Spa-like primary bathroom renovation before and after in Ottawa by Dream Touch Renovations
Dream Touch Renovations Warranty · Ontario Workmanship Coverage · 1 Year Standard + Manufacturer Warranties

Our Ottawa renovation warranty.
1 year standard. Plus manufacturer warranties. No fine print.

Every Dream Touch renovation is backed by a 1-year workmanship warranty in your contract, plus the manufacturer warranties on the products we install. Read exactly what's covered below.

Call 613-862-4555
1 yr
Standard warranty (included)
Mfr.
Manufacturer warranties included
2 days
Warranty claim response
No fine print
Clear plain-English coverage
Free design consult
No deposit required.
Permits + drawings
In-house engineering.
1-year DTR warranty
Plus manufacturer warranties.
Flexible financing
Trusted Ottawa brokers.
What You Get

What our 1-year warranty covers.

Every renovation includes 1-year workmanship coverage from project completion. Specifically:

Workmanship Defects

If something we installed fails because of how we installed it, we fix it. Examples: tile coming loose, cabinets pulling from walls, paint peeling from prep issues, trim separating.

Structural Integrity

Any structural work we performed (framing, headers, beams, foundations) is covered for structural soundness. If something we built isn't supporting what it should, we fix it.

Installation Integration

How we integrated materials and fixtures. Examples: plumbing connections leaking from our installation, electrical work failing because of how we wired it, drywall seams visible from finishing issues.

Equally Important

What our warranty doesn't cover.

Here's what's NOT covered, including things you might assume are. Most are covered elsewhere (manufacturer warranties, insurance) explained below.

Manufacturer Defects

If a Kohler faucet leaks from a manufacturing flaw, that's Kohler's warranty, not ours. Same for cabinets, appliances, fixtures, materials. We provide all manufacturer documentation at completion.

Normal Wear & Tear

Everything wears with use. Paint scuffs from kids and pets, small caulking shrinkage in the first year, minor settling cracks in new drywall: these are normal. Not warranty issues.

Misuse or Neglect

Damage from improper use, lack of maintenance, unfixed leaks, or modifications by other contractors. We cover our work, not its abuse.

Acts of Nature

Floods, fires, hail, falling trees, ice storms: covered by home insurance, not our warranty. Same for pre-existing conditions outside our scope.

Beyond Our Workmanship

Manufacturer warranties on your products.

Beyond our 1-year workmanship warranty, the products we install — cabinets, faucets, appliances, roofing, windows, flooring — carry their own manufacturer warranties. We hand you every warranty document at completion so you can claim directly.

Step 01

Documentation at Handover

At your final walk-through we hand over every manufacturer warranty and care sheet for the products in your renovation.

Step 02

Register Where Needed

Some manufacturers require you to register the product to activate the full warranty. We flag which ones and how, so nothing lapses.

Step 03

How Claims Work

Manufacturer defects are handled directly with the manufacturer. If you are not sure who covers what, call us and we will help you route it.

If Something Needs Attention

How to file a warranty claim.

We respond to warranty claims within 2 business days. The 4-step process:

2
Site Visit

Within 2 business days, we schedule a site visit to assess the issue. No charge for warranty assessments.

3
Repair Plan

If covered, we provide a written repair plan and schedule the work. If not, we explain why and suggest next steps (insurance, manufacturer warranty).

4
Repair Completion

Warranty repairs completed at no charge. Most scheduled within 2–3 weeks of assessment.

Common Questions

Warranty questions.

Real answers, no fine print, no marketing language.

Call 613-862-4555
The terms are exactly what's on this page, with no hidden exclusions in contracts, no asterisks. The full warranty document at project completion matches what you see here.
No. Warranty activates automatically at substantial completion. We retain your project file, so when you call we have it ready.
We work with you to find the closest available match. If the substitute requires broader work to look right (e.g., re-tiling a larger area), we discuss options first. Workmanship coverage continues.
Yes. The 1-year workmanship warranty transfers to a new owner for the remainder of the period. The new owner contacts us within 30 days of transfer to confirm.
We still want to know. Many post-warranty issues turn out to be manufacturer defects, insurance items, or repairs at fair pricing. Call us, and we'll help you figure out the best path either way.
Now You Know What's Covered

Ready to start your Ottawa project?
Backed by our 1-year workmanship warranty.

Twenty years of Ottawa projects. A clear, honest warranty behind every one. Your project is next.

Call 613-862-4555