How to Choose a Renovation Contractor in Ottawa
Choose an Ottawa renovation contractor by verifying six things before you sign: a licensed BCIN designer for permit drawings, general-liability insurance and WSIB coverage, a written fixed-price contract, checkable local references, who pulls the City permits, and a workmanship warranty in writing. Skip anyone who resists these questions.
In Ottawa, the right questions protect you.
Renovation contracting is largely unlicensed at the trade level, so the vetting falls to you. A handful of documents separate a professional from a risk. Get the six items in the checklist below confirmed in writing before you sign anything, and you will have screened out most of the trouble.
How to compare renovation companies in Ottawa (2026)
The right renovation company for your project is the one that can show you, in writing, who draws the permit set, a fixed price, a workmanship warranty and reviews you can read. Use these six checks on every quote, ours included.
| What to check | Why it matters in Ottawa | How Dream Touch answers it |
|---|---|---|
| Who draws the permit drawings | The City of Ottawa sets drawing requirements for building permits on additions, finished basements and secondary dwelling units, and the Ontario Building Code requires the designer to be qualified (BCIN) unless an exemption applies. | BCIN-certified permit design in-house. |
| A fixed price in writing | An open-ended quote is how a renovation budget grows after demolition. | Fixed-price contracts. |
| A written workmanship warranty | Tarion's statutory warranty applies to newly built homes, so on a renovation the warranty you get is the one in your contract. | A 1-year workmanship warranty. |
| One contract from design to final inspection | Splitting design, permits and construction between firms leaves gaps when something changes. | Design, City permits and construction under one contract. |
| A track record you can check | Years in business and public reviews are the two things you can verify before signing. | Renovating Ottawa homes since 2004, 4.7 stars on Google. |
| A written contract | Under Ontario law, any home renovation contract worth more than $50 must be in writing. | Fixed-price written contracts. |
Ask how fast the contractor answers calls and messages, because that is how the whole job will feel. One Dream Touch client, Brother Phil, wrote in a Google review in May 2023: "Moe is an excellent contractor...he's a great perfectionist and works efficiently. Plus, he responds quickly when you email or text him."
What Ontario law says about renovation contracts
Ontario's consumer rules add three protections to the written contract. If the estimate is part of the contract, the final price cannot run more than 10% over it unless you agree to new work or a new price. A contract of $50 or more signed in your home can be cancelled for any reason within 10 calendar days. The Province also recommends a down-payment of no more than 10%.
The same guidance makes permits the owner's responsibility, so if the contractor will get them for you, write that into the contract. WSIB says a homeowner who hires a contractor for repairs or renovations does not need a clearance certificate. Ask for one anyway: a clearance shows the business is registered and up to date with WSIB.
Dream Touch works as a general contractor in Ottawa on fixed-price written contracts, and each one falls under these rules.
Six things to verify before you sign.
| What to verify | Why it matters | How to confirm it |
|---|---|---|
| Licence / BCIN designer | Permit drawings must be prepared or sealed by a BCIN-certified designer (or architect/engineer where required) | Ask for the BCIN number and Schedule 1 designer details on the permit application |
| Insurance & WSIB | Protects you if a worker is injured or property is damaged on your job | Request a current general-liability certificate and a WSIB clearance certificate |
| Written fixed-price contract | Defines scope, allowances, payments and change orders so nothing is left to memory | Insist on it in writing before deposit; read the exclusions carefully |
| References | Real completed projects show the contractor can finish, not just start | Ask for recent local references and look at reviews you can verify |
| Permits handled | A pro manages the City of Ottawa permit and inspections, and stands behind the work | Confirm they submit through MyServiceOttawa, rather than asking you to pull the permit as owner |
| Warranty | A workmanship warranty is your recourse if something fails after completion | Get the warranty term in writing (Dream Touch provides a one-year workmanship warranty) |
Run this checklist on any Ottawa contractor, including us. Dream Touch is an Ottawa renovation company and expects to answer all six. If a company resists any row, treat it as a warning.
Red flags to walk away from.
- Cash-only or large up-front deposits with no written contract
- No proof of insurance or WSIB, or excuses about why they can’t show it
- Pressure to skip the permit or to pull it yourself as owner to save time
- A quote far below every other bid; thin scope usually comes back as change orders
- Vague scope and no clear allowances, payment schedule or timeline
- No verifiable references or reviews, or reluctance to provide them
- No written warranty on workmanship
Questions to ask every contractor.
- Are you a BCIN-certified designer, or who prepares and seals my permit drawings?
- Can I see current general-liability insurance and a WSIB clearance certificate?
- Do you provide a written, fixed-price contract with defined allowances and a change-order process?
- Who submits the City of Ottawa permit and coordinates inspections?
- Can you share recent local references and reviews I can verify?
- What workmanship warranty do you provide, in writing, and for how long?
- Will I have a single point of contact, and who is on site day to day?
Make a confident hiring decision.
Ottawa homeowner questions.
What licences should an Ottawa renovation contractor have?
Should I always get a written contract?
How many quotes should I get?
Who pulls the building permit?
What warranty should I expect?
Questions to Ask Your Ottawa Home Addition Contractor
A home addition is a major investment. Before you sign, ask these questions to protect your project:
- Are you BCIN-certified? – A BCIN-certified contractor can prepare permit drawings and manage the entire permit process. Make sure the contractor can handle this in-house.
- Do you offer a free lot feasibility review? – A reputable contractor will check zoning, setbacks, and frost depth before you commit. Dream Touch provides this within 48 hours.
- Is the price fixed or time-and-materials? – Fixed-price contracts eliminate surprise costs. Ask for a locked scope before work begins.
- Who will be on site daily? – Clarify whether the contractor uses a dedicated crew or subcontractors. A single team means better quality control.
- What warranties do you include? – At minimum, expect a 1-year workmanship warranty.
- How do you handle winter construction? – Ottawa’s frost depth affects footings and timelines. A good contractor plans around it.
For a home addition built by one BCIN-certified team with a fixed-price contract, see how we work.
Interviewing Ottawa contractors?
Bring this checklist to every meeting, including ours. Dream Touch has worked as a renovation contractor in Ottawa since 2004. We’re happy to show our BCIN, insurance, WSIB, contract and warranty up front. Book a free, no-pressure consultation.