A secondary suite is a self-contained apartment inside a house, with its own kitchen, bathroom, sleeping area and entrance. In Ottawa, a lot on city water and sewer can carry at least two additional units: two apartments in the house, or one apartment and one coach house. Every new suite needs a building permit, even when little construction is planned.
The Building Code calls it a secondary suite, the City calls it an additional dwelling unit, and older Ottawa by-laws said secondary dwelling unit. Most of the suites we build sit in a basement, so the job is a basement renovation in Ottawa plus the fire, egress, plumbing and permit items the Code adds for a second household.
What counts as a secondary suite
Ontario's 2024 Building Code defines a secondary suite as a self-contained dwelling unit in a house that holds only one other unit plus common spaces, with both units forming a single real estate entity (Division A, Article 1.4.1.2). Ontario set no size limit on the suite.
To work as its own home, the unit needs:
- A sleeping area
- Cooking facilities: a kitchen sink, a cooktop or range, and counter space
- A bathroom with a toilet, a sink, and a tub or shower
- Separation from the main house, either a fire separation or the 2024 smoke-tight barrier described below
- An entrance that does not pass through the main dwelling
Miss one of these and you have an in-law suite or a finished basement, not a second unit.
Where a secondary suite can go
- Basement apartment: the most common Ottawa suite. The ceiling height, the window openings, the plumbing rough-in and the electrical panel decide most of the scope.
- Upper-floor unit: the upper floor becomes the second unit, usually with a new exterior door or stair and often a second meter.
- Coach house or garden suite: a separate building in the rear yard. A single-storey backyard unit is usually called a garden suite, and the City treats it as a coach house.
Bill 23 and additional residential units
Bill 23, the More Homes Built Faster Act, 2022, amended Ontario's Planning Act so that a lot with a detached house, semi or rowhouse on municipal water and sewer can hold up to three residential units as of right. As of right means no rezoning and no minor variance for the number of units. Setbacks, height and lot coverage still apply.
Bill 23 left the Building Code alone. The units it allows still need egress, separation between the households, smoke alarms, permits and inspections.
The City of Ottawa now states that no additional parking space is required for an additional unit. Where you do add a space, it cannot go in the front yard, and tandem parking in the existing driveway is allowed.
A tax credit for a family suite
A suite built so a parent or another relative can live with you may earn a federal credit. The Canada Revenue Agency's Multigenerational Home Renovation Tax Credit covers work that creates a self-contained secondary unit where a senior, or an adult eligible for the disability tax credit, lives with a qualifying relative. It is 14.5% of up to $50,000 in qualifying costs per renovation, a maximum of $7,250.
What the City and the 2026 zoning by-law allow
The City of Ottawa's page on adding an apartment sets these conditions:
- On a lot with city water and sewer: at least two additional units, either two apartments in the house or one apartment plus one coach house. In the N1 to N6 Neighbourhood zones, Section 701 of Zoning By-law 2026-50 allows a coach house on a lot with up to four units in total.
- On a lot with a well or septic system: one additional unit or a coach house, once the Ottawa Septic Office confirms the system can take the load.
- Two apartments inside the house need a designer registered under a Building Code Identification Number (BCIN).
- The new unit needs its own access on the ground floor unless the building or fire code allows another route.
- The City's target for the first permit review is 15 business days.
Unit counts under By-law 2026-50
Zoning By-law 2026-50, enacted 2026-03-11, counts additional units and coach houses within each N zone's unit maximum (Section 801). The City's memo to Council of 2026-07-07 lists the number of units permitted in the N zones among the provisions still under appeal at the Ontario Land Tribunal, so confirm the count for a specific address with the City's development information officers at 613-580-2424, extension 23434.
For a coach house in Ottawa, Section 701 caps the building at 3.6 metres high in the urban area, at least 0.6 metres from the side and rear lot lines, and its footprint, together with any accessory buildings in the same yard, cannot exceed half of that yard, to a maximum of 95 square metres.
Sources: City of Ottawa, Adding an apartment (additional dwelling units) and Zoning By-law 2026-50 (Part 7, Part 8) and its memo to Council on the appeals (2026-07-07). City pages read 2026-10-05 and 2026-11-16.
Building Code requirements for a secondary suite
Ontario's 2024 Building Code, in force since 2025-01-01, rewrote the rules for a house with exactly two units. The Ministry of Municipal Affairs and Housing summarized the changes in its August 2024 Part 9 briefing.
1. Egress
Every bedroom needs a window or door to the outside that opens from the inside. Under OBC Article 9.9.10.1, a basement egress window needs at least 0.35 m² of clear opening with no dimension under 380 mm, and a window well needs 550 mm clear in front of the window (Article 9.9.10.1).
2. Separation between the two units
Under Article 9.10.9.16, one unbroken layer of 15.9 mm (5/8 inch) Type X drywall over the shared walls and the floor-ceiling framing can stand in for a fire separation between the two units. Every duct, pipe and wire that passes through that barrier gets sealed. A third unit puts the house outside the secondary suite definition, and the full fire separation rules for dwelling units return.
3. Ceiling height
Ceilings in the suite must be at least 1.95 m high, with 1.85 m clear under beams and ducts (Article 9.5.3.1). Height is measured from the finished floor to the lowest beam, duct or soffit. Where a basement falls short, basement underpinning lowers the floor.
4. Smoke and carbon monoxide alarms
Each unit needs hardwired smoke alarms with battery backup in every bedroom, outside the bedrooms and on every storey, interconnected so an alarm in either unit sounds in both. Since 2025, Article 9.10.19.5 allows wireless interconnection where the two units run on separate electrical services. CO alarms are required wherever there is a fuel-burning appliance or an attached garage.
5. Heating and ventilation
The 2024 Code limits how the air distribution systems of a house with a secondary suite can be interconnected (Article 9.33.1.1), so the heating and ventilation design goes in with the permit drawings.
6. Sound
Plan sound control into the ceiling from the start. On a Findlay Creek suite we built, the ceiling assembly met STC 50, and with a toddler upstairs the owners still heard footfalls. We came back at our cost and added resilient channel and another layer of 5/8-inch Type X.
Heads up
The unpermitted basement apartments we are asked to legalize usually fall short on three things: bedroom windows below the egress size, no continuous barrier across the basement ceiling, and battery-only smoke alarms that are not linked to the main house.
Secondary suite plumbing
A secondary suite adds a full kitchen, a bathroom and usually laundry on the lowest floor of the house, all draining to the same building drain as the main house. Where the main stack and the sewer exit sit decides where the suite's kitchen and bathroom can go, and how much of the slab gets cut.
Where the drains go
- Close to the stack: new fixtures tie in by gravity with short drain runs under the slab and new vents up through the walls.
- Far from the stack: longer drain runs, more slab cutting and new venting. Distance to the stack is the single biggest plumbing variable on a suite.
- Below the sewer: a fixture that sits lower than the sewer line drains to a sealed sewage ejector pit that pumps up to the building drain.
- Laundry: a stacked washer and dryer in the suite needs a drain, a dryer vent to the outside and a dedicated circuit.
A previous rough-in helps. The Findlay Creek suite started with a basement bathroom rough-in placed for a full bathroom, not a half bath, which kept the slab work small.
Hot water for two households
One water heater can serve both units, or the suite can have its own. On the Findlay Creek suite we installed a separate tank for the suite. Looking back, a heat-pump tankless water heater would have kept the mechanical room under 80 square feet.
The backwater valve and the City rebate
A suite puts a kitchen, a bathroom and a bedroom on the floor a sewer backup reaches first, so a backwater valve on the main sanitary line belongs in the plumbing plan. The City of Ottawa's Residential Protective Plumbing Program rebates the lesser of the cost of the work or a set maximum:
- An indoor sanitary backwater valve: up to $1,000, for homes built before 2012-01-01
- An indoor storm backwater valve: up to $1,000, for homes built before 2004-01-01
- A sump pump with battery backup: up to $1,500 in an existing pit, or $3,000 in a new pit
- The building permit fee for the protective plumbing work: 100 per cent
The City's rebate application has to arrive within 18 months of the building permit's issue date, a window the City extended on 2026-07-01.
Plumbing permits and inspections
The City's inspection list for basement work has three plumbing stages, each with a test: the underground plumbing before the slab is closed, the rough-in of drains, waste, vents and water piping, and the final plumbing with fixtures connected. Plumbing is a compulsory trade in Ontario, so the work goes to a licensed plumber unless a homeowner does it on their own home under the permit.
Permits, trades, and inspections
A secondary suite needs:
- Building permit, applied for online through My ServiceOttawa, with BCIN drawings where the City requires them. We prepare the building permit file.
- ESA electrical permit, separate from the building permit
- Plumbing, inspected under the building permit when fixtures are added
- Heating and ventilation design when the suite gets its own system
- TSSA gas work if a gas line is added for a range or dryer
The City says even a unit with limited or no construction needs a permit, because the change of use has to be reviewed against the Building Code. Inspections run in order and are booked 48 hours ahead: underground plumbing, framing, insulation, the barrier before it is covered, then finals on building, electrical and plumbing.
Legalizing an existing basement apartment
An Orleans homeowner bought a house with a "finished basement apartment" in 2018 and learned four years later, when the first tenant left, that it had never been permitted. The bedroom ceiling was 1.85 m, the egress window was 16 by 24 inches, there was no barrier between the floors, and the smoke alarms ran on batteries.
If you have been renting a basement without a permit, the steps are:
- Have a BCIN designer assess the unit against the Building Code and zoning
- Apply for a building permit to bring the unit to code
- Open ceilings and walls as needed for the barrier, egress, smoke alarms and ventilation
- Pass all inspections, close the permit, then rent the now-legal unit
Tenants and the Residential Tenancies Act
The moment you have a suite and a tenant, Ontario's Residential Tenancies Act applies: the standard lease form, notice rules for rent increases and limits on ending a tenancy. The Act applies to an unpermitted unit too, so legalizing does not change the landlord-tenant relationship.
Frequently asked questions
What counts as a secondary suite in Ottawa?
A secondary suite in Ottawa is a self-contained dwelling unit in a house that holds only one other unit. It needs a sleeping area, cooking facilities, a bathroom, separation from the main house, and an entrance that does not pass through the main dwelling.
Is it legal to rent a basement apartment in Ottawa?
Yes. Under Bill 23 and the City of Ottawa's rules, most lots on city water and sewer can hold at least two additional units. It is legal to rent once it is built or converted under a building permit and passes the City's inspections for egress, the barrier between the units, smoke alarms and plumbing.
What is the difference between a legal suite and an in-law suite?
A legal suite is a separate dwelling unit with its own kitchen, bathroom, sleeping area and entrance, built under a permit to the Building Code's rules for two units. An in-law suite is living space for family that is still part of the main home, often sharing an entrance or kitchen.
What plumbing does a secondary suite need?
A secondary suite needs plumbing for its own kitchen, a bathroom with a toilet, sink and tub or shower, and usually laundry, all tied into the house's building drain. Fixtures near the main stack drain by gravity; fixtures below the sewer line need a sewage ejector pit. The City of Ottawa inspects the underground, rough-in and final plumbing, each with a test.
Does a secondary suite need its own parking space in Ottawa?
No. The City of Ottawa states that no additional parking space is required for an additional dwelling unit. If you do add a space, it cannot be in the front yard, and tandem parking in the existing driveway is allowed.
What permits does a basement apartment need in Ottawa?
A basement apartment in Ottawa needs a building permit, applied for online through My ServiceOttawa, with BCIN drawings where two units are added inside the house. Electrical work needs a separate ESA permit, plumbing is inspected under the building permit, and a new gas line for a range or dryer needs a TSSA-certified gas fitter.