A 4 season sunroom is a heated, insulated room built as part of your house, on a frost-protected foundation, with glass that meets Ontario's energy rules. A 3 season sunroom is unheated, sits on piers or a light footing, and closes for the winter. In Ottawa the difference shows up underground, in the glass, and on the permit.
The first question for a sunroom in Ottawa is whether you will sit in the room in February.
What a 4 season sunroom is, and how a 3 season room differs
On a drawing the two rooms look alike: glass on three sides, a roof, a door into the house. The difference is in the parts you cannot see once it is finished.
- Foundation. A 3 season room sits on screw piles or sonotubes. A 4 season room needs a frost wall or full foundation, with footings, weeping tile, dampproofing and an insulated slab or crawlspace.
- Glass. A 3 season room uses aluminum frames with single-pane or basic insulated glass. A 4 season room uses sealed insulated glass units, triple-pane in most cases.
- Roof. Metal or polycarbonate with no insulation cavity on a 3 season room. An insulated, ventilated roof on a 4 season room.
- Floor. A deck-level subfloor, often uninsulated, against an insulated floor that is part of the house envelope.
- Heat. None, or a small heater for spring and fall, against a zone off your HVAC or a mini-split of its own.
4 season: a heated addition
Ontario sets the insulation for a heated addition in Supplementary Standard SB-12 of the Building Code. For a one-storey sunroom in Ottawa, SB-12 Sentence 3.1.1.11.(3) accepts walls, windows and doors with a U-value of 1.4 or lower, or 1.2 in a house heated by electricity, and a roof of 2.6 or lower. The glass and the roof are specified to those numbers for each room.
Why an Ottawa winter decides between them
Three figures from the Ontario Building Code explain why a kit room built for a milder place struggles here.
- Snow. The Code's climate table, SB-1, sets the 1-in-50-year ground snow load at 2.4 kPa at Ottawa City Hall, Barrhaven and Orleans, and 2.5 kPa in Kanata. Dream Touch's sunroom page notes that this load calls for reinforced roof framing, which off-the-shelf sunroom kits rarely specify.
- Cold. SB-1 puts the January design temperature at -25°C at City Hall and -26°C in Orleans. That is the night a heated room's glass and heating are sized for.
- Frost. Code Table 9.12.2.2 puts footings at least 1.2 m down on clay or soils not clearly defined, and for a space with no heat, never shallower than the frost reaches.
Why "convert my 3-season to 4-season later" rarely works
You are rebuilding most of it. The piers won't carry an insulated wall load, the glazing isn't IGU, the roof has no insulation cavity and the floor isn't insulated. If you might want year-round use within 10 years, build it 4-season the first time.
Five questions settle it. Each "yes" pushes you toward 4-season, and two or more mean a 3 season room will disappoint you:
- Will you want to use it in February?
- Do you want it to count as living space for resale?
- Do you want to keep plants or art that can't survive freezing?
- Will you ever connect it to your central heating?
- Do you plan to stay in the home 10-plus years?
What drives the cost of each room
- The foundation. Frost wall vs piers is the largest single swing. Piers carry a light, uninsulated structure; a heated, insulated addition needs a closed envelope, which means a foundation.
- The glazing. Aluminum 3-season glazing costs far less per square foot installed than the triple-pane fiberglass or thermally-broken aluminum used for 4-season.
- The permit and engineering. The City of Ottawa lists sunrooms and solariums among additions, and under the Building Code Act a permit is required for an addition with a building area over 10 square metres. A 4-season room also carries architectural plans and a structural letter.
The City charges an addition's permit by its gross floor area, not by its construction value: $12.52 per square metre of new floor area on a detached, semi-detached or row house, in the City's 2026 Gross Floor Area Fee Schedule.
Where your lot changes the job
Glebe, Westboro and Old Ottawa South lots are narrow, and the back yard is where a sunroom goes. Section 801 of Zoning By-law 2026-50 keeps a rear yard of at least 6 metres in the Neighbourhood zones, and never asks for more than 7.5. A room that reaches past the line needs a minor variance from the Committee of Adjustment.
Kanata and Barrhaven post-2000 builds usually have the easiest 4-season additions: the HVAC is sized for expansion and the rear setbacks are generous. In Hintonburg and Mechanicsville century homes the existing HVAC often can't handle the new load, and a dedicated mini-split is the better answer.
A 4 season sunroom Dream Touch built
Malek, in a Google review on 2026-10-26:
"We had an excellent experience with Dream Touch Renovations building our 4-season sunroom! The quality of the workmanship was outstanding, and we couldn’t be happier with how everything turned out."
Dream Touch's portfolio also lists a four-season sunroom addition in Stittsville, 2024, built with integrated heating.
How to choose a builder: six questions to ask
- Is the foundation frost-protected? Show me the detail.
- What snow load is the roof designed for? (SB-1 sets 2.4 kPa at City Hall and 2.5 kPa in Kanata.)
- What's the glazing U-value? (SB-12 accepts 1.4 or lower for a heated sunroom's walls, windows and doors.)
- Who's pulling the permit and what does the drawing package include?
- How does this attach to my existing house structurally?
- What's your fixed price including contingency, and what changes the number?
A heated room goes through the same building permit in Ottawa as any addition: drawings, a structural letter, and inspections at the excavation, foundation, framing, insulation and final stages. Call 613-862-4555 for a fixed-price number on your footprint.
Frequently asked questions
What is the difference between a 3 season and a 4 season sunroom?
A 3 season sunroom is an unheated room used from May to October, on piers or a light footing. A 4 season sunroom is a heated addition on a frost wall or full foundation, with an insulated roof and floor and sealed insulated glass, built to Ontario's SB-12 energy rules like the rest of the house.
Is a 4 season sunroom worth it?
It is worth it when the room has to work in winter. Two or more yes answers to the five questions above (February use, living space at resale, plants or art, central heating, staying 10 or more years) point to a 4 season room.
Can a 3 season sunroom be converted into a 4 season room later?
Rarely, without rebuilding most of it. The piers will not carry an insulated wall, the glass is not sealed insulated units, the roof has no insulation cavity, and the floor is open to the cold.
Does a sunroom need a building permit?
In most cases, yes. The City of Ottawa lists sunrooms and solariums as additions, and under the Building Code Act a permit is required for an addition with a building area over 10 square metres.
How much is an all season sunroom?
Four choices set it: the foundation, the glass package, the insulated roof, and how the room is heated. The one published figure is the City's permit fee of $12.52 per square metre of new floor area on a detached, semi-detached or row house, and Dream Touch prices the rest in a written proposal after a site assessment.
Official references
Pages read 2026-11-11.
- Keeping the Heat In, Natural Resources Canada
- 2024 Building Code Compendium, SB-1 Climatic and Seismic Data, Government of Ontario
- 2024 Building Code Compendium, SB-12 Energy Efficiency for Housing, Government of Ontario
- 2024 Building Code Compendium, Part 9 Housing and Small Buildings, Government of Ontario
- Addition: Do I need a building permit?, City of Ottawa
- Building By-law 2014-220, Schedule A, classes of permits and fees, City of Ottawa
- Gross Floor Area Fee Schedule, 2026, City of Ottawa
- Zoning By-law 2026-50, Part 8, Neighbourhood Zones, City of Ottawa