Ottawa's zoning by-law is now two documents. Since 2026-03-11, a project has to meet the new Zoning By-law 2026-50 and the older By-law 2008-250, and where they differ the more restrictive rule applies, according to the City's New Zoning By-law page. Zoning decides what you may build on a lot; the building permit in Ottawa decides how.
What changed in 2026
City Council approved the new by-law on 2026-01-28 and enacted it as By-law 2026-50 on 2026-03-11. After an Ontario Land Tribunal decision on 2026-07-02, most of it is in force (City of Ottawa, Engage Ottawa, read 2026-11-16).
The old R1 to R5 residential zones are replaced by Neighbourhood zones, N1 to N6, each with a subzone letter, so a lot now reads N2D or N3C. Section 801 of Part 8, Neighbourhood Zones sets the split:
- The number (N1 to N6) sets density and height.
- The letter (A to F) sets lot width and yards. A is the most urban and F the most suburban.
- Exceptions and suffixes still override the base rules on some lots.
What each N zone allows
Table 801A of By-law 2026-50 caps how many homes a lot can hold and how tall the building can be:
| Zone | Units allowed | Maximum height |
|---|---|---|
| N1 | 0.8 per 100 m² of lot, 4 per building at most | 11 m and three storeys |
| N2 | 1.5 per 100 m² of lot, 6 per building at most | 11 m and three storeys |
| N3 | 2.5 per 100 m² of lot, 12 per building at most | 11 m and three storeys |
| N4 | no unit count | 14.5 m |
| N5 | no unit count | 30 m |
| N6 | no unit count | set by suffix or schedule |
A 450 m² lot in N1 works out to 3.6 units, and in N2 to 6.75, before the per-building cap. For a basement unit, a rear addition or a garden suite, the yards and the height usually answer the question first.
Setbacks under the new by-law
The subzone letter sets the minimum yards (Table 801B of By-law 2026-50):
| Subzone | Front yard | Side yards, total | Corner side | Lot width |
|---|---|---|---|---|
| A | 3 m | 1.8 m | 3 m | 6 m |
| B | 3 or 4.5 m | 1.8 m | 3 m | 7.5 m |
| C | 4.5 m | 2.4 m | 3 m | 10 m |
| D | 6 m | 3 m | 4.5 m | 15 m |
| E | 6 m | 3.6 m | 4.5 m | 18 m |
| F | 6 m | 9 m | 6 m | 24.5 m |
Subzone B's front yard is 3 m in Area E of Schedule A1 and 4.5 m elsewhere.
The rear yard
The rear yard is 25% of the lot depth, never less than 6 m and never required to be more than 7.5 m (Section 801(7)). That leaves more room for a home addition in Ottawa on a deep lot. The City's memo to Council of 2026-07-07 listed this rule in subzones A to C as still under appeal, so confirm it with the City for those lots.
Front yards beside older houses
Where a neighbour legally sits closer than the minimum, Section 802 lets your front yard drop to the average of the two abutting lots, or to the one neighbour's setback if only one has a building. It can never go below 1.5 m.
Building height
In N1, N2 and N3 a house can be 11 m and three storeys tall; N4 allows 14.5 m and N5 allows 30 m (Table 801A). Under Section 199, a flat roof is measured to its highest point, and a hip, gable, shed or gambrel roof to the midpoint between the eaves and the ridge, so a pitched roof can pass 11 m at the ridge and still comply.
Section 203 lets a dormer rise above an 11 m limit on a roof pitched at least 1 in 2, up to 2.5 m wide and no more than half the roofline.
Lot coverage
Lot coverage is the share of the lot covered by buildings, accessory buildings included (Section 199). The new by-law sets no overall lot coverage maximum in the N1 to N6 zones; the envelope the yards leave holds the house in. These caps still apply:
- Sheds and detached garages are limited to two per lot, covering no more than half of their yard and 55 m² of floor area together (Section 202).
- A coach house shares one cap with any sheds or garages in the same yard: half the yard and no more than 95 m² of footprint (Section 701).
If the lot's old R subzone carried a coverage cap under By-law 2008-250, that lower number still governs while both by-laws apply.
A worked example: a 15 by 30 m lot in N1D
A 450 m² lot zoned N1D has a 6 m front yard, side yards adding up to 3 m and a 7.5 m rear yard. That leaves a box 12 m wide and 16.5 m deep, 198 m² or 44% of the lot, for the house.
Why a project gets sent to the Committee of Adjustment
A design that misses one number but fits the intent of the zone goes to the Committee of Adjustment for a minor variance under Section 45 of the Planning Act; our guide to the committee of adjustment in Ottawa covers the hearing. More units than the zone allows needs a zoning by-law amendment, and some larger projects need site plan control in Ottawa.
How to read your lot
- Search the address on geoOttawa.
- Turn on the "New Zoning By-law 2026-50" layer and note the zone, subzone letter and any exception number.
- Turn on the "Zoning By-law 2008-250" layer and note the old R zone and subzone.
- Use the stricter number for each rule, and check the heritage and conservation authority layers.
Peter, whose family had a coach home built in their Kanata backyard under Bill 23, put it this way in his Google review:
“They handled everything: zoning, permits, drawings, construction.”
Before you pay for drawings on an addition or coach house, call 613-862-4555 and we will tell you what the zoning allows.
Frequently asked questions
What zone am I in Ottawa?
Search your address on geoOttawa and turn on the "New Zoning By-law 2026-50" and "Zoning By-law 2008-250" layers. Both apply until the old by-law is retired, and the stricter rule governs.
What are the current zoning by-laws in the City of Ottawa?
Two apply at once. Since 2026-03-11 a development has to comply with both Zoning By-law 2008-250 and Zoning By-law 2026-50, and where they differ the more restrictive provision applies.
What is N3C zoning in Ottawa?
N3 allows 2.5 units per 100 m² of lot area, up to 12 per building, at 11 m and three storeys. Subzone C sets a 10 m minimum lot width, a 4.5 m front yard and side yards totalling 2.4 m.
What is N2D zoning in Ottawa?
N2 allows 1.5 units per 100 m² of lot area, up to 6 per building, at 11 m and three storeys. Subzone D sets a 15 m minimum lot width, a 6 m front yard and side yards totalling 3 m.
Official references
- Zoning By-law 2026-50, City of Ottawa
- Part 8, Neighbourhood Zones (Sections 801 and 802), City of Ottawa, read 2026-11-16
- Part 2, General Provisions (Sections 202 to 204), City of Ottawa
- Part 7, Housing Provisions (Section 701), City of Ottawa
- New Zoning By-law, Engage Ottawa, read 2026-11-16