What a Bathroom Renovation Quote Includes
and What's Usually Extra

Apr 17, 2026 · 7 min read · By Dream Touch Renovations Ottawa

What a Bathroom Renovation Quote Includes, and What's Extra
← All articles

The first thing to know about Ottawa bathroom prices: a bargain "bathroom renovation" almost never includes the bathroom. It includes the cosmetic surface of one. The second a tile saw hits a 1985 Nepean shower wall, you're going to find why the cheap quote was cheap.

Bathrooms are the most water-loaded rooms in your house. Get the waterproofing wrong and you're looking at a major water-damage repair two years later. Get the slope wrong and your shower drains backwards. Get the venting wrong and your ceiling paint peels.

A 2026 Ottawa bathroom renovation quote changes with the type of bathroom, and so does what's in or out of the scope at each level. Every project comes with a clear itemized written proposal so the scope is never a guess.

Powder room: a fixture-driven scope

A powder room (also called a 2-piece, with just a toilet and sink) is the smallest bathroom we do, but it's not the cheapest per square foot. The fixtures, finishes, and labour all happen at the same complexity as a full bathroom, just with less of them. A fully finished powder room scope includes:

What pushes a powder room scope up: a wall-papered accent wall in a designer pattern, a custom millwork vanity, a marble counter, or a relocation of the toilet flange (which means cutting concrete or joists).

Main bathroom: three fixtures and a wet zone

The main 4-piece or 3-piece bathroom (toilet, sink, tub or shower) is where Ottawa homeowners invest most predictably. A complete main-bathroom scope includes:

What pushes a main bath to the top of its range

Same room, three upgrade decisions, and you're at the top of the range:

  1. Curbless shower: requires lowering the subfloor 1.5 inches in the shower area, often involves cutting joists with engineered straps. A meaningful added line item.
  2. Heated floor: adds the matting, thermostat, and tile-setting time, each itemized.
  3. Solid-surface or porcelain slab walls instead of tile: a premium over a tile install.

Primary ensuite: the widest scope

This is the suite-style bathroom that comes with the primary bedroom in newer Ottawa homes (Findlay Creek, Stittsville, the newer phases of Kanata) and the renovation that homeowners in older neighbourhoods are doing when they take a bedroom and convert it.

A properly built spa-grade ensuite is the widest scope we quote. Larger budgets buy slabs, steam, and integrated lighting that you'd see in a hotel. A full ensuite scope includes:

Watch out for: ensuites that share a wall with old bedrooms

If your ensuite is going next to a bedroom, sound transmission between rooms is a real problem. Code minimum drywall does almost nothing for plumbing noise. Plan for double drywall with green glue, insulated drain stack (cast iron or sound-rated PVC), and isolation pads on the toilet flange. We itemize this in the proposal. Skipping it is the #1 ensuite regret we hear.

Accessible bathroom: structure and the curbless build

This is the renovation we do for clients staying in their home as they age, or for someone who has had a mobility change. The price varies based on whether it's a main bath conversion or a new ensuite built for accessibility from day one.

Core elements that drive the cost:

For full-suite design and OBC compliance for aging-in-place projects, see our accessibility renovation work. We do permit-compliant grab-bar blocking and curbless wet rooms regularly.

Why cheap quotes fail (the waterproofing problem)

Here's the trap. A cheap bathroom quote almost always cuts in the same place: the waterproofing system behind the tile.

Real waterproofing in Ottawa, in 2026, looks like this:

This system, done properly, takes a tile-setter an extra day to a day-and-a-half, plus the membrane materials. It is a small line item against the whole job. The cheap quote skips it. Tile-on-greenboard with a vapor barrier behind it is technically what was done in 1985, but it fails.

We open three or four bathrooms a year that were renovated by someone else 5 to 10 years ago and find black mold at every seam.

The cheapest part of a bathroom is the part you can't see. Skipping it is what turns a renovation into a rebuild.

What's in scope, and what's almost always extra

A real Ottawa bathroom contract should clearly say what's in. Here's what's usually IN a quoted scope:

And here's what's almost always extra (read your contract). Each of these becomes its own itemized line if site conditions call for it, so there are no surprises mid-project:

For the full bathroom service breakdown, scope checklist, and design process, see our Ottawa bathroom renovation page.

The honest takeaway: budget the right scope from the start. A main bathroom done correctly is built to be dry and standing in 2046. The under-scoped version is a problem in the spring of 2029. A clear written proposal up front is how you tell the difference.

Frequently asked questions

What waterproofing should a tiled shower have?

Proper shower waterproofing starts with cement board such as Durock or HardieBacker on wet walls, screwed every 6 inches, with joints taped in alkali-resistant mesh and skim-coated with thinset. A Schluter-Kerdi sheet membrane or RedGard liquid membrane then covers the entire wet area.

The shower floor gets a mortar pre-slope, a sheet membrane and a final mortar bed sloped 1/4 inch per foot to the drain. The curb is wrapped on three sides, and the niche is waterproofed as its own wet area.

Can green board be used behind shower tile?

No. Tub and shower walls need cement board, never green board. Tile on green board with a vapour barrier behind it is how bathrooms were built around 1985, and it fails: bathrooms renovated that way 5 to 10 years earlier are regularly opened to find black mould at every seam.

A proper system uses cement board with a sheet or liquid membrane over the whole wet area, which adds a day to a day and a half of tile-setting time.

What is usually not included in a bathroom renovation quote?

Items that are almost always extra on a bathroom contract include joist repairs or sistering, subfloor replacement beyond a small patch, asbestos abatement on pre-1985 vermiculite or floor tiles, knob-and-tube replacement in pre-1950 walls, stack relocation or vent repairs, and wall framing changes for layout shifts.

A typical quoted scope covers demo and disposal, plumbing and electrical for the existing fixtures plus one GFCI, drywall, paint and trim, and rotted subfloor replacement up to 4 sq ft.

How do I reduce plumbing noise from an ensuite next to a bedroom?

Code-minimum drywall does almost nothing for plumbing noise between an ensuite and a bedroom. Plan for double drywall with green glue, an insulated drain stack in cast iron or sound-rated PVC, and isolation pads on the toilet flange.

Build those into the renovation from the start, since the wall is open anyway. Skipping the sound work is the most common regret homeowners report after an ensuite goes in next to a sleeping room.

What does a complete main bathroom renovation include?

A complete main bathroom renovation includes full demo to the studs with a subfloor inspection, new PEX and ABS rough-in for any relocated fixtures, a Schluter or equivalent waterproofing system in the wet area, cement board on tub and shower walls, a 60-inch tub or a 36 by 48 walk-in shower with curb, a single-handle pressure-balanced shower valve, a 36 to 48-inch vanity with a quartz top, an 80 to 110 CFM exhaust fan vented outside, and a new GFCI circuit.

Official references

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →