Cost Breakdown

Hardwood Floor Cost in Ottawa
What Drives the Pricing

Nov 7, 2025 · 6 min read · By Dream Touch Renovations Ottawa

Hardwood Floor Cost in Ottawa: what drives the pricing
All articles

Hardwood is a flooring choice where the climate matters more than the catalog. What works in Toronto or Vancouver does not always work in Ottawa, where humidity swings 50 percent between February and July, and where basement slabs sit on top of frozen ground for four months a year.

I have installed and refinished hardwood in roughly 400 Ottawa homes since 2004. Below is what actually drives the material and labour price, ordered from entry-level to premium, plus the Ottawa-specific moisture and winter considerations that change which product you should be buying.

Engineered hardwood: what moves the price

Engineered is a wood-veneer top layer (1mm to 6mm thick) glued to a plywood or HDF core. It moves less than solid hardwood with humidity changes, which matters in Ottawa basements and over concrete slabs. Three tiers, by inclusions rather than price:

Installation adds to the material on top of that: underlayment, baseboard removal and reinstall, and basic transitions all factor in.

Solid hardwood: what moves the price

Solid hardwood is one piece of wood, typically 3/4 inch thick. It is what was in your grandmother's house. It refinishes more times than engineered. It also moves with humidity more. From least to most expensive:

Installation adds to the material here too, including site finishing if it is unfinished hardwood (sand, stain, three coats of polyurethane).

Site-finish vs pre-finish in Ottawa winters

Pre-finished hardwood ships with the factory finish already applied. You can walk on it the day of install. Site-finish hardwood requires three to five days after install for sanding, staining, and three coats of poly. In Ottawa winters, site-finishing is hard because the polyurethane needs 18 to 22 degrees Celsius to cure properly.

We schedule site-finish jobs for the spring and fall when we can hold those temperatures without running the furnace at full blast.

Refinishing existing hardwood: the budget-friendly path

If your existing floors are solid hardwood and not too damaged, refinishing is the most budget-friendly way to make them look new. Sand off the old finish, repair gaps and damaged boards, stain (optional), and apply three coats of polyurethane.

The lower end is a standard refinish: water-based polyurethane, satin or semi-gloss finish, no stain. The price climbs with a stain change (light to dark, or red oak stained to a white oak look), an oil-based finish, or a hard-wax oil finish.

Refinishing takes a typical 1,200 sq ft Ottawa main floor four to six working days, plus 24 to 48 hours of dust settling before furniture moves back. Plan on staying out of the house for a week.

You can refinish solid hardwood roughly five to seven times over its life. Engineered with a 4mm wear layer can be refinished once or twice. Engineered with a 2mm wear layer cannot be refinished at all.

Installed cost: how the options stack up

Putting material plus labour together for an Ottawa main floor, here is the order from most budget-friendly to most premium:

Ottawa moisture and winter considerations

Ottawa swings from 65 percent humidity in summer to 25 percent humidity in winter when furnaces dry the air. Solid hardwood will gap in winter and tighten in summer, every year. The wider the plank, the more visible the gaps.

For wide plank (7-inch and wider) in Ottawa: we strongly recommend engineered, not solid. The plywood core resists humidity-driven movement. Solid wide plank in an Ottawa house with a forced-air furnace will gap noticeably every winter.

For basements and ground-floor concrete slabs: only engineered. Solid hardwood is not approved for direct application over slab because of moisture transmission from the slab itself, even with a vapor barrier.

For pre-1950 homes (Glebe, Sandy Hill, Westboro): the existing subfloor is usually plank, not plywood. Plank subfloors over a crawlspace can be damp underneath. We test moisture before install with a Tramex meter. If the subfloor is over 14 percent moisture content, the install gets postponed or we add a vapor retarder underlayment.

Wide plank solid hardwood is beautiful in a magazine photo. In Ottawa, it gaps every winter. Engineered wide plank looks identical and stays flat.

