Renovated living and dining area before and after in Ottawa by Dream Touch Renovations
Dream Touch Renovations Reviews · Real Ottawa Clients · Verified on Google

What Ottawa clients say.
In their own words.

Dream Touch Renovations reviews from real Ottawa homeowners, business owners, and investors. Read our reviews on Google.

4.7★
Google rating
500+
Ottawa clients served
20 yrs
In business
Verified
Every review on Google
Free design consult
No deposit required.
Permits + drawings
In-house engineering.
1-year DTR warranty
Plus 25-year manufacturer.
Flexible financing
Trusted Ottawa brokers.
In Their Own Words

Featured Ottawa reviews.

Dream Touch Renovations testimonials from recent Ottawa clients. Full names and neighbourhoods shared with permission.

Dream Touch Renovations transformed my house into a dream home. From design to execution, they exceeded my expectations. The team's dedication and attention to detail was unmatched. Moe and his crew were professional, respectful, and responsive throughout. They treated our home as if it were their own. Highly recommend them for anyone considering a major renovation.

Samantha Thompson

Westboro · Whole-home renovation

via Google

We hired Dream Touch for a significant basement renovation after a water incident. They provided all the documentation we needed for our insurance claim, and as the project changed based on what we found behind the walls, Dream Touch was flexible and solution-focused. I've now worked with them on three separate projects. Reasonable pricing, quality workmanship, and a genuinely skilled crew.

Saralyn Hodgkin

Alta Vista · Basement and foundation repair

via Google

The team was excellent. They did a great job with the basement renovation after our basement flood. It was very affordable. The owner really worked within our budget without compromising on the work quality. Professional, attentive, and communicative throughout the project, from the initial consultation to the final walk-through. Would hire them again in a heartbeat.

Michael Rodriguez

Kanata · Post-flood basement renovation

via Google

Dream Touch Renovations remodeled our kitchen earlier this year. Everyone who enters our kitchen has given us very positive reviews. Moe and his team took a little longer to complete the job due to some cabinets not arriving on time and finding unexpected conditions behind one of the walls, but they communicated every step, worked within our budget, and went out of their way to help us with our new stove when the store wouldn't deliver. That kind of service matters.

Emma Davis

The Glebe · Kitchen renovation

via Google
More Ottawa Reviews

Shorter reviews from across Ottawa.

Additional Dream Touch Renovations reviews from clients across Ottawa neighbourhoods.

Moe and his team took great care of us during our basement renovation. The quality of the work is excellent and the team was professional from start to finish. We love our new basement and would recommend Dream Touch without hesitation.

Joan Arseneau

Orleans · Basement renovation

via Google

Dream Touch did our primary ensuite and it's beautiful. The team was respectful of our home, cleaned up every day, and finished on schedule. Moe took time to answer every question we had. Excellent experience.

Alana Michaels

Barrhaven · Bathroom renovation

via Google

We couldn't be happier with our new kitchen. From the design renderings to the final walkthrough, the whole process was well-organized. The craftsmanship is outstanding. Thank you to the entire Dream Touch team.

Ahmed Rashid

Hintonburg · Kitchen renovation

via Google

Our rear addition turned out exactly as we envisioned. The structural engineering coordination, the permit management, and the construction execution were all handled smoothly. Dream Touch lived up to every promise they made at the start.

Diana Thibodeau

Manotick · Home addition

via Google

We hired Dream Touch to make our home safer for my husband after his stroke. They were respectful, patient, and knowledgeable about accessibility design. The grab bars and roll-in shower have made a real difference. Grateful for their work.

Jocelyn Clarke

Stittsville · Accessibility renovation

via Google

Dream Touch built a coach home in our backyard under Bill 23. They handled everything: zoning, permits, drawings, construction. Our elderly mother lives there now and we generate rental income potential for the future. Excellent work.

Peter Thompson

Kanata · Coach home build

via Google

Converted a single-family property to a legal triplex with Dream Touch. The team knew Bill 23 inside and out, coordinated everything with the City, and completed construction on schedule. Rental income is exceeding projections.

Isabelle Chen

Centretown · Multi-unit conversion

via Google

Major renovation of an older country home. Dream Touch handled kitchen, bathrooms, flooring, paint, and structural repairs in one coordinated project. Pricing was fair, communication was clear, craftsmanship was excellent.

Robert MacLeod

Carlsbad Springs · Whole-home renovation

via Google

Our small café renovation with Dream Touch was handled professionally and on schedule. They worked after hours so we could keep serving customers, coordinated all the city permits and health department inspections. Very happy with the result.

Marie-Claire Dubois

Vanier · Restaurant fit-out

via Google

Small bathroom that turned out beautifully. Dream Touch respected our budget, delivered on time, and the finish quality is better than we expected. Would definitely use them again for future renovations.

Kevin O'Brien

Findlay Creek · Bathroom renovation

via Google

Heritage home addition is complicated. Dream Touch navigated the heritage district review, coordinated the structural engineering, and delivered a second storey that matches our home's original character perfectly. Highly recommend.

Nadia Patel

The Glebe · Second storey addition

via Google

Multiple rooms renovated over a six-month project. Dream Touch was organized, communicative, and professional throughout. The crew was respectful of our home and family. Fair pricing and excellent workmanship.

Thomas Reeves

Nepean · General renovation

via Google
Verify Every Review

Every testimonial is verifiable on Google.

4.7-star rating across hundreds of verified Google reviews, including reviews not featured above.

See All Reviews on Google →
Dream Touch Client?

Share your experience.

Completed a project with us? Share your experience on Google or through a direct review. Your feedback helps other Ottawa homeowners.

Common Questions

Review questions.

How we handle reviews, references, and client feedback, answered honestly.

Call 613-862-4555
Yes. Every review is from an actual Dream Touch client, shared with their permission. Many are posted publicly on our Google Business Profile; others were shared with us directly.
Yes. We maintain a reference list of recent clients who've agreed to take calls from serious prospects. When you're in final-stage contractor selection, we arrange a call with a client whose project matches your scope.
Because no contractor is perfect. Occasionally timelines slip from supplier delays, unexpected site conditions, or scope changes, and some clients are understandably frustrated. We address issues honestly. Our 4.7 average reflects consistent effort over twenty years of projects. Real reviews, not manipulated ratings.
No. We don't pay for reviews, offer discounts, or solicit with incentives. We ask clients at project completion whether they'd share their experience. Reviews are entirely voluntary.
Through Google (click "See All Reviews on Google" above) or directly via the contact form. Both help us improve and help future Ottawa homeowners make informed decisions.
Ready To Be Our Next Success Story?

Let's start your Ottawa project.
The next review might be yours.

Twenty years of Ottawa renovations. 4.7 stars from clients who've trusted us. Your project is next.

Call 613-862-4555