Drill bits are matched to materials. Use the wrong bit and you'll burn out the bit, ruin the workpiece, or take forever to make a hole. The right bit cuts cleanly, lasts for many holes, and matches the work — wood, metal, masonry, tile, and glass each have specific bit types.
This guide explains which bit type to use for each material and what to look for in quality. Five common bit categories cover most renovation jobs.
- Skill level
- Beginner
- Time
- 5 min to learn the categories
- Steps
- 10
- Tools
- 2, listed below
- Materials
- 7, listed below
Before you start
Three things to settle:
1. Material drives bit choice. Wood: twist bits, brad-point, spade, hole saws. Metal: HSS twist bits or cobalt for hard metals. Masonry: carbide-tipped masonry bits. Tile: diamond-tipped or carbide tile bits. Glass: spear-point glass bits. Each is designed for the specific material's behaviour.
2. HSS vs carbide vs diamond. High-speed steel (HSS): general purpose, wood and most metals. Cobalt: harder than HSS, for stainless and tough metals. Carbide: very hard, for masonry and abrasive materials. Diamond: hardest, for tile, glass, ceramics.
3. Pilot holes are smaller than the screw. Pre-drill bits should be smaller than the screw shank — typically 60-70% of the screw's outside diameter. Hardwood needs pilot, softwood often doesn't. The drill bit set should include sizes matching the screws you use.
What you'll need
Tools
- Drill (cordless or corded)
- Bit storage (case)
Materials
- Twist bit set (1/16 to 1/2 inch, HSS) — most common, wood and metal
- Brad-point bit set — clean entry holes in wood
- Spade bits (3/4 to 1.5 inch) — fast wood holes
- Hole saw set — large diameter wood holes
- Masonry bit set (1/4 to 1/2 inch carbide) — concrete, brick
- Tile bit (1/4 inch diamond or carbide) — ceramic and porcelain
- Cutting fluid or wax — metal drilling lubricant
Use a smaller pilot bit before the final size
When drilling holes larger than 1/4 inch in wood or metal, pre-drill a smaller pilot hole first (1/8 inch typical). The pilot guides the larger bit and reduces tear-out.
Glass and tile: always pre-drill with smaller diamond bit; never start at full diameter.
Step-by-step instructions
Identify the material
Wood (hardwood vs softwood, finished vs raw).
Metal (steel, aluminum, stainless).
Masonry (concrete, brick, mortar).
Tile/ceramic.
Glass.
Each requires a different bit category.
Pick bit type for the material
Wood, small hole: twist bit.
Wood, clean entry holes (cabinetry): brad-point bit.
Wood, fast large holes (1/2 to 1.5 inch): spade bit.
Wood, large diameter (over 1.5 inch): hole saw.
Metal: HSS twist bit, cobalt for stainless.
Concrete/brick/mortar: carbide masonry bit (with hammer mode if drilling concrete).
Tile: diamond or carbide tile bit.
Glass: spear-point glass bit.
Pick size
For pilot holes: 60-70% of screw's outside diameter.
For through-holes (decorative or pass-through): match the bolt or wire diameter.
For mounting hardware: match the manufacturer's specified pilot size.
Inspect the bit before use
Sharp cutting edges (nicked or rounded edges = dull = burn marks).
Straight shank (bent bits wobble in chuck).
No visible damage.
Insert into chuck and tighten
Open chuck wide enough.
Insert bit shank fully (most modern self-tightening 3-jaw chucks).
Tighten by hand or with chuck key (older drills).
Verify bit doesn't wobble when running.
Drilling wood: brad-point vs twist
Brad-point: starts cleanly with no walking; clean entry holes for cabinetry and visible work.
Twist: works fine but can walk and chip on entry. Mark with awl first to prevent walking.
Variable speed: medium speed for hardwoods, faster for softwoods.
Drilling metal: lubricant + slow speed
Apply cutting oil or wax to the bit and workpiece — reduces heat, extends bit life.
Slow speed for hard metals; medium for aluminum.
Steady pressure; let the bit do the work.
If smoke appears: too fast, too dull, or insufficient lubricant.
Drilling masonry: hammer mode + slow
Use a drill with hammer mode (or rotary hammer for thick concrete).
Carbide masonry bit.
Slow speed; firm pressure.
Periodically pull bit out to clear dust from the hole.
Drilling tile: low speed, water cooling
Diamond bit or carbide tile bit.
Very low speed — high speed cracks tile.
Cool with water (drip or sponge) — heat cracks tile.
Pre-drill with smaller bit; gradually increase to final size.
Maintain bits for longevity
Clean wood resin off bits with mineral spirits.
Keep bits dry and stored in case.
Replace dull bits — sharpening twist bits is possible but tedious.
Carbide and diamond bits last 10× longer than HSS for their materials.
Common mistakes that cost you
- Wood bit in masonry. Bit destroys instantly. Use carbide masonry bit.
- High speed on tile or glass. Cracks. Slow speed, water cooling.
- No cutting fluid on metal. Bit overheats and dulls fast. Always lubricate metal.
- Wrong size pilot hole. Too big = screw doesn't grip. Too small = wood splits or screw breaks.
- Cheap unbranded bits. Wear out fast, oversize tolerances. A quality bit set lasts years.
Frequently asked questions
Do I need a separate set for metal?
HSS twist bits work for both wood and most metals — one set covers a lot.
Cobalt bits needed for stainless steel and hardened steel.
Avoid carbon-steel bits (cheap, dull fast).
How do I drill a hole through tile without cracking it?
Diamond bit or carbide tile bit.
Mark the hole; place painter's tape over the spot to prevent the bit from skating.
Very low speed, firm pressure, water cooling.
Pre-drill with smaller bit, increase gradually.
Can I sharpen drill bits?
Yes — bench grinder with a drill bit sharpening jig.
Many DIYers don't bother; new bits are cheap.
Carbide and diamond bits: don't try to sharpen at home.
What size pilot hole should I drill for a screw?
A pilot hole should be about 60 to 70% of the screw's outside diameter, smaller than the screw shank. Too big and the screw doesn't grip; too small and the wood splits or the screw breaks. Hardwood needs a pilot hole, while softwood often doesn't. For holes larger than 1/4 inch in wood or metal, drill a 1/8 inch pilot first to guide the bigger bit and reduce tear-out.
What drill bit should I use for concrete or brick?
Concrete, brick and mortar need a carbide-tipped masonry bit, with the drill in hammer mode, or a rotary hammer for thick concrete. A wood bit in masonry is destroyed almost instantly. Run the drill at slow speed with firm pressure, and pull the bit out periodically to clear dust from the hole. Carbide bits last about 10 times longer than HSS bits in the materials they are made for.
When to call us instead
Our crews carry full bit sets for every material on every job. Right bit, right size, every time.
Book a free 60-minute site visit →Dream Touch Renovations · 33 Roydon Pl, Suite 210, Ottawa, ON K2E 1A3 · (613) 862-4555
Renovating homes across Ottawa, Kanata, Nepean, Barrhaven, Orléans and Stittsville.
Related Ottawa services
If your renovation needs expert workmanship across all materials, our team handles it. Book a free 60-minute consultation.
Official references
- Hand Tools: General Hand Tool Operation, Canadian Centre for Occupational Health and Safety