Dream Touch Renovations trusted Ottawa supplier and trade partners showroom
Our Ottawa Network · P.Eng Partners · Material Suppliers · Trade Specialists

Our Ottawa renovation partners.
The people behind every Dream Touch project.

Behind our crews are the engineers who stamp the drawings, the suppliers whose products we specify, and the Ottawa professionals we coordinate with on every project.

Call 613-862-4555
3
P.Eng partner firms
15+
Material partnerships
20 yrs
Of Ottawa relationships
20 yrs
Ottawa projects delivered together
Free design consult
No deposit required.
Permits + drawings
In-house engineering.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.
How We Work With Others

Good renovations require good relationships.

A good renovation contractor depends on a network built up over years: a drafter who prepares clean permit drawings, an engineer who returns calls, a supplier with reliable inventory, and a mortgage broker who picks up the phone.

Over twenty years, Dream Touch has built an Ottawa network of professional partners, material suppliers and community relationships. These are the main ones.

Category One

Professional Partners.

The engineers, designers and consultants we bring in alongside our construction crews.

Ottawa P.Eng Structural Engineering Partners

Three Ottawa P.Eng-licensed firms we've partnered with for over a decade. Each specializes in different scopes, such as residential additions, commercial work or foundations. We engage the right firm, manage the coordination and integrate the stamped drawings. We share firm names during project engagement.

See structural coordination →

BCIN-Certified Architectural Design

In-house BCIN-certified designers prepare permit-ready drawings for most residential and small commercial projects. For larger or specialized projects, we coordinate with Ottawa-area OAA-licensed architects. Every submission includes Schedule 1 designer documentation.

See architectural plans →

Ottawa Heritage District Consultants

For projects in Ottawa's heritage conservation districts (The Glebe, Centretown, Sandy Hill, Westboro, ByWard Market), we coordinate with heritage consultants who handle Built Heritage Committee review, which keeps heritage projects moving through approvals.

Energy Consultants & Building Scientists

For whole-home renovations, additions, and accessibility projects seeking energy certifications, we coordinate with Ottawa energy consultants and EnerGuide auditors, which gives access to federal and provincial funding that offsets renovation costs.

Category Two

Material & Trade Partners.

Manufacturers whose products we specify most often. None of these listings are sponsored; they're the brands that show up in our work.

Plumbing & Bathroom Fixtures

Kohler

Our most-specified fixture brand: Memoirs, Purist, and Veil for standard residential work, and the Elevance accessibility line for barrier-free bathrooms. Its integrated grab-bar systems are the cleanest we've worked with.

Moen

Mid-range fixtures that hold up well in Ottawa homes. The Home Care accessibility line offers 500-lb rated grab bars at reasonable prices. Standard Moen faucets routinely outlast warranty periods.

Grohe & Delta

European-engineered Grohe for premium residential bathrooms, and Delta for mid-range and commercial work. Both brands stand behind their warranties.

Accessibility & Specialty Products

Pressalit

Danish-engineered accessibility hardware, including grab bars, fold-down supports and toilet lifts. It is 660-lb rated and used in Scandinavian hospitals. It costs more than standard hardware, which we think is worth it for anything meant to catch a fall.

Schluter-Kerdi

Industry-standard waterproofing for zero-threshold showers, which we use in barrier-free bathrooms and premium residential ensuites. We install strictly to Schluter's published specifications.

Lifeway Mobility

Ottawa-based installer for stair lifts, platform lifts, and home elevators. We coordinate through Lifeway because they handle warranty and maintenance on powered equipment across Ottawa.

Kitchen & Custom Millwork

Blanco & Fleurco

Blanco sinks and Fleurco shower enclosures are our default specifications. Both are distributed in Canada with reliable inventory and parts, and both hold up well in Ottawa conditions.

Custom Millwork (In-House)

Kitchen cabinetry, bathroom vanities, built-in millwork, and custom pieces built in our Nepean shop. Claude runs the shop and has been with Dream Touch since 2008. Building in our own shop gives us control over timelines, quality and design changes that an outsourced cabinet order can't match.

Category Three

Ottawa Community Partners.

Local professionals, suppliers and services we've worked with regularly over twenty years in Ottawa.

Trusted Ottawa Mortgage Brokers

For clients asking about renovation financing, we introduce Ottawa mortgage brokers we've worked with for years. They are licensed professionals who specialize in HELOCs, refinancing and Bill 23 multi-unit financing, and we take no commission for the introduction.

See financing options →

Ottawa Sub-Trades

Licensed Ottawa electricians, plumbers, HVAC contractors, and specialty trades we've worked with for years. Many have been on Dream Touch projects since 2010 or earlier, so the electricians who wired your neighbour's renovation are likely the ones on yours.

Ottawa Lumber & Construction Supply

Rona Pro, Home Depot Pro, and several Ottawa-area independent lumber yards. Our long-standing commercial accounts give us specialty stock, coordinated large deliveries and preferred pricing, which we pass along to clients.

Local Disposal & Recycling Partners

Ottawa-area waste management for construction debris removal and material recycling. Every project includes responsible disposal, with metals, wood and cardboard recycled.

Accreditations

Certifications, licenses, and memberships.

Formal credentials behind our Ontario renovation business.

01
Registered Ontario Business

Registered Ontario renovation contractor, operating since 2004. Permit drawings prepared under BCIN Schedule 1 via the Ministry of Municipal Affairs and Housing. Fully insured.

02
$2 Million Commercial Liability Insurance

Commercial general liability through a licensed Ontario insurer. Certificate available on request for commercial clients.

03
WSIB Active

Workplace Safety and Insurance Board registration. Active clearance certificates available for property managers and commercial clients.

04
Google Business Profile 4.7★

4.7-star average across hundreds of verified Google reviews. All public and independently verifiable.

05
BCIN Schedule 1 Designer

Building Code Identification Number via our in-house design team. Authorized to prepare and submit permit drawings under the Ontario Building Code.

Common Questions

Partner questions.

How we work with suppliers, sub-trades and professional partners.

Call 613-862-4555
We get standard contractor pricing from suppliers, the same preferred-account rates most licensed GCs get, and no commissions or kickbacks on fixture specifications. We receive nothing for mortgage broker introductions. Engineering fees go directly to our P.Eng firms with no markup.
Professional engineering requires a P.Eng license through Professional Engineers Ontario, a designation we don't hold. We handle construction, our P.Eng partners handle structural design, and our project management coordinates the two.
Yes. The suppliers listed here are our defaults after twenty years of working with them. If you have your own suppliers or preferences, we work with them. Your choice takes priority on finish selections as long as the products meet code and quality requirements.
Both. In-house carpentry and general construction crews are employees. Specialty trades (electrical, plumbing, HVAC) are long-standing subcontractors, many working on Dream Touch projects for over a decade. All are licensed and insured and carry their own WSIB coverage.
Yes. Our certificate of insurance, WSIB clearance, Ontario contractor license and other credentials are available on request, and we routinely provide them to commercial clients, property managers and landlords. Call 613-862-4555 or email to request them.
Your Renovation, Our Network

The professionals behind every Ottawa project are part of yours.
Let's start.

When you hire Dream Touch, you get the network we've built over twenty years: engineers, designers, suppliers, sub-trades and community partners.

Call 613-862-4555