Shower waterproofing is a membrane behind the tile, such as Schluter-Kerdi or RedGard, that stops water before it reaches the wall. Tile, grout and thinset are not waterproof, and green board only resists moisture. A shower tiled straight onto green board with no membrane leaks slowly into the studs, the subfloor and the joists below.
The most expensive call I get is from a homeowner whose two-year-old bathroom leaked behind the tile and ate the floor joists, which is why waterproofing is the line to check first in any quote for a bathroom renovation in Ottawa.
Why green board alone fails
The story repeats: a cheap contractor tiles over green board with no membrane, and two years later the owners smell something. The bathroom looks fine on the surface. Behind the tile, the wall cavity is wet, the studs are spongy, the subfloor below the shower has rotted, and the joists under the bathroom are starting to fail.
Green board is moisture-resistant drywall: a wax-treated paper face over a gypsum core with additives. It is made for humid rooms, above a sink, beside a toilet, in a laundry room.
The Ontario Building Code sets a low bar for showers. Article 9.29.10.4 asks only that tile on walls around bathtubs and showers go over moisture-resistant backing, and Article 9.29.10.3 lets tile adhesive go onto gypsum board. Green board meets that minimum. The Code does not ask for a waterproof membrane.
Article 9.29.2.1 does require a waterproof finish at least 1.8 m up the walls of a shower stall, and Article 9.29.2.2 counts ceramic tile as that finish, so tile on green board passes.
That gap is where showers fail. People use green board alone because it is cheap and goes up fast. Tile gets stuck on with thinset, grout goes in the joints, and it looks fine for a year, until the grout cracks somewhere and water gets behind.
Tile, grout and thinset all let water through, so the waterproof layer has to sit behind the tile.
If your contractor is putting tile directly onto green board in a shower, the bathroom has a 2 to 5 year shelf life. After that you are running a slow leak you cannot see.
What proper shower waterproofing looks like
We use two systems on every bathroom, depending on the shape of the shower. Both work, and both add about 2 days and a modest materials-and-labour line to a typical bathroom.
Schluter-Kerdi (sheet membrane)
Kerdi is a polyethylene sheet membrane with fleece webbing, bonded to the wall with thin-set. Schluter's 2025 Shower System Installation Handbook lists the backings it can go over: gypsum wallboard, cement and fibre-cement backer board, and coated glass-mat gypsum board, among others.
The handbook's rules for the membrane itself:
- every seam and fastener is covered with KERDI-BAND or KERDI with a 2 inch (50 mm) overlap;
- it is set in Schluter thin-set or an unmodified thin-set mortar;
- the valve, shower head and other penetrations are sealed with Kerdi seals or a suitable sealant;
- a water test is strongly recommended before tile, after waiting at least 24 hours for the thin-set to set.
We have flood-tested Schluter showers and watched them sit full of water overnight without a drop coming through.
Dream Touch's portfolio describes one place where it matters most: the Orleans Accessible Primary Bathroom, 2024, a zero-threshold walk-in shower built on Schluter-Kerdi. With no curb to hold the water back, the membrane has to be planned past the shower footprint.
The shower floor: slope first, then the membrane
The floor has to fall to the drain at 1/4 inch per foot, and the slope belongs under the waterproof layer, not only on top of it.
In an old-style mortar-bed pan the order is a sloped mortar pre-slope, a PVC or CPE liner run up the walls, a second sloped mortar bed, then tile. Water that gets through the grout rides the liner to the weep holes in the drain.
The step that gets skipped is the pre-slope. With the liner laid flat on the subfloor, water that gets through the grout sits on it, the mortar bed never dries, and the subfloor under it rots.
Schluter's system avoids the problem with a foam tray that comes sloped from the factory and a bonded drain flange the Kerdi membrane laps onto, so the waterproofing sits just under the tile. Schluter says its shower trays come with a pre-cut sheet of Kerdi membrane for the shower floor.
RedGard (liquid-applied membrane)
RedGard is a paint-on elastomeric waterproofing with the same goal and a different application. The backer board goes up, then RedGard is rolled, brushed or troweled on, with reinforcing fabric at corners and seams.
Custom Building Products' data sheet calls for at least two coats when it is rolled or brushed. It goes on pink and turns red as it dries, so you can see when a coat has cured. The same sheet puts drying time at 1 to 1.5 hours a coat and says the area can be flood tested once both coats are fully dry.
RedGard suits irregular shapes, curbless showers and benches, where Kerdi corners get tricky. We use both, depending on the geometry.
The cost difference, in proportion
A typical Ottawa bathroom reno: tub surround plus a separate shower, 60-square-foot wet area total. A Schluter system on top of cement board adds only a small fraction to the project over the cheap green-board approach, and RedGard is similar.
Across a full bathroom build, proper waterproofing is one of the smallest line items on the proposal and the one that protects everything else. Our guide to bathroom renovation cost in Ottawa shows where it sits among the other lines.
Where showers leak, and how the membrane covers each spot
The same five spots fail in the showers we tear out, and a good spec answers each one:
- The curb. Water finds the seam where the curb meets the floor. The curb should be one piece of foam or a pre-formed Kerdi curb, fully wrapped in membrane. Two stacked 2x4s wrapped in plastic wick water and rot.
- The drain. If the membrane is not bonded or clamped to the drain flange, water runs down the outside of the pipe.
- Inside corners. Corners flex as the house moves, and grout cracks there first. Pre-formed membrane corners, and silicone rather than grout in every change of plane, ride out the movement.
- The valve and shower head. Every hole through the wall gets a sealed collar.
- Benches and niches. Flat surfaces hold water, so the shelf slopes toward the shower and the membrane wraps inside before tile. In Ottawa, keep the niche off an exterior wall, where cold sheathing and a humid niche make condensation.
A curbless shower adds one more step: the subfloor in the shower zone is dropped about 1.5 inches so the finished floor runs level, which means cutting or reinforcing joists. A linear drain at one end lets the floor slope one way and suits large-format tile.
The bathroom in Nepean we ripped out
A couple in Nepean called us in early 2024. They had renovated their main bathroom in 2021 with a contractor they found through a friend. They chose the cheapest bid.
By 2023 they noticed two things. The grout in the shower had cracked along three lines. And there was a dark spot on the ceiling of the dining room directly below the bathroom.
They had a plumber check, no leak from the supply lines. The dark spot grew. They called us.
We opened the dining-room ceiling. The joists above were saturated, two were starting to rot at the bearing point. The subfloor under the shower drain was so soft you could push a screwdriver through it. The wall cavity behind the shower was wet from floor to ceiling. Mould had grown across the back of the green board for the entire shower wall.
The original contractor had tiled directly onto green board with no membrane and caulked the corners with silicone, which lasts about 18 months in a wet area. When the silicone failed, water ran behind the tile, soaked the green board, ran down the back of the wall, and found the joist cavity.
The remediation scope, line by line:
- Full demolition of the bathroom
- Mould remediation by a certified company (3 days, sealed enclosure, HEPA filtration)
- Replace 4 floor joists, sister 2 more, replace the subfloor section
- Repair the dining-room ceiling, repaint
- Rebuild the bathroom (this time with Schluter)
Their "savings" on the waterproofing line cost them a structural remediation, a rebuild and 6 weeks without the bathroom. The remediation bill ran many times what proper waterproofing would have added at the start.
How to tell if a shower is leaking right now
If your bathroom is more than 5 years old and the contractor was on the cheap end, run through these checks tonight:
- Look at the grout. Any cracks, especially at corners and changes of plane? Water is getting in.
- Push on the tile. If any tile flexes or sounds hollow, the substrate behind has failed.
- Check the ceiling below. Stains, soft spots, peeling paint directly under the bathroom indicate active leaking.
- Smell the bathroom in the morning. A musty smell after 8 hours closed up means moisture in the wall cavity.
- Look at the silicone caulk. Black spots or peeling means the seal is gone.
If more than two of those apply, you have a problem, and the earlier you act, the less it costs.
Three checks narrow it down before anything is opened:
- A pinless moisture meter reads through the tile. Compare the floor beside the shower with a dry spot across the room.
- An infrared camera shows wet areas as cold patches right after a hot shower. Home inspectors carry one, and you can ask us to bring ours to the site visit.
- A borescope through a tub access panel lets you see the back of the tub and the subfloor without cutting drywall.
What to ask before signing a bathroom quote
Ask these three before you sign:
- "What waterproofing system are you using behind the tile?" The answer should name a product (Schluter-Kerdi, RedGard, Wedi, Aquadefense). If the answer is "we use green board" or "tile and grout is waterproof," walk away.
- "Will the system be water-tested before tile goes on?" A Schluter shower can be plugged at the drain and filled with 1 inch of water; if it holds for 24 hours, the membrane is good. Schluter's handbook strongly recommends the test, after the thin-set has had at least 24 hours to set.
- "Which warranty covers the membrane?" Schluter's Shower System carries a 10-year limited warranty, and Schluter says an installation set with its own thin-set mortars may be eligible for lifetime coverage. The contractor should be able to name which applies to your shower.
