Load bearing wall removal in Ottawa

Updated Nov 16, 2026 · 5 min read · By Dream Touch Renovations Ottawa

A contractor showing a homeowner the exposed framing and brick of a wall in an older Ottawa house before removal
← All articles

Load-bearing wall removal means replacing the wall with a beam that carries the same load down to the foundation. In Ottawa that takes a City building permit, a beam designed for the load (usually by a structural engineer), temporary shoring while the wall comes out, and an inspection before the ceiling closes. A partition wall needs none of that.

Most of these walls come out to open a kitchen to the dining or living room, so the work usually runs inside a full kitchen renovation in Ottawa. In other rooms it is usually one part of a larger home renovation in Ottawa.

What makes a wall load-bearing

A load-bearing wall carries the floor or roof above and passes that load to a wall, beam or footing below. Joist direction is the first check: joists running perpendicular to the wall, crossing over it, are almost certainly sitting on it. Other signs:

Those checks tell you what to ask the engineer, who gives the answer.

Why it needs an engineer and a permit

The City of Ottawa lists adding or removing walls to create different room sizes or uses among the projects that need a building permit. The permit drawings have to show the new beam, its posts and the load path to the foundation. Dream Touch's BCIN-certified designers draw that package and file the building permit in Ottawa through MyServiceOttawa.

Part 9 of the Ontario Building Code has span tables for ordinary wood lintels and built-up beams. Most open-concept beams fall outside them: almost any LVL or steel beam, and long spans. Those need a Professional Engineer licensed by Professional Engineers Ontario, who sizes the beam, the posts and the footing under each one.

Wiring moved out of the wall goes to a licensed electrical contractor, or the homeowner, with a notification filed with the Electrical Safety Authority. A gas line in the wall needs a TSSA-registered gas contractor.

How a load-bearing wall comes out, step by step

  1. Design: the engineer confirms the load path and sizes the beam, posts and footings.
  2. Permit: drawings and the engineer's letter go to the City.
  3. Shore: temporary walls go up on both sides to carry the floor above.
  4. Reroute services and remove the wall in sections.
  5. Prepare the bearing: posts are set, with new footings poured where the slab cannot take the point load.
  6. Set the beam with the connections the engineer specified.
  7. Inspect, then close in: the City inspects the framing while it is open.

A flush beam sits inside the joist depth, so the ceiling stays flat. A dropped beam hangs below the ceiling; it costs less and takes several inches of headroom.

In a 1948 Westboro semi we renovated, a bedroom wall above bore partly on the kitchen wall. The engineer specified a triple 1.75 by 11.875 inch LVL running the full 22 feet, set flush, with a hidden steel post inside a 30-inch column. The permit took three weeks through MyServiceOttawa.

The City's target for the first review of a complete permit application for a house is 10 business days, and work, demolition included, may legally start only once the permit is issued.

How to frame a header for a load-bearing wall

A header is the beam over a doorway or a partial opening in a load-bearing wall. It carries the load above the opening down through jack studs on each side. Its size comes from the Part 9 tables for ordinary spans, or from an engineer above that, and it still needs the permit and inspection.

  1. Build a temporary 2 by 4 wall about 4 feet from the opening, snugged to the ceiling with shims.
  2. Disconnect any wiring, then cut out the studs in the opening.
  3. Install full-height king studs at the outside of the opening, then the jack studs just inside them.
  4. Glue and fasten two plies of 2 by 8, 2 by 10 or 2 by 12 with a 1/2-inch plywood spacer between them, so the header matches the 3.5-inch wall.
  5. Set the header on the jack studs, fasten it to the king studs and fill above with cripple studs.
  6. Remove the shoring. Any sag in the ceiling means the header is undersized.

What drives the cost of removing a load-bearing wall

The cost moves most with the span and beam type, a flush or dropped beam, new footings under the posts, what sits above and any plumbing stack inside the wall. Add ceiling and floor repair and the City fee, which our guide to Ottawa permit fees explains.

Our guide to kitchen renovation cost in Ottawa shows how the structural lines sit beside the cabinets, and our guide to kitchen layouts shows which layout an opened room can take.

What goes wrong when it is done without a beam

One Orleans owner removed a kitchen wall without a permit or an engineer, with a single 2 by 6 for a header. Within six months the upstairs hallway sloped and the drywall cracked. The repair needed shoring, a three-ply LVL with new posts and new joists. To have a wall in your house looked at, book a free consult at (613) 862-4555.

Skipping the permit also costs money. When construction starts before a permit is issued, the City of Ottawa adds an administrative surcharge of 50 per cent of the regular permit fee, up to $10,000.

Frequently asked questions

Can you remove part of a load-bearing wall?

Yes. A partial opening gets a header or beam over it, sized for the load, with posts at each end. It still needs the same permit and beam design as a full removal.

Do I need a structural engineer to remove a load-bearing wall?

Usually. The Ontario Building Code's Part 9 tables cover only ordinary wood lintels and built-up beams, so almost any LVL or steel beam needs a design sealed by a Professional Engineer licensed in Ontario.

Can I remove a load-bearing wall myself?

The permit, the beam design and the inspections apply whoever does the work. Any gas line needs a TSSA-registered contractor, and a mistake in shoring or setting the beam lets the floor above sag.

How long does it take to remove a load-bearing wall?

A load-bearing wall takes about two weeks of site work, plus the time for design and the permit beforehand. The permit for Dream Touch's Westboro wall removal took three weeks.

Can a doorway be cut into a load-bearing wall?

Yes, with a header over the opening that rests on jack studs at each side. The work needs temporary shoring while the studs come out, and a building permit.

Official references

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →