Dream Touch Renovations trusted Ottawa supplier and trade partners showroom
Our Ottawa Network · P.Eng Partners · Material Suppliers · Trade Specialists

Our Ottawa renovation partners.
The people behind every Dream Touch project.

A renovation company isn't just the people on-site. It's the engineers who stamp the drawings, the suppliers whose products we specify, and the Ottawa professionals we coordinate with on every project.

Call 613-862-4555
3
P.Eng partner firms
15+
Material partnerships
0 yrs
Of Ottawa relationships
20 yrs
Ottawa projects delivered together
Free design consult
No deposit required.
Permits + drawings
In-house engineering.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.
How We Work With Others

Good renovations require good relationships.

What separates good renovation contractors from bad ones isn't the workers on-site. It's the network that contractor has spent years building. A drafter who prepares clean permit drawings. An engineer who returns calls. A supplier with reliable inventory. A mortgage broker who picks up the phone.

Over twenty years, Dream Touch has built a specific Ottawa network of professional partners, material suppliers, and community relationships. This page introduces the main ones.

Category One

Professional Partners.

The engineers, designers, and consultants whose expertise complements our construction work.

Ottawa P.Eng Structural Engineering Partners

Three Ottawa P.Eng-licensed firms we've partnered with for over a decade. Different firms specialize in different scopes such as residential additions, commercial, foundations. We engage the right firm, manage coordination, integrate stamped drawings. Firm names shared during project engagement.

See structural coordination →

BCIN-Certified Architectural Design

In-house BCIN-certified designers prepare permit-ready drawings for most residential and small commercial projects. For larger or specialized projects, we coordinate with Ottawa-area OAA-licensed architects. Schedule 1 designer documentation on every submission.

See architectural plans →

Ottawa Heritage District Consultants

For projects in Ottawa's heritage conservation districts (The Glebe, Centretown, Sandy Hill, Westboro, ByWard Market), we coordinate with heritage consultants who navigate Built Heritage Committee review. Keeps heritage projects moving through approvals instead of stuck in committee.

Energy Consultants & Building Scientists

For whole-home renovations, additions, and accessibility projects seeking Canada Greener Homes Loan funding or energy certifications, we coordinate with Ottawa energy consultants and EnerGuide auditors. Unlocks federal and provincial funding that offsets renovation costs.

Category Two

Material & Trade Partners.

Manufacturers whose products we specify most often. Not sponsored endorsements, just partnerships that show up in our actual work.

Plumbing & Bathroom Fixtures

Kohler

Our most-specified fixture brand. Memoirs, Purist, and Veil for standard residential work. The Elevance accessibility line for barrier-free bathrooms; their integrated grab-bar systems are the cleanest we've worked with.

Moen

Mid-range fixtures that hold up well in Ottawa homes. The Home Care accessibility line provides 500-lb rated grab bars at reasonable prices. Standard Moen faucets routinely outlast warranty periods.

Grohe & Delta

European-engineered Grohe for premium residential bathrooms. Delta for dependable mid-range and commercial applications. Both brands stand behind their warranties, which matters more than marketing copy.

Accessibility & Specialty Products

Pressalit

Danish-engineered accessibility hardware including grab bars, fold-down supports, toilet lifts. 660-lb rated, used in Scandinavian hospitals. More expensive than standard hardware, but worth the difference between catching a fall and causing one.

Schluter-Kerdi

Industry-standard zero-threshold shower waterproofing. Essential for barrier-free bathrooms and premium residential ensuites. We install strictly to Schluter's published specifications.

Lifeway Mobility

Ottawa-based installer for stair lifts, platform lifts, and home elevators. Local service matters for powered equipment. Lifeway handles warranty and maintenance across Ottawa, which is why we coordinate through them.

Kitchen & Custom Millwork

Blanco & Fleurco

Blanco sinks and Fleurco shower enclosures are our default specifications. Both Canadian-distributed, both with reliable inventory and parts, both hold up well in Ottawa conditions.

Custom Millwork (In-House)

Kitchen cabinetry, bathroom vanities, built-in millwork, and custom pieces built in our Nepean shop. Claude runs the shop and has been with Dream Touch since 2008. Shop-built work lets us control timelines, quality, and design adjustments that outsourced cabinet orders can't match.

Category Three

Ottawa Community Partners.

Twenty years in Ottawa means local professionals, suppliers, and services our clients benefit from. Ottawa people we work with regularly, not corporate partnerships.

Trusted Ottawa Mortgage Brokers

For clients asking about renovation financing, we introduce Ottawa mortgage brokers we've worked with for years. Specialists in HELOCs, refinancing, and Bill 23 multi-unit financing. No commissions, just a network of licensed professionals we trust.

See financing options →

Ottawa Sub-Trades

Licensed Ottawa electricians, plumbers, HVAC contractors, and specialty trades we've worked with for years. Many have been on Dream Touch projects since 2010 or earlier. Continuity matters: the same electricians who wired your neighbour's renovation are on your project.

Ottawa Lumber & Construction Supply

Rona Pro, Home Depot Pro, and several Ottawa-area independent lumber yards. Long-standing commercial accounts let us access specialty stock, coordinate large deliveries, and maintain preferred pricing we pass along to clients.

Local Disposal & Recycling Partners

Ottawa-area waste management for construction debris removal and material recycling. Responsible disposal, including recycling of metals, wood, and cardboard, is part of every project. Not glamorous, but it matters.

Accreditations

Certifications, licenses, and memberships.

Formal credentials behind our Ontario renovation business.

01
Registered Ontario Business

Registered Ontario renovation contractor, operating since 2005. Permit drawings prepared under BCIN Schedule 1 via the Ministry of Municipal Affairs and Housing. Fully insured.

02
$2 Million Commercial Liability Insurance

Commercial general liability through a licensed Ontario insurer. Certificate available on request for commercial clients.

03
WSIB Active

Workplace Safety and Insurance Board registration. Active clearance certificates available for property managers and commercial clients.

04
Google Business Profile 4.7★

4.7-star average across hundreds of verified Google reviews. All public and independently verifiable.

05
BCIN Schedule 1 Designer

Building Code Identification Number via our in-house design team. Authorized to prepare and submit permit drawings under the Ontario Building Code.

Common Questions

Partner questions.

How we work with suppliers, sub-trades, and professional partners, answered honestly.

Call 613-862-4555
Standard contractor pricing on supplier partnerships, the same preferred-account rates most licensed GCs access. No commissions or kickbacks on fixture specifications. Nothing for mortgage broker introductions; we introduce clients to brokers we trust, period. Engineering fees go directly to our P.Eng firms with no markup.
Professional engineering requires a P.Eng license through Professional Engineers Ontario, a designation we don't hold. We specialize in construction; our P.Eng partners specialize in engineering. You get specialized expertise from firms focused entirely on structural design, coordinated through our project management.
Yes. The suppliers listed here are our defaults based on twenty years of working with them. If you have existing relationships or specific preferences, we coordinate accordingly. Client preference takes priority on finish selections as long as products meet code and quality requirements.
Mix. In-house carpentry and general construction crews are employees. Specialty trades (electrical, plumbing, HVAC) are long-standing subcontractors, many working on Dream Touch projects for over a decade. All licensed, insured, and maintaining their own WSIB coverage.
Yes. Certificate of insurance, WSIB clearance, Ontario contractor license, and other credentials available on request, routinely provided to commercial clients, property managers, and landlords as standard documentation. Call 613-862-4555 or email to request.
Your Renovation, Our Network

The professionals behind every Ottawa project are part of yours.
Let's start.

When you hire Dream Touch, you hire the full network: engineers, designers, suppliers, sub-trades, community partnerships. Every relationship we've built over twenty years works for your project.

Call 613-862-4555