What Is Basement Underpinning?

Nov 5, 2026 · 7 min read · By Dream Touch Renovations Ottawa

Unfinished basement during framing, with exposed floor joists, ducts and plumbing overhead and a bare concrete floor
← All articles

Basement underpinning lowers a basement floor by pouring new, deeper footings under the existing foundation walls, dug one short section at a time. In Ottawa it is the fix for a basement too low to finish or to legalize as a unit, and it needs a structural engineer's design and a City building permit.

Because it changes the structure, it is settled first in any basement renovation in Ottawa. The new floor height decides the drains, the stairs, the windows and every finish that follows.

What basement underpinning is, and the alternatives

There are three ways to deal with a low basement. Only the first two change the floor height.

An engineer decides which method is safe for a given house. How the room will be used decides which one is worth doing: a basement gym with overhead lifts asks more of the ceiling than a media room does.

Why lower a basement floor: the headroom the Code asks for

The Ontario Building Code, O. Reg. 163/24, sets ceiling heights in Article 9.5.3.1 and its Table 9.5.3.1. For a finished basement in a house, three rows of that table do most of the work:

A legal basement unit has its own minimum

A secondary suite, such as a basement apartment, is the exception. Sentences 9.5.3.1.(2) and (3) set its ceiling height at not less than 1.95 m, and its clear height under beams and ducting at not less than 1.85 m. Ontario's guide to adding a second unit says the 1.95 m applies over the entire required floor area, including the route to the exit.

So a basement that cannot reach 1.95 m once the slab, insulation, subfloor and flooring are back in has to gain height before basement apartment legalization can go ahead.

Why underpinning needs a structural engineer and a permit

The work digs out the ground a loaded wall stands on, so the size of every section, and the order they are dug in, are designed before the dig.

Part 9 of the Code gives ready-made footing sizes only for footings "not subject to surcharge" on stable soils with an allowable bearing pressure of 75 kPa or more (Article 9.15.1.1). Footings on filled ground, peat or sensitive clay are designed to Section 4.2, the engineering part of the Code.

The same article defines sensitive clay as soil where most particles are smaller than 0.002 mm, "including leda clay". That is the Champlain Sea clay the City of Ottawa has managed under its Clay Soils Policy since 2005, after trees drawing water from it were identified as a significant contributing factor in foundation damage.

Article 9.12.1.4 adds that every excavation must be carried out so it does not damage adjacent property or existing structures. Here the existing structure is the house itself.

The City of Ottawa permit and inspections

The City of Ottawa says the Building Code Act requires a permit to alter a building over 10 m². Its inspection list for a finished basement starts with an excavation inspection, required where pier footings or underpinning are involved. Inspections on building permits in Ottawa are booked 48 hours ahead.

How basement underpinning is done, step by step

  1. Measure the basement and decide what it will be: a legal unit or a family space.
  2. The engineer checks the walls and footings and asks for soil information where it is needed.
  3. The permit drawings go to the City, with the engineer's sealed foundation design and digging sequence.
  4. The basement is cleared, and the furnace, water heater or panel is moved or protected as the plan says.
  5. The old slab comes out, and the new footings are dug and poured in sequence, with the excavation inspection.
  6. Drainage, under-slab plumbing, granular fill and the soil gas barrier go in, then the new slab.
  7. The finish follows: framing, insulation, plumbing and the final inspection.

The new slab sits on at least 100 mm of coarse clean granular material (Article 9.16.2.1) and is at least 75 mm thick (9.16.4.3). Floors in contact with the ground must also resist soil gas leakage (9.13.4.2), and the same article calls for a radon extraction rough-in in dwelling units, unless the space under the floor is left accessible for one later.

Article 9.14.2.1 requires drainage at the bottom of every foundation wall, so when the footings drop, the drainage moves down with them. If the new floor ends up below the point where the house drain leaves the building, a floor drain or basement bathroom has to be pumped up.

Underpinning or bench footings: how the choice is made

The engineer decides what is safe. The owner's choice turns on:

Planning underpinning with Dream Touch

Dream Touch is a general contractor, not an engineering firm, and holds no P.Eng. Underpinning and lowering need P.Eng-sealed drawings, and we coordinate that design through partner firms licensed in Ontario, along with the permit, the inspections and the basement finish.

Not every basement suite needs a lower floor. On the 2024 Alta Vista basement on our portfolio page, a legal secondary suite for an aging parent, we worked within the existing foundation. We added an egress window, built a kitchenette and a three-piece bathroom, and put sound-dampening between the floors, 14 weeks from demolition to move-in.

Sources

Pages read 2026-11-05.

Frequently asked questions

What is basement underpinning?

Basement underpinning lowers a basement floor by pouring new footings under the existing foundation walls at a deeper level, dug and poured in short sections so the wall stays supported. In Ottawa it needs a structural engineer's sealed design and a City building permit.

What are the alternatives to underpinning?

Bench footings are the main one. The old footings stay put, a concrete bench is poured along the inside of each wall, and only the floor inside the bench is dug lower, at the cost of a strip of floor around the room.

How deep should underpinning go?

Deep enough that the finished room meets its target height once everything is back on top. A legal basement suite needs a ceiling height of at least 1.95 m. The engineer sets the final footing depth.

Do you need a permit to underpin a basement in Ottawa?

Yes. The City of Ottawa says the Building Code Act requires a permit to alter a building over 10 square metres, and lowering the footings under a house is a structural alteration. The City's inspection list for a finished basement starts with an excavation inspection where underpinning is involved.

Why would a house need to be underpinned?

One is headroom: the basement is too low to meet the ceiling heights in Article 9.5.3.1 of the Ontario Building Code once it is finished. The other reason is a foundation that needs deeper support, a repair an engineer designs.

Is underpinning risky?

It carries real risk, because each section takes support away from a wall that is holding up the house. The risk is managed by short sections dug in the engineer's order, new concrete under each one before the next is opened, and the City's excavation inspection.

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote →

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote →