A spice rack is small but loaded — 20 to 40 small jars of spices add up to 8 to 15 lbs of contents that lever out from the wall. The cheap mounting screws and plastic anchors that ship with most racks fail within months once fully loaded, and the rack pulls free leaving glass jars on the floor.
This guide covers wall-mounted spice racks (the typical kitchen install) and inside-cabinet-door racks. Both are simple if anchored properly; both fail if anchored to bare drywall.
- Skill level
- Intermediate
- Time
- 15–30 min
- Steps
- 7
- Tools
- 6, listed below
- Materials
- 4, listed below
Before you start
Three things to settle:
1. Loaded weight. 20 spice jars at 1/2 lb each = 10 lbs. Plus rack weight = 12-14 lbs. The lever effect of the jars hanging out from the wall multiplies the load on the anchors. Plan hardware accordingly.
2. Where it goes. Standard kitchen mounts: above counter (within reach during cooking), inside a cabinet door (hidden but accessible), on a pantry wall (consolidates all spices). Each has different access trade-offs.
3. Anchor matched to the wall. Drywall: snaptoggles or E-Z Ancor. Wood (cabinet door interior): wood screws. Tile (backsplash mount): tile bit + snaptoggle. Plan based on the surface.
What you'll need
Tools
- Cordless drill with bits
- Drill bits matched to anchor type
- Stud finder
- Tape measure and pencil
- Torpedo level
- Phillips driver
Materials
- Spice rack (sized to your spice collection)
- Snaptoggles or E-Z Ancor (for drywall)
- Wood screws #6 × 1" (for cabinet door interior mounting)
- Painter's tape (for marking)
Inside-cabinet-door mounting is forgiving
If you're mounting inside a cabinet door, you're driving wood screws into solid wood — no anchors needed. The cabinet door is rigid enough to hold loaded spices easily, and the rack stays hidden when the door is closed.
Just make sure the rack doesn't interfere with cabinet contents when the door closes. Measure cabinet depth first.
Step-by-step instructions
Decide location and reach
Stand at your cooking station. Reach for where a spice rack would be ideal — typically within arm's reach of the stove and 12 to 24 inches above the counter. Or pick the inside of a cabinet door directly above the cooking area.
Mark the proposed location with painter's tape and live with it for a day. Rack location matters more than rack design.
Mark the wall position
Hold the rack against the wall at the planned position. Mark each mounting hole through the rack with a pencil.
Verify level by laying a torpedo level on top of the rack before marking.
Find studs in the mount zone
Sweep with a stud finder. If a stud is within 1 inch of either mark, shift the rack to catch it — wood screws into stud are the strongest mount.
If no stud nearby, plan for snaptoggle bolts at each mount point.
Pre-drill or anchor
For stud mount: drill 1/8-inch pilot holes.
For drywall mount: drill 1/2-inch holes for snaptoggles. Install the metal channel and locking cap per the package.
Mount the rack
Drive screws through the rack's mounting holes into studs or anchors. Snug but not over-tightened.
Verify level one more time.
For inside-cabinet-door installs
Open the cabinet. Hold the rack against the inside of the door at the planned position.
Confirm the rack doesn't hit cabinet contents when the door closes — typical 4-inch depth racks fit most modern cabinets without interference. Older cabinets may not.
Mark mounting holes and drive #6 × 1-inch wood screws into the door from inside. The screws must not protrude through the door's outside face — measure door thickness first.
Load test before filling with spices
Place a stack of canned goods (8-10 lbs) on the rack briefly. Verify nothing shifts.
If the rack is solid, load with spices. If anything moves, fix the anchor before trusting it with glass jars.
Common mistakes that cost you
- Plastic cone anchors. Rated under 10 lbs. A loaded spice rack exceeds that. Use snaptoggles or stud-mount.
- Mounting on a door that's too thin. Hollow-core or thin doors can't hold the load and the screws may protrude. Verify door thickness before mounting.
- Skipping load test. A rack that holds empty doesn't always hold loaded. Test with weight before trusting glass jars.
- Over-tightening into the cabinet door. Strips the wood threads, especially in particle-board cabinet doors. Snug only.
- Wrong height. Above the counter at 12 to 24 inches is reachable. Higher and you can't see what's there; lower and it interferes with counter use.
Frequently asked questions
Should I mount on the wall or inside a cabinet door?
Wall-mounted is more accessible and visible — better if you want to grab spices fast during cooking. Cabinet-door-mounted is hidden and looks tidier in finished kitchens.
Many cooks have both: a small wall rack with frequently-used spices, plus a fuller rack inside a cabinet door for less-common items.
What's the right size spice rack?
20-jar racks handle a typical cook's collection. Serious cooks accumulate 40-60 spices and need a deeper or wider rack — or multiple racks.
Avoid magnetic racks unless you're willing to commit to clear-jar uniformity — they look great in photos but require buying matching jars.
Can I mount on a tile backsplash?
Yes, with a tile bit + snaptoggle anchor. Use painter's tape on the drill point to prevent walking, drill at low speed, no hammer mode.
Apply silicone behind the rack before mounting to seal the wall penetration against backsplash splatter.
What anchors should I use to hang a spice rack on drywall?
Snaptoggles or E-Z Ancor anchors are the right hardware for a spice rack on bare drywall, and a stud is better still. Twenty jars at about 1/2 lb each weigh 10 lbs, the rack brings the total to 12 to 14 lbs, and the jars lever out from the wall. Plastic cone anchors are rated under 10 lbs and fail once the rack is loaded. Drill 1/2-inch holes for snaptoggles.
How high should a spice rack be mounted above the counter?
A wall spice rack belongs 12 to 24 inches above the counter and within arm's reach of the stove. Higher than that and you can't see what's on the shelves; lower and the rack gets in the way of counter work.
Mark the spot with painter's tape and live with it for a day before drilling, because rack location matters more than rack design. Check level with a torpedo level before marking the holes.
When to call us instead
If you're customizing your kitchen with built-in spice storage as part of cabinet design, that's a kitchen-renovation scope. Pull-out spice cabinets (slim cabinets between larger units) are popular and require cabinet-design coordination.
Book a free 60-minute site visit →Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555
Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.
Related Ottawa services
Kitchen storage upgrades are a common refresh project. Our kitchen renovation team handles built-in storage and cabinet design as part of full kitchen scopes. Book a free 60-minute consultation.
Official references
- Do I need a building permit?, City of Ottawa
- O. Reg. 163/24: Building Code, Government of Ontario