← All articles
Permits & Legal

Tarion Warranty
When It Applies to Your Ottawa Renovation

Nov 24, 2025 · 6 min read · By Dream Touch Renovations Ottawa

Tarion Warranty: When It Applies to Your Ottawa Renovation
← All articles

A homeowner in Kanata called us last fall, panicked. Her contractor had vanished mid-project after collecting a large deposit. She wanted to file a Tarion claim. The unfortunate answer: Tarion does not cover renovations of existing dwellings. She had spent the deposit, and that money was gone unless she could chase the contractor in Small Claims.

Most Ontario homeowners assume Tarion covers any home. It does not. The rules are specific, and getting them wrong before you sign a contract can leave you completely exposed.

What Tarion Actually Is

Tarion (officially the Ontario New Home Warranties Plan Corporation) is the not-for-profit administrator of Ontario's statutory new-home warranty under the Ontario New Home Warranties Plan Act. Every new home built in Ontario by a registered builder is covered by Tarion.

Tarion is funded by builder enrolment fees, not by tax dollars. Tarion handles claims when builders default and pursues defective builders for repayment. As of 2021, Tarion's regulatory function was split out into the Home Construction Regulatory Authority (HCRA), which licenses builders. Tarion now focuses on warranty administration.

The Default Rule: Renovations Are Not Covered

Section 1 of the Ontario New Home Warranties Plan Act defines a "home" for warranty purposes. The Act applies to:

The key word is new. A kitchen renovation, a bathroom remodel, a basement finish, or even a sizeable rear addition on an existing house is not a "new home" under the Act. Tarion does not cover it. The contractor doing the work is not required to be Tarion-registered.

If your contractor disappears mid-project, your remedies are:

The Exceptions: When a Renovation Triggers Tarion

Two scenarios pull a renovation back under Tarion's umbrella.

1. Substantial Reconstruction (the 50% Rule)

If you remove and rebuild more than 50% of an existing dwelling, the result may be deemed a "new home" under the Act. The threshold the regulator applies looks at:

A typical second-storey addition on a bungalow that adds 90 m² to a 100 m² ground floor often hits this threshold, especially when combined with foundation underpinning, wall reframing, and a new roof. Your builder needs to be Tarion-registered for that scope.

2. Major Additions (the Addition Rule)

Section 13 of the Act extends warranty to additions to existing homes when:

This second condition is key. The builder must opt in. Most renovation contractors are not Tarion-registered and will not enrol additions. A few specialty design-builders do offer Tarion-enrolled additions, and they price the enrolment fee into the contract.

The honest renovation contractor's position

If your project is a kitchen, bathroom, basement, single-room addition, or any work where the original structure remains, Tarion does not apply. Anyone who tells you otherwise is misinformed or selling fiction. Ask the contractor for their HCRA licence number and Tarion enrolment number. If they cannot produce both, the project is unenrolled.

What Tarion Covers When It Does Apply

For a Tarion-enrolled new home or major addition, the warranty has four layers:

Deposit Protection

Deposits paid to a builder are protected up to Tarion's statutory limit if the builder defaults before closing. Coverage is automatic on enrolled builds; confirm the current cap on tarion.com.

One-Year Warranty

From the date of possession, the builder warrants:

Two-Year Warranty

From possession, two years on:

Seven-Year Warranty

From possession, seven years on major structural defects: defects in load-bearing portions of the home that affect its load-bearing function or that materially affect the use of the home for the purpose intended.

This is the long-tail coverage that justifies Tarion enrolment fees on new builds. Foundation cracks, structural framing failures, and major settlement issues are covered for seven years.

How a Tarion Claim Actually Works

If you have a covered defect, the process is:

  1. Notify the builder. Always start here. Most defects are resolved between owner and builder without involving Tarion.
  2. Submit a Statutory Warranty Form. Tarion provides forms at 30-day, 1-year, and 2-year milestones for you to list defects.
  3. Builder repair window. The builder has a defined period (usually 120 days from receipt) to repair listed items.
  4. Tarion conciliation. If the builder does not repair, Tarion sends a conciliator to inspect. The conciliator's decision is binding subject to dispute.
  5. Tarion repairs. If the builder still refuses, Tarion repairs and bills the builder.
  6. License Appeal Tribunal. Either party can appeal Tarion's conciliation findings to the LAT.

Vendor Registration: How to Verify Yours

Before signing any new-home or Tarion-applicable contract:

  1. Go to tarion.com and click "Find My Builder"
  2. Search by builder name or registration number
  3. The page shows licence status, history of homes enrolled, and any past claims or chargebacks
  4. Cross-reference with the HCRA Public Registry for licence standing

An unregistered builder cannot legally sell a new home in Ontario. If a "builder" offers to sell you a new home without Tarion enrolment, that is illegal under Section 6 of the Act and exposes you to losing your deposit with no protection.

"The most painful Tarion calls we field are from people who paid a large deposit on a 'new home' to someone who turned out to be unregistered. The deposit was lost the moment it was paid."

What This Means for Your Ottawa Project

If you are planning:

Our Position on Tarion

Dream Touch Renovations is a renovation specialist (kitchens, bathrooms, basements, additions). The vast majority of our work is on existing dwellings and is not Tarion-eligible. We are transparent about this in every contract.

What we do offer:

If your project crosses the 50% rebuild threshold or involves new coach-house construction where Tarion does apply, we will tell you up front and route the build to a Tarion-registered partner. Contact us at 613-862-4555 for a feasibility review and an honest assessment of which warranty framework applies.

Frequently asked questions

Does Tarion cover home renovations in Ontario?

No. Tarion does not cover renovations of existing dwellings. The Ontario New Home Warranties Plan Act applies to new homes: a new one-family dwelling, a new building with no more than two units occupied by the owners, or a condominium unit.

A kitchen, bathroom, basement finish, or even a sizeable rear addition on an existing house is not a new home under the Act, and the contractor doing that work does not have to be Tarion-registered.

What can I do if my renovation contractor disappears with the deposit?

When a renovation contractor disappears mid-project, Tarion cannot help, because work on an existing home is not covered.

The remedies are a civil suit, in Small Claims Court up to its monetary limit or Superior Court above it, a lien claim against the property under the Construction Act, a claim on surety or completion bonds if the contractor carried them, which most residential contractors do not, and WSIB and CRA reporting where appropriate. For renovations, the real protection is the contract and its deposit terms.

When does a renovation or addition fall under Tarion?

A renovation falls under Tarion in two cases. The first is substantial reconstruction: removing and rebuilding more than 50 percent of an existing dwelling may make the result a new home under the Act, judged on how much framing and foundation is replaced.

A second-storey addition on a bungalow with underpinning, reframing and a new roof often crosses that line. The second is an addition that adds habitable floor area, built by a vendor who agrees to enrol it with Tarion.

What does the Tarion warranty cover, and for how long?

A Tarion-enrolled new home or major addition carries four layers of coverage. Deposit protection covers deposits up to the statutory limit if the builder defaults before closing. The one-year warranty covers defects in materials and workmanship, fitness for habitation and Building Code compliance.

The two-year warranty covers basement water penetration, cladding defects, and plumbing, electrical and heating system defects. The seven-year warranty covers major structural defects such as foundation cracks and framing failures.

How do I file a Tarion warranty claim?

A Tarion claim starts with the builder, since most defects are settled between owner and builder. Next, list the defects on a Statutory Warranty Form, which Tarion provides at 30 days, one year and two years. The builder then has a set window, usually 120 days from receipt, to repair the listed items.

If repairs do not happen, Tarion sends a conciliator whose decision is binding subject to dispute, and either party can appeal to the License Appeal Tribunal.

Official references

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →