← All articles
Design Guide

Kitchen layouts for Ottawa homes

Updated Nov 16, 2026 · 6 min read · By Dream Touch Renovations Ottawa

Dream Touch Renovations design inspiration title card
← All articles

There are six common kitchen layouts: galley, L-shape, U-shape, single-wall, island and peninsula. The room decides which one works: its width, its doorways, and whether a wall can come out. Long, narrow rooms suit a galley, square rooms an L, and open rooms with 42 inches of aisle all round can take an island.

Changing the layout is usually what turns a refresh into a full kitchen renovation in Ottawa, with new plumbing, a City permit and sometimes a beam. So pick the shape first, before a single cabinet is drawn.

What the six kitchen layouts are, side by side

The aisle widths below are the ones Dream Touch designs to: 42 inches for one cook, 48 for two.

LayoutBest roomSpace it needsWatch out for
GalleyLong, narrow rooms: row houses, condos, basement suitesA 42 to 48 inch corridor between runsTwo cooks collide; no room for an island
L-shapeSquare rooms with a doorway on one sideTwo walls meeting in a cornerThe corner cabinet
U-shapeA kitchen kept as its own roomAbout 10 by 10 feet of floorTwo corners; closed off from the house
Single-wallOpen plans, small suitesOne straight wallNo work triangle without an island
IslandOpen rooms after a wall comes outAisles of 42 inches or more on every working sideToo big an island for the room
PeninsulaRooms too narrow for a true islandA run that can extend into the roomIts attached end is another corner

Galley

Two parallel runs give the most counter per square foot, with every appliance a pivot away. Dream Touch's published Centretown example, a 1907 row house, had a kitchen 7 feet 4 inches wide, so cabinets ran on both long walls with a 44-inch aisle. An island would have left 31 inches a side, so it did not get one.

L-shape

Two runs meet in a corner and leave the rest of the room open for a table or a doorway. It is the usual layout in the 1950s and 1960s bungalows of Alta Vista, Nepean and Manor Park.

In a published Hintonburg project, a 9-foot-4 by 10-foot kitchen got 6 feet on the back wall and 5 feet 6 inches on the side, with a bistro table in the open corner. For the corner cabinet, a magic-corner pull-out keeps more space than a lazy Susan and costs more.

U-shape

Three runs give the most storage and a short walk between everything. A 1968 Manor Park bungalow in Dream Touch's write-ups had an 11 by 12 foot U with the sink under the window. It suits one cook well and two cooks less well, and opening it up usually means removing a run and often a wall.

Single-wall, usually with an island

Everything sits on one wall. With an island opposite, it becomes a full kitchen in an open room: in a published Nepean project, a 1965 bungalow lost a non-load-bearing wall and got a 14-foot back-wall run with a 7-foot island.

Island

An island adds a second prep zone, seating and storage. It also fails most often, because it gets sized to the room instead of the aisles. Six of the nine kitchens in the Dream Touch portfolio finished between 2023 and 2025 have one, including the Westboro kitchen, where a 9-foot island now stands in the old dining room.

A sink in the island is permit work, since the City of Ottawa lists extending a plumbing system, and the drain needs a loop vent or an air admittance valve under Ontario Building Code Article 7.5.9.2.

Peninsula

A peninsula is a run that extends into the room and stays attached at one end. It gives you a bar where the room is too narrow for an island. The Kanata kitchen in our portfolio uses a waterfall-edge stone peninsula. ESA's Bulletin 26-23-8 says a peninsula needs its own receptacle under Rule 26-722 d) v), and an outlet on the wall behind the counter it joins does not count.

Why the room decides the layout

In Statistics Canada's 2021 Census, about 44 percent of the City of Ottawa's occupied homes were built in 1980 or earlier, which is why so many kitchens here are closed rooms. In houses built from 1955 to 1985, the original kitchen is usually about 9 by 11 feet with one window over the sink.

If a wall needs to go, our guide to load-bearing wall removal explains how it is checked and replaced with a beam.

How to plan a kitchen layout that works

The work triangle joins the sink, the stove and the fridge. Its three legs together should run 13 to 26 feet, with no leg shorter than 4 feet or longer than 9. National Kitchen and Bath Association guidelines add counter minimums: 36 inches to one side of the sink, 12 to 18 inches beside the cooktop, and 15 inches beside the fridge.

  1. Measure the room, including windows and every doorway.
  2. Mark walls that might be load-bearing and any plumbing stack.
  3. Choose the appliances, since the cabinets are sized around them.
  4. Tape the layout on the floor and cook around it for two days.
  5. Price it. Our guide to kitchen renovation cost in Ottawa shows what each layout change adds.

Kitchen layout mistakes worth avoiding

Our roundup of kitchen trends for 2026 covers the ideas that change a plan. To test a layout against your own room, book a free design consult at (613) 862-4555.

Frequently asked questions

What is the most efficient kitchen layout?

Per square foot, the galley: two parallel runs with every appliance a pivot away and no corner cabinets. For two cooks, an L with an island usually works best, because the island adds a second prep zone.

What is the kitchen work triangle rule?

The work triangle joins the sink, the stove and the fridge. Its three legs together should run 13 to 26 feet, with no single leg shorter than 4 feet or longer than 9.

What are the downsides of a kitchen island?

An island needs aisles of at least 42 inches on every working side, so it can crowd a narrow room. A sink on it brings plumbing work and a City permit, and a cooktop on it needs venting.

What can I have instead of a kitchen island?

A peninsula gives a bar and a second work surface in a room too narrow for an island. A narrow table on casters or a working pantry off the kitchen also work.

Does a kitchen island need an outlet in Ontario?

A permanently fixed island needs at least one receptacle when its counter has a continuous long side of 600 mm or more and a short side of 300 mm or more, under Ontario Electrical Safety Code Rule 26-722 d) iv). A movable island needs none.

Official references

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Plan Your Kitchen →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →