Renovation before and after in Ottawa by Dream Touch Renovations
Ottawa Renovation Portfolio · Westboro · Manotick · Orleans · ByWard Market · Across All Categories

Ottawa renovation portfolio.
20 years of projects. One standard of care.

Two decades of Ottawa renovation examples, including Westboro heritage kitchens, Manotick custom additions, ByWard Market restaurant builds, and Orleans accessibility projects. Browse by category to see real before-and-after projects.

Call 613-862-4555
500+
Ottawa projects completed
20 yrs
In the Ottawa market
4.7★
Google rating
33
Ottawa neighbourhoods served
Free design consult
No deposit required.
Permits + drawings
In-house engineering.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.
100s
Projects completed
20
Years in Ottawa
33
Neighbourhoods served
4.7/5
Average Google rating
The gallery

Browse our Ottawa work by space.

Modern basement living space with linear fireplace and built-ins, Alta Vista OttawaBasements

Modern Basement Living Space

Alta Vista · Ottawa
Custom kitchen renovation Ottawa ManotickKitchens
Kitchen Renovations Ottawa Dream TouchKitchens
Mohamad's kitchen Barrhaven Ottawa - Dream Touch Renovations finished buildKitchens
Modern ensuite bathroom Ottawa Hillcrest walk-in showerBathrooms
Greely Legal Suite OttawaBasements
Manotick coach home, 750 sq ft secondary suite by Dream Touch RenovationsAdditions
Glebe coach home, 650 sq ft secondary suite by Dream Touch RenovationsAdditions
Kanata coach home, 550 sq ft secondary suite by Dream Touch RenovationsAdditions
Veterinary clinic construction Ottawa Eagleson design build healthcareCommercial
Ottawa dental office medical clinic construction contractorCommercial
Attic primary bedroom Ottawa with sloped ceiling and skylightsInteriors
Attic kids bedrooms Ottawa with shared play loftInteriors
Attic home office Ottawa with dormer and natural lightInteriors
Primary bathroom suite Ottawa Carlsbad SpringsBathrooms
Bold rust-marble curbless walk-in shower with grab bar OttawaBathrooms
Featured Work

Three Ottawa projects we're proud of.

Three recent Ottawa projects, and how we handled each client's situation.

Altavista Ottawa basement renovation before after Dream Touch Basement Renovation

Altavista Basement · 2024

An Alta Vista family had lived with an unfinished basement for fifteen years. They wanted a legal secondary suite for an aging parent, plus a family rec room. We worked within the existing foundation, added a proper egress window, built a compliant kitchenette and three-piece bathroom, and finished the rec room with sound-dampening between floors. 14 weeks from demolition to move-in.

Secondary suiteEgress windowSound dampeningPermit-managed
See more basement projects →
Ottawa home addition with black metal-roof dormer, cedar porch and red door by Dream Touch Renovations Home Addition

Westboro Addition · 2023

A growing Westboro family needed more space but loved their heritage bungalow's character. We designed a rear addition that added a main-floor family room and expanded primary suite above, matching the original red brick, roofline, and window proportions. We coordinated the structural engineering. First sketch to final inspection took 11 months.

Heritage-sensitiveSecond storeyStructural engineeredBrick matched
See more additions →
Orléans accessible primary bathroom with zero-threshold shower, grab bars and roll-under vanity by Dream Touch Renovations Accessibility

Orleans Accessible Primary Bathroom · 2024

The homeowner's husband had returned home after a stroke. The family had lived in Orleans for fifteen years and wanted to stay. We built a barrier-free primary bathroom with zero-threshold walk-in shower, 660-lb rated grab bars, roll-under vanity, and fold-down bench. Guests often don't notice the accessibility features, which is the point of universal design.

Zero-thresholdBarrier-freeOT-coordinatedSchluter-Kerdi
The full Orléans bathroom project → See accessibility work →
Coach Homes 2023–2025

Eight recent Ottawa coach home builds.

450–750 sq ft backyard ADUs across Manotick, the Glebe, Kanata, Dunrobin, Riverside, Orleans, and Kars. Bill 23-compliant, rental-ready.

Manotick 750 sq ft coach home Ottawa 2025
Manotick · 2025
750 Sq Ft Coach Home
Glebe 650 sq ft coach home Ottawa 2025
Glebe · 2025
650 Sq Ft Coach Home
Kanata 550 sq ft coach home Ottawa 2024
Kanata · 2024
550 Sq Ft Coach Home
Dunrobin 550 sq ft coach home Ottawa 2024
Dunrobin · 2024
550 Sq Ft Coach Home
Glebe 530 sq ft coach home Ottawa 2023
Glebe · 2023
530 Sq Ft Coach Home
Riverside 530 sq ft coach home Ottawa 2025
Riverside · 2025
530 Sq Ft Coach Home
Orleans 500 sq ft coach home interior Ottawa 2025
Orleans · 2025
500 Sq Ft Coach Home
Kars 450 sq ft coach home Ottawa 2025
Kars · 2025
450 Sq Ft Coach Home
Residential Work

Ottawa residential renovations by category.

Explore our Ottawa renovation examples by category. Where we have a matched before-and-after pair, drag the slider handle to reveal the finished result.

Basement Renovations

Rec room finishes, simple refreshes and legal secondary suites that earn rent. Ottawa basement pricing depends on waterproofing, egress windows, plumbing and electrical changes, and finish level.

Alta Vista Ottawa basement renovation after: finished legal secondary suite
Alta Vista Ottawa basement before renovation: unfinished
Before After

Alta Vista · 2024 · Legal secondary suite conversion

See all basement work →
Legal suiteEgress windowSound dampening

Kitchen Renovations

Carlsbad Springs heritage kitchens, Manotick open-concept conversions and simpler refreshes. Ottawa kitchen pricing depends on cabinetry, layout changes, structural work, and material selections.

Ottawa open-concept kitchen renovation with twin white islands and dining area by Dream Touch Renovations

Manotick · 2024 · Full open-concept kitchen transformation

See all kitchen work →
Wall removalIslandPremium finishes

Bathroom Renovations

Powder rooms, main baths, primary ensuites, and accessible bathroom design. Ottawa bathroom pricing depends on waterproofing, plumbing relocations, tile work, and fixture selections.

Ottawa bathroom renovation after: completed ensuite by Dream Touch Renovations
Ottawa bathroom before renovation: original condition
Before After

Ottawa · Recent · Bathroom renovation transformation

See all bathroom work →
Walk-in showerDouble vanityHeated floors

Home Additions

Rear additions, second storey additions, bump-outs, and major reconfigurations. Our Ottawa additions include small bump-outs and whole-home transformations.

Ottawa home addition after: completed second-storey addition by Dream Touch Renovations
Ottawa home addition before: original home prior to addition
Before After

Ottawa · Recent · Second-storey addition

See all addition work →
Second storeyHeritage-matchedStructural engineered

Coach Home Builds

Backyard coach homes and ADUs under Bill 23, from compact single-bedroom units to premium two-bedroom residences. Ottawa coach home pricing depends on foundation type, servicing, site access, and finish level.

Ottawa backyard coach home ADU in Kanata built by Dream Touch Renovations

Kanata · 2024 · Backyard coach home ADU

See coach house work →
Bill 23 compliantSeparate utilitiesRental-ready

Multi-Unit Conversions

Duplex, triplex, and fourplex conversions under Ottawa's Bill 23, built as rental income properties. Scope depends on unit count, fire separation, servicing, and egress requirements.

Ottawa multi-unit conversion project by Dream Touch Renovations

Hintonburg · 2024 · Single-family to fourplex conversion

See multi-unit work →
Bill 23Fire separationLegal units

Sunroom Additions

Three-season and four-season sunrooms and custom solariums that extend Ottawa homes into their yards. Sunroom pricing depends on foundation, glazing, insulation, and heating requirements.

Ottawa sunroom addition built by Dream Touch Renovations

Stittsville · 2024 · Four-season sunroom addition

See sunroom work →
Four-seasonIntegrated heatingPanoramic views

Attic Conversions

We convert Ottawa attics into master suites, home offices, and family spaces. Attic conversions put unused square footage in older Ottawa homes to work.

Ottawa attic conversion to a primary suite by Dream Touch Renovations

The Glebe · 2023 · Heritage attic to primary suite

See attic work →
Dormer additionHeritage-sensitiveStructural engineered

Accessible Home Renovations

Barrier-free bathrooms, aging-in-place design, wheelchair-accessible homes, and mobility adaptations across Ottawa since 2004.

Orléans accessible primary bathroom by Dream Touch Renovations — zero-threshold shower and grab bars

Orleans · 2024 · Barrier-free primary bathroom

See accessibility work →
Zero-threshold660-lb grab barsOT-coordinated

General Renovations

Whole-home renovations, exterior facelifts, flooring and paint refreshes, and any renovation scope that doesn't fit a single category.

Kitchen from a Carlsbad Springs whole-home renovation by Dream Touch Renovations

Carlsbad Springs · 2024 · Whole-home renovation

See general renovation work →
Multi-roomCustom millworkComplete refresh
Commercial Work

Ottawa commercial projects.

Restaurants, retail, healthcare, offices, and industrial spaces across Ottawa.

Chop Steakhouse Hunt Club Ottawa restaurant fit-out

Restaurants & Bars

Franchise build-outs (Tim Hortons, Harvey's), independent fit-outs (The Chop Steakhouse), and commercial kitchen renovations across Ottawa.

Tim HortonsHarvey'sThe Chop Steakhouse
See restaurant work →
Fruits & Passion Ottawa boutique retail fit-out

Retail & Plazas

Independent boutiques, franchise rollouts, plaza common areas, and storefronts across Ottawa, including ByWard Market heritage spaces and Kanata Centrum.

Fruits & PassionLaurier OpticalPlaza work
See retail work →
Eagleson Veterinary Clinic Ottawa healthcare facility renovation

Healthcare Facilities

Medical offices, dental clinics, physiotherapy, veterinary hospitals, and specialty practices across Ottawa medical corridors.

VeterinaryOptometryMedical clinic
See healthcare work →
Federal government office fit-out in Ottawa by Dream Touch Renovations

Office & Corporate

Federal government, tech sector (Kanata North), law firms, and hybrid workplace reconfigurations across Ottawa's office market.

Federal workKanata techBoardrooms
See office work →
Multi-dock distribution warehouse interior in Ottawa by Dream Touch Renovations

Warehouse & Industrial

Distribution centers, self-storage facilities, cold storage, and light industrial fit-outs across Ottawa's industrial corridors.

DistributionSelf-storageIndustrial flex
See warehouse work →
Where We've Built

20 Years of Ottawa Projects across every neighbourhood.

Two decades of Ottawa renovations means we know the neighbourhoods, including heritage district rules in the Glebe and new-build conditions in Findlay Creek.

West End

KanataStittsvilleBells CornersNepeanBarrhavenWestboroHintonburgWellington Village

Core & Central

CentretownThe GlebeOld Ottawa SouthSandy HillNew EdinburghManor ParkVanierByWard MarketRockcliffe Park

East End

OrleansCumberlandGloucesterCyrvilleBeacon Hill

South

Alta VistaRiverview ParkHunt ClubFindlay CreekRiverside SouthGreelyCarlsbad SpringsManotick

Rural & Surrounding

CarpKemptvilleEmbrunRussellCarleton PlaceArnprior

Project completed in your neighbourhood? Call 613-862-4555. We'll share recent work and references in your specific area.

Design & Drawings

Ottawa architectural drawings and 3D renderings portfolio.

Dream Touch's design team also produces architectural drawings and 3D renderings for every project. A sample is below.

Before-and-after 3D kitchen renovation rendering by Dream Touch Renovations Ottawa

3D Renderings & Visualizations

Photorealistic pre-renovation visualizations so clients see their renovation before we build it.

See rendering work →
Structural engineers reviewing P.Eng-sealed drawings for an Ottawa home build

Structural Engineering Coordination

P.Eng-sealed drawings through trusted Ottawa partner firms, integrated with our construction plans.

See structural work →

Ottawa renovation projects, written up in full

Each of these Ottawa projects has its own write-up: what the owners wanted, the choices along the way and what drove the budget.

Common Questions

Portfolio questions, answered.

What visitors most often ask about our Ottawa renovation portfolio, photo archive, and reference process.

Call 613-862-4555
In many cases, yes. Some clients are happy to show their completed renovations to prospective Dream Touch clients. We coordinate these visits for serious prospects in the final stages of contractor selection. Call us at 613-862-4555 about your project and we'll suggest relevant reference visits.
Yes. Every photo in our portfolio is a real Ottawa project we've completed. We don't use stock photography or generic renovation images.
Yes. Our full project archive includes hundreds of photos across every category. At your initial consultation we can show you more photos of projects like yours, with similar styles, neighbourhoods, and budgets.
Many clients ask us not to publish photos of their homes, a request we always honor. We also keep the portfolio to representative work in each category instead of hundreds of similar projects. We can show you more projects during your consultation.
We have in-house crews for most trades, supplemented by long-term subcontractor relationships for specialized work (structural engineering, medical gas, specialty refrigeration, elevator installation). Every subcontractor we use has been vetted over years of working together. Our project managers coordinate all trades and are on-site daily.
Yes, with client permission. We keep a list of recent clients in every category who have agreed to take occasional reference calls from prospects. Where possible we match references to your project type and neighbourhood, and we share them at your initial consultation.
Featured case studies are from 2023–2024. Portfolio images run from 2020 to the present and are mostly recent work, plus some older significant projects marked with their completion year.
Call us at 613-862-4555 or use the contact form. Tell us what you're planning and what you'd like to see (similar projects, neighbourhoods or budgets), and we'll pull relevant examples from our full archive for your consultation.
Ready To Start Yours?

Your Ottawa renovation is our next project.
Let's build something.

We have spent two decades on Ottawa renovations. Call us, request a consultation, or use the form to tell us about your project. We respond within 24 hours on business days.

Call 613-862-4555
20 Years of Ottawa Projects4.7★ Google20 YearsBCIN-CertifiedLicensed & InsuredEst. 2004