A garden suite in Ottawa is built as what the City calls a coach house: a separate dwelling unit in its own building on the same lot as your house. It needs a building permit, and Section 701 of Zoning By-law 2026-50 sets its size, height and setbacks, in urban, suburban and rural areas alike.

Dream Touch designs, permits and builds each one as a coach house in Ottawa, from the lot check to the final inspection. The City allows one beside a detached, semi-detached, linked or duplex house or a townhouse.

What a garden suite is: Ottawa's terms

The City of Ottawa defines a coach house as "a separate dwelling unit that is subsidiary to and located on the same lot as an associated principal dwelling unit but is contained in its own building."

In Ontario's Planning Act (section 39.1), a garden suite is a portable unit a council allows through a temporary use by-law for up to 20 years. In everyday speech the term means any permanent backyard unit, which Ottawa permits as a coach house.

TermWhere it is builtHow Ottawa treats it
Coach houseOwn building, rear yard or beside a lanePermanent unit, building permit, Section 701
Garden suite (Planning Act)Portable detached unitTemporary use by-law, up to 20 years
Secondary suiteInside the house, often the basementAdditional dwelling unit in the principal building

A suite inside the house follows different rules, which our guide to secondary suites in Ottawa covers, and our in-law suite guide covers one in the basement.

Why more Ottawa lots can take one now

Section 701 allows a coach house on a lot with up to four units in total, the coach house included, in the N1 to N6 Neighbourhood zones on city water and sewer. In most other zones the limit is three, and in the rural AG, RR, RU and NU zones it is two.

Ottawa's Zoning By-law 2026-50 was enacted on 2026-03-11, and the Ontario Land Tribunal's order of 2026-07-02 put the parts not under appeal in force, back-dated to that day.

The rules that shape a garden suite in Ottawa

Under Section 701 of Zoning By-law 2026-50, a coach house:

In the urban area, the City says a coach house must be serviced from the main house's municipal water and sewer connection. On a septic lot, the Ottawa Septic Office has to confirm the system can take the load.

A building permit does not authorize removing a protected tree, and a lot that misses one rule by a little can apply to the Committee of Adjustment for a minor variance.

How to build a garden suite: the steps

  1. Lot check: zoning, footprint, setbacks and servicing, with a current survey.
  2. Design, 4 to 8 weeks, by a BCIN-qualified designer or an architect.
  3. Permit through My ServiceOttawa. Our guide to Ottawa building permit fees explains how the City charges.
  4. Foundation, framing and finish. Footings sit at least 1.2 m down on clay or soils not clearly defined (Ontario Building Code Table 9.12.2.2).
  5. Inspections and occupancy, with the City inspecting in stages and the Electrical Safety Authority inspecting the wiring.

Garden suite layouts that fit the rules

The 3.6 m urban height limit makes a city garden suite a single storey, within the shared 95 m² cap.

The layouts that fit are a compact one-bedroom, a one-bedroom plus study (Dream Touch's Kanata coach house uses this plan), an accessible single storey built for a parent, and a converted garage that stood on the lot on 2015-09-14 (see how to convert garage to living space). A unit over a garage only works on rural lots, where the 6.1 m limit applies.

Garden suites Dream Touch has built

Dream Touch's portfolio lists eight backyard coach homes built from 2023 to 2025, between 450 and 750 square feet, in the Glebe, Kanata, Riverside, Orleans, Manotick, Dunrobin and Kars. Peter, whose family had a coach home built in Kanata, wrote in his Google review:

"Dream Touch built a coach home in our backyard under Bill 23. They handled everything: zoning, permits, drawings, construction. Our elderly mother lives there now and we generate rental income potential for the future. Excellent work."

To start, call (613) 862-4555 for a free feasibility review of your lot.

Frequently asked questions

Is a garden suite the same as a coach house in Ottawa?

In practice, yes. Ottawa permits a permanent backyard dwelling as a coach house, so a permanent garden suite in Ottawa is applied for as a coach house.

Do I need permission to build a garden suite in Ottawa?

Yes. The City requires a building permit for every coach house, applied for through My ServiceOttawa. A design that misses a zoning standard needs a minor variance from the Committee of Adjustment.

How big can a garden suite be in Ottawa?

Together with any shed and garage in its yard, no more than half the yard and 95 square metres at most; in the AG and RU rural zones, 95 square metres for the coach house alone. In the urban area it can be no taller than 3.6 m.

Are garden suites warm in winter?

A permitted garden suite is insulated to the Building Code's energy rules for housing, SB-12, like any new home. Dream Touch usually heats them with a cold-climate mini-split heat pump sized for the -25°C January design temperature that SB-1 lists for Ottawa City Hall.

Official references

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →