A basement egress window in Ontario must open from inside without tools and give an unobstructed opening of at least 0.35 m², with no dimension under 380 mm. A window well needs 550 mm of clear space in front of it. One such window is required on each floor level that has a bedroom.
A door on the same level that leads straight outside can take the window's place. The rule decides whether a lower-level room can be a bedroom, so it belongs at the start of any basement renovation in Ottawa that adds one.
What the Ontario Building Code requires
Article 9.9.10.1 of the 2024 Ontario Building Code sets the rule. Except where a door on the same floor level as the bedroom gives direct access to the outside, every floor level containing a bedroom in a suite needs at least one outside window that:
- opens from the inside without tools;
- gives an individual, unobstructed open portion of at least 0.35 m², with no dimension less than 380 mm;
- stays open at that size without needing to be held or propped.
Four more sentences in the article shape the details:
- Sill height: the window may be no more than 1,000 mm above the floor, except in basement areas, where the Code sets no maximum.
- Window well: a clearance of at least 550 mm in front of the window.
- Swing: a sash that swings into the well must not cut that clearance in a way that blocks escape.
- Cover: any protective enclosure over the well must open from inside without keys, tools or special knowledge.
Per floor level, not per bedroom
The Code counts floor levels. A basement with two bedrooms needs at least one compliant window on that level; many layouts give each bedroom its own, which is often the better plan. On a walkout basement, the door on the same level replaces the window.
Window limiters
Article 9.8.8.1 normally asks for a guard, or a limiter that stops an openable window at 100 mm. Sentence (5) drops that rule where the bottom of the opening is more than 900 mm above the floor, or less than 1,800 mm above the floor or ground on the other side.
Where a limiter is fitted to an egress window with a sill under 900 mm, the City of Ottawa's egress window advisory says it must be possible to bypass it without tools.
Why the clear opening is not the window size
The 0.35 m² is the open portion a person climbs through, and this is where inspectors and window salespeople often disagree. The rough opening and the glass are not the measure: the frame, the sash and any hardware come off it.
- Casement: hinged on the side and cranked fully open, it gives most of its sash area. A clear opening of 500 mm by 750 mm is 0.375 m², which passes.
- Slider: sentence 9.9.10.1.(6) applies the 380 mm minimum to the openable portion alone. Only the sliding half counts.
- Hung windows: only the openable sash counts, so the whole unit has to be large enough for one sash to reach the minimum.
That is why a casement is the usual egress choice: in the same rough opening, it can pass where a slider fails.
What to ask the supplier
Ask the window supplier for the model's clear-opening dimensions in writing, and match them to the drawings before ordering.
Window companies publish a clear-opening table per model and size. If the salesperson cannot produce the numbers, do not assume a window meets 9.9.10.1 because it fits the rough opening.
Bring the manufacturer's spec sheet to the inspection, so the inspector can check the clear opening against it.
The sill in a basement
City of Ottawa Building Code Services' egress window advisory (August 2025) adds one more check for basements: a window well deeper than 1,000 mm needs a way to help the occupant climb out, such as built-in steps or a ladder.
The 1,000 mm sill limit does not apply in basement areas. A basement window high on the wall can still serve as the egress window, though a reachable sill makes it a far better escape route, especially for a child or an older parent.
Why a bigger opening needs a permit
The City of Ottawa lists adding a window where there was none, and enlarging or relocating a window or door opening, as work that needs a building permit. Replacing a window in the same-size opening does not.
Cutting a foundation wall changes how it carries the house above. The new opening needs a lintel sized for that load, shown on the drawings for the building permit in Ottawa, and the City inspects it with the rest of the basement.
Where inspections fail
In two decades of watching Ottawa City inspectors at work, these are the failures we see again and again:
- The window is in, but its clear opening is under 0.35 m² because the owner went by the rough opening. The fix is a new window, which is expensive.
- The well has no drainage, and the inspector finds standing water in it at the framing inspection. The fix is to connect it to the weeping tile over a gravel base so it drains.
- There is no structural calculation for the lintel above the cut. The fix is a P.Eng review and revised drawings, then a resubmission.
- The well cover needs tools to release from inside. The fix is a cover that opens from inside as the Code requires.
How an egress window is cut into a finished basement
Owners picture the finished bedroom. The job itself is an excavation outside, a structural cut through the foundation wall, and a drained well, all under a permit.
Cutting an egress window into an existing Ottawa foundation runs in this order:
- Measure and design. Fix the clear opening, the sill height and the well, and size the lintel. These go on the permit drawings.
- Locate services. Ontario Dig Authority, formerly Ontario One Call, says a public utility locate is required before anyone digs. Request it at least 5 business days ahead; it is free.
- Excavate outside down to below the new sill, for the window well and its drainage. The last of the dig against the wall goes by hand, so the bucket does not tear the foundation's waterproofing.
- Cut the foundation to the rough opening with a wet diamond saw, which keeps the silica dust down. The load above is held on temporary supports while the engineer's lintel goes in, and the framing inspection checks the lintel against the drawings.
- Set and seal the window, flash it, and insulate the jambs. Membrane goes on the outside of the wall around the new opening before any soil goes back.
- Build the well with at least 550 mm clear in front of the window, drained so it cannot fill, with steps or a ladder if it is deeper than 1,000 mm.
- Backfill and restore the yard, then finish the inside wall and trim.
Each window is a 2-4 day job for a competent crew, and the work moves a lot of dirt and dust through the property.
What drives the work
- access: a side yard narrower than a small excavator means hand digging;
- the foundation: poured concrete cuts cleanly, while block and stone need more care around the opening;
- what sits outside: a deck, a walkway, gas or water lines, or landscaping to put back;
- the well: its depth, its drainage and its cover.
We typically install wells 48" x 60" or larger, often custom-formed concrete wells set into the existing foundation.
The Code's minimum is one compliant window for each floor level with a bedroom, so the number of windows is a design choice worth settling early. Each extra window means another dig, cut and well, and each can make one more room a bedroom.
What else a basement bedroom needs
The window is one of several Code items that make a basement room a bedroom. Article 9.10.19.3 requires a smoke alarm on every storey, including the basement, and on any storey with sleeping rooms, one in each sleeping room and one between the bedrooms and the rest of the storey.
Under Article 9.10.19.4, those alarms are wired to a circuit with no disconnect switch, with a battery that keeps them working for at least 7 days if the power fails.
Draining the well
A window well collects rain and spring meltwater. If it cannot drain, it floods the basement bedroom or rots the window over a few seasons.
The ways to drain it:
- Tie the well into the perimeter weeping tile with a 4" perforated pipe and a gravel base. It is the most reliable over the long term, but the weeping tile has to be opened up while the well goes in.
- Dig a drain pit 2-3 ft deep below the well floor and fill it with clear stone, so water soaks into the soil around it. It works in soil that drains and is less reliable in Ottawa's clay.
- Run a drain line to daylight, sloped to a point on the lot where water runs away from the house. It needs a lot that falls away.
- Put in a sump pit, where a pump lifts the water out. It needs power, and a pump that keeps working.
Whichever you choose, the well floor should be 4-6 inches of clear stone, not bare soil, with the window sill at least 150mm above the floor of the well.
Egress windows in Dream Touch basements
Dream Touch's portfolio describes an Alta Vista basement from 2024: a family that had lived with an unfinished basement for fifteen years wanted a legal secondary suite for an aging parent and a family rec room. We worked within the existing foundation, added a proper egress window, and built a compliant kitchenette and three-piece bathroom. It took 14 weeks from demolition to move-in.
Denise, in a Google review on 2017-01-12, described the same kind of job: "We hired DTR to renovate our basement into an in law suite and that involved new plumbing, electrical, changing the window size, putting in a kitchenette, new lighting, 3 piece bath and creating storage wherever possible."
An in-law suite for a parent raises more questions than the window, from ceiling height to fire separation. The free design consult is where Dream Touch measures the openings and the wall for yours.
We cut egress windows as part of basement renovations and legal suites, and we coordinate the engineer, the permit, the concrete cutting, the excavation, the framing and the inspections, so you deal with one contact and one fixed-price contract.
To have the egress windows priced inside a fixed-price basement contract, call 613-862-4555 or use the contact form.
Frequently asked questions
What size does a basement egress window need to be in Ontario?
Article 9.9.10.1 of the Ontario Building Code requires an unobstructed open portion of at least 0.35 m², with no dimension less than 380 mm. The window must open from inside without tools and stay open without extra support. Those are clear-opening measurements, taken with the window fully open, not the size of the frame or the glass.
Does every basement bedroom need its own egress window?
The Code requires at least one compliant window on every floor level that contains a bedroom, unless a door on that level opens directly outside. It does not require one per bedroom. Many basement layouts still give each bedroom its own window, which shortens the escape route and is often the better design for a suite.
How much space does an egress window well need?
Where the required window opens into a window well, the Code requires a clearance of at least 550 mm in front of the window. A sash that swings into the well must not reduce that space in a way that blocks escape, and any cover over the well must open from inside without keys, tools or special knowledge.
Is there a maximum sill height for a basement egress window?
Not in a basement. Article 9.9.10.1 limits the sill of the required window to 1,000 mm above the floor everywhere except basement areas. A reachable sill still makes a much better escape route, especially for a child or an older parent, so it is worth designing for even where the Code does not demand it.
Do you need a permit to enlarge a basement window in Ottawa?
Yes. The City of Ottawa lists enlarging or relocating a window or door opening, and adding a window where there was none, as work that needs a building permit. Replacing a window in the same-size opening does not. A cut foundation wall needs a lintel sized for the load above, shown on the permit drawings.
What is the best style of window for egress in a basement?
A casement, in most basements. It is hinged on the side and cranks fully open, so nearly all of its sash counts toward the 0.35 m² clear opening that Article 9.9.10.1 asks for. A slider or a hung window only counts its opening half, so it needs a much larger unit to pass.
Can a sliding window be an egress window?
Yes, if the sliding half alone meets the rule. Sentence 9.9.10.1.(6) of the Ontario Building Code applies the 380 mm minimum to the openable portion, and that portion must also reach 0.35 m² and stay open without being held. Ask the supplier for the model's clear-opening size in writing before ordering.
How much does it cost to put an egress window in a basement?
The site sets it: how the excavator reaches the wall, whether the foundation is poured concrete, block or stone, how deep the well goes, how it drains, the engineer's lintel and what has to be put back outside. Several windows in one job share the setup. We price egress windows inside a fixed-price basement contract after measuring the wall.
Can you install an egress window in winter?
Yes, with more work. Frozen ground is slower to dig, and the Ontario Building Code keeps the bottom of an excavation from freezing (Article 9.12.1.3). Below 5 °C, Article 9.3.1.9 keeps concrete between 10 °C and 25 °C while it is placed, then at 10 °C or more for 72 hours, so a patched or poured well needs heat.
Official references
- Do I need a building permit?, City of Ottawa
- 2024 Building Code Compendium, Part 9, Article 9.9.10.1, Government of Ontario, read 2026-11-11
- Finishing a basement: Do I need a building permit?, City of Ottawa
- Egress windows advisory, City of Ottawa Building Code Services, August 2025
- Locates overview, Ontario Dig Authority