Whole-home scope: how the choices play out

For a 1,400 sq ft main floor in a typical Ottawa two-storey, the scope decision drives the proposal:

Mid-tier scope, engineered wide plank: the most common choice. Includes underlayment, baseboard pull and reinstall, and stair-nose tread covers if there is a staircase touching the new floor.

Premium scope, European white oak engineered: a step up for the better wear layer, the wider planks, and a custom stain match.

Refinish existing hardwood: major savings if the existing floor is solid hardwood and structurally sound, because you reuse the material you already own.

Stairs add to the scope: each stair (tread, riser, nosing, finish) is priced separately, so a staircase touching the new floor is a distinct line item, not an afterthought.

Real example: 1,650 sq ft Manotick bungalow

Existing 1985 red oak strip floors, scratched and stained, no water damage. The client considered tearing out and replacing with engineered wide plank (three weeks of work). We recommended refinish and a stain change to a darker espresso (six days). Same visual result for a fraction of the cost, because we reused the existing solid floor. Refinished floors will give them another 15 to 20 years.

Where to spend and where to skip

Spend money on: wear layer thickness (4mm or higher means refinishable), wood species (white oak holds up better than red oak in high-traffic areas), and the underlayment (cheap foam underlayment squeaks within two years).

Skip money on: ultra-premium imported brands when the construction matters more than the name (a Canadian-made engineered with a 4mm wear layer is functionally equivalent to a pricier European brand with the same wear layer), and exotic species like Brazilian cherry or tigerwood (they look dated within a decade and refinishing them changes the colour).

For our full kitchen and main-floor renovation scope including hardwood specs, see the Ottawa kitchen renovation page.

Bottom line: mid-tier engineered wide plank is the sweet spot for a typical Ottawa hardwood floor, and you should pick engineered (not solid) for anything over 5 inches wide or anywhere near a slab. Call 613-862-4555 for a fixed-price, itemized walk-through on your floor scope.

Frequently asked questions

Is engineered or solid hardwood better for Ottawa homes?

For wide planks of 7 inches or more, and anywhere over a concrete slab, engineered hardwood is the better choice in Ottawa. Humidity swings from about 65 percent in summer to 25 percent in winter, and solid hardwood gaps every winter, more visibly the wider the plank. Engineered hardwood's plywood core resists that movement. Solid hardwood is not approved for direct application over a slab.

How many times can a hardwood floor be refinished?

Solid hardwood can be refinished roughly five to seven times over its life. Engineered hardwood depends on its wear layer: a 4mm wear layer allows one or two refinishes, a 5mm to 6mm layer two or three, and a 2mm layer cannot be refinished at all. That makes wear layer thickness, 4mm or more, one of the places worth spending on.

How long does it take to refinish hardwood floors?

Refinishing a typical 1,200 sq ft Ottawa main floor takes four to six working days: sanding off the old finish, repairing gaps and damaged boards, optional stain, and three coats of polyurethane. Allow another 24 to 48 hours of dust settling before furniture moves back, and plan on being out of the house for about a week.

Can site-finished hardwood be installed in an Ottawa winter?

Site-finishing is hard in an Ottawa winter because polyurethane needs 18 to 22 degrees Celsius to cure properly. Site-finished hardwood takes three to five days after installation for sanding, staining and three coats of poly, so those jobs are best scheduled in spring and fall. Pre-finished hardwood arrives with the factory finish applied and can be walked on the day it is installed.

Can hardwood go over an old plank subfloor in a pre-1950 home?

Yes, after a moisture test. Pre-1950 homes in the Glebe, Sandy Hill and Westboro usually have plank subfloors rather than plywood, and over a crawlspace they can be damp underneath. A Tramex meter reading comes first: if the subfloor is over 14 percent moisture content, the installation is postponed or a vapour retarder underlayment is added.

Want this kind of insight applied to your project?

Free in-home consultation. Fixed-price quote. An honest conversation about what's possible for your Ottawa home.

Get a Free Quote

Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555

Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.

Free Quote