Waterproofing inside a full bathroom
If one contractor bids well under the others on a bathroom, look at the substrate and waterproofing lines. That is usually where the gap is: the cheap bid skipped the membrane.
On a full rebuild the membrane is one step in a fixed order: demolition, any repairs to the subfloor and framing, plumbing rough-in with the valve, backer board, membrane and water test, then tile. Dream Touch runs every bathroom renovation in Ottawa in that order, with the design in 3D renderings and a written, fixed-price contract that names the waterproofing system.
If you want to know what is behind your shower tile, or you are about to start a bathroom and want the spec right, call (613) 862-4555 for a free design consult. Better to know now than from a brown spot on the ceiling below.
Frequently asked questions
How long does shower waterproofing last?
A membrane installed to the maker's instructions is meant to last as long as the tile. Schluter backs its Shower System with a 10-year limited warranty, and up to lifetime coverage when its own thin-set mortars are used. A shower tiled onto green board with no membrane is the opposite case: we typically see those fail within 2 to 5 years, once the grout cracks.
Can you tile directly on drywall in a shower?
Not without a membrane over it. Ontario's Building Code accepts tile on moisture-resistant backing around showers, but gypsum board is not waterproof and lets water through once the grout cracks. Schluter's 2025 handbook does list gypsum wallboard as a backing its Kerdi membrane can go over, so the membrane, not the board, is what keeps the wall dry.
How many coats of RedGard does a shower need?
At least two when it is rolled or brushed, according to Custom Building Products' data sheet, with fabric set into the corners and seams. Each coat goes on pink and turns solid red when dry, typically in 1 to 1.5 hours, and no single wet coat should be thicker than 40 mils.
How soon after waterproofing can you tile?
Tile goes on once the membrane has passed its water test. Custom Building Products says RedGard can be flood tested once both coats are fully dry. Schluter's handbook recommends waiting at least 24 hours for the thin-set under Kerdi to set before the water test. A test that holds for 24 hours with no drop clears the shower for tile.
What goes on shower walls before tile?
In order: any framing repairs, the plumbing rough-in with the valve, a backer board, the waterproof membrane with sealed seams, corners and pipe collars, then the water test. Only after the shower holds water does tile go on, set in thin-set over the membrane, with silicone in the inside corners.
Can green board be used behind shower tile?
Green board meets the Ontario Building Code minimum, which asks only for moisture-resistant backing behind tile around showers and bathtubs. It is not waterproof, though, and on its own it lets water through once grout cracks. Schluter lists gypsum wallboard as an acceptable backing under its Kerdi membrane, so the real problem is a shower with no membrane, not the board itself.
What is the difference between Kerdi and RedGard?
Kerdi is a sheet membrane bonded to the backer with thin-set, with every seam covered by a 2 inch overlap and sealed collars at the valve and shower head. RedGard is a liquid membrane rolled, brushed or troweled on in at least two coats, with fabric at corners and seams. RedGard suits curbless showers and benches, where Kerdi corners get tricky.
How do you water test a shower before tiling?
Wait at least 24 hours after the membrane goes on so the thin-set can set, as Schluter's handbook advises. Then plug the drain and fill the shower base with 1 inch of water. If the level holds for 24 hours with no drop and nothing shows below, the membrane is good. Ask before signing whether the shower will be tested.
What are the signs a shower is leaking behind the tile?
Five checks reveal it. Look for cracked grout, especially at corners and changes of plane. Press on tiles: flexing or a hollow sound means the backing has failed. Check the ceiling below for stains, soft spots or peeling paint. Notice a musty smell after the room has been closed for 8 hours. Look for black spots or peeling in the silicone caulk.
What warranty comes with a Schluter shower?
Schluter's Shower System carries a 10-year limited warranty. Schluter also says an installation set with one of its own thin-set mortars may be eligible for lifetime coverage. Coverage depends on the installation following Schluter's written terms. Ask the contractor which warranty applies, and keep the product list with the house papers.
Official references
- 2024 Building Code Compendium, Part 9 (Articles 9.29.2.1, 9.29.2.2, 9.29.10.3 and 9.29.10.4), Government of Ontario (read 2026-11-11)
- Schluter-Shower System Installation Handbook (2025), Schluter-Systems (read 2026-11-11)
- Warranty Program Summary, Schluter-Systems Canada (read 2026-11-11)
- Technical Bulletin 53: RedGard in Custom's Shower Installation System, Custom Building Products (read 2026-11-11)
- RedGard Waterproofing and Crack Prevention Membrane, technical data sheet, Custom Building Products (read 2026-11-11)