontario?
Not if you are only replacing fixtures, tile and cabinets in the same places. Moving or adding plumbing, or changing a wall that carries load, needs a building permit. In Ottawa a plumbing-only permit is $117 per application under the 2026 schedule.
Official references
- Building Code Services Fee Schedule, effective January 1, 2026, City of Ottawa, read 2026-11-16
- Gross Floor Area Fee Schedule and worked examples, revised January 1, 2026, City of Ottawa, read 2026-11-16
- Applying for a building permit, City of Ottawa
- Notifications and Inspections, Electrical Safety Authority, read 2026-11-19
- 2026 Budget Book, Committee of Adjustment user fees, City of Ottawa
- Development Charges Act, 1997, section 2(3.2), Government of Ontario