← All articles
How-To Guide

Home Accessibility Tax Credit for an Accessible Bathroom

Oct 14, 2026 · 6 min read · By Dream Touch Renovations Ottawa

How-To Guide article card, Dream Touch Renovations Ottawa
← All articles

The Home Accessibility Tax Credit lets a senior 65 or older, or someone eligible for the disability tax credit, claim renovation costs that make their home safer to live in. The Canada Revenue Agency caps eligible expenses at $20,000 a year on line 31285, so at the 14% federal rate the credit is worth up to $2,800 for 2026.

Wheel-in showers, walk-in bathtubs and grab bars are three of the four examples the federal Department of Finance gives for the credit, and Ontario has no matching provincial version. We build the shower and grab-bar side of that list, from the curbless floor to the blocking in the walls, as part of an accessibility renovation in Ottawa.

What the Home Accessibility Tax Credit is worth in 2026

The credit is non-refundable. It lowers the federal income tax you owe and stops at zero. The rate fell from 15% to 14% on 2025-07-01, and the CRA uses 14.5% for the whole of 2025:

Tax yearExpense capFederal rateMost the credit is worth
2024$20,00015%$3,000
2025$20,00014.5%$2,900
2026$20,00014%$2,800

The cap belongs to the person and the home together: a home with two qualifying people in it still has one $20,000 cap, which the people entitled to claim can split between them.

Who can claim it

The CRA uses two terms. A qualifying individual is 65 or older at the end of the year, or eligible for the disability tax credit at any time in the year. An eligible individual is someone claiming for them: a spouse or common-law partner, or a relative who claims, or could claim, certain caregiver or dependant amounts for them and lives with them.

The home has to be in Canada and owned by the qualifying person or by the claiming relative, and the qualifying person has to live in it. Renting from a landlord rules the claim out.

Which bathroom changes qualify

The CRA sets two tests. The work has to be a renovation of an enduring nature that is integral to the home. And it has to either let the qualifying person get into the home and be mobile or functional inside it, or reduce their risk of harm there. Bathroom work that fits:

The CRA leaves out anything that is not a permanent part of the home, such as a free-standing shower chair, along with routine repairs, appliances and work done mainly to raise the home's value. An invoice that lists the accessibility work on its own lines makes the claim easy to support.

If you do the work yourself, the CRA counts building materials, fixtures, equipment rentals, building plans and permits. The value of your own labour and tools does not count.

When to claim a medical expense instead: the 2026 rule

From the 2026 tax year, one expense goes on one credit. The Budget 2025 Implementation Act, No. 1, which received royal assent on 2026-03-26, stops an expense included in a medical expense claim from also counting toward the Home Accessibility Tax Credit. Up to the 2025 return, the CRA still lets you claim the same expense both ways.

Which route is worth more depends on income and on who claims, so ask whoever prepares the return before the work starts.

Does Ontario have its own accessibility tax credit?

No. The CRA lists no provincial line for this credit, and Ontario's Seniors' Home Safety Tax Credit covered only the 2021 and 2022 tax years.

The Ontario credit that can touch a bathroom is the Seniors Care at Home Tax Credit, a refundable credit for residents who turn 70 or older in the year. It pays 25% of claimable medical expenses up to $6,000, a maximum of $1,500, and its eligible expenses include grab bars, grips and rails.

The credit shrinks by 5% of family net income over $35,000 and is gone by $65,000 at most. It runs through the medical expense claim, so the 2026 rule above applies to it.

How to claim the credit, and the invoice you need

Add up the year's eligible expenses, to a maximum of $20,000, in the chart for line 31285 on the Federal Worksheet, and enter the result on line 31285 of the federal return. Keep invoices and receipts that show:

Work by a relative qualifies only if that relative is registered for GST/HST.

A grant does not shrink the claim. The CRA says the credit is not reduced by government assistance, such as grants and forgivable loans from the federal or a provincial government.

An Orléans bathroom built for a walker, 2024

In 2024 we renovated the primary bathroom of an Orléans home after the homeowner's husband came home following a stroke. He was expected to use a walker for the long term, and his occupational therapist reviewed the drawings and signed off on grab-bar heights and turning clearances. What went in:

The shower, the grab bars and the wider doorway are the kind of work the Department of Finance's examples describe, and we designed and waterproofed the room the way we run every bathroom renovation in Ottawa.

Sources

To plan an accessible bathroom, get in touch or call (613) 862-4555.

Frequently asked questions

Is the Home Accessibility Tax Credit refundable?

No. It lowers the federal income tax owed and stops at zero, so it pays nothing back to someone who owes no tax. That is why a supporting son or daughter who owes more tax sometimes makes the claim instead, or the two split it.

Who is eligible for the Home Accessibility Tax Credit?

Seniors 65 or older at the end of the year, and people eligible for the disability tax credit at any time in the year, are the qualifying individuals. A spouse, a common-law partner or a supporting relative who claims, or could claim, certain caregiver or dependant amounts for them can also claim.

Can I claim the Home Accessibility Tax Credit for my parent?

A child can claim when the CRA counts them as an eligible individual: a relative who claims, or could claim, certain caregiver or dependant amounts for the parent. The home has to be owned by the parent or by the claiming relative, and the parent has to live in it.

Does a walk-in shower qualify for the Home Accessibility Tax Credit?

It can. The Department of Finance names wheel-in showers, walk-in bathtubs and grab bars among the credit's examples. The CRA allows up to $20,000 of eligible expenses a year, worth up to $2,800 for 2026 at the 14% federal rate.

Can one bathroom expense be claimed as a medical expense and a home accessibility expense?

Not from 2026. The Budget 2025 Implementation Act, No. 1, given royal assent on 2026-03-26, stops an expense included in a medical expense claim from also counting toward the Home Accessibility Tax Credit, starting with the 2026 tax year. For 2025 and earlier returns, the CRA allows both claims on one expense.

